| Course | ACC 202 Managerial Accounting |
|---|---|
| Module | Module 2 |
| Paper type | Project milestone, cost classification and formula |
| Length | About 1,070 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for ACC 202 Module 2
Project Milestone One: Cost Behavior and a Monthly Cost Formula for a Composite Small-Batch Candle Maker
[Student Name]
Southern New Hampshire University
ACC 202: Managerial Accounting
Module Two Project Milestone One
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Project Milestone One: Cost Behavior and a Monthly Cost Formula for a Composite Small-Batch Candle Maker
The Company and Its Relevant Range
Cedarline Candle Co. is a composite manufacturer of hand-poured soy candles sold through its own website, local gift shops and a few regional retailers. It operates from a leased workshop with two melting stations and a curing room, employs two salaried staff and pays pourers a piece rate for each candle. In the first half of 2025 it produced between 1,500 and 2,300 candles a month and sells each for 24 dollars. Within that range of 1,500 to 2,500 candles a month, the workshop, equipment and salaried staff can handle the volume without change, so the cost behavior assumptions below apply only inside it (Franklin et al., 2019).
Classifying Each Cost
Table 1 classifies Cedarline's monthly costs by behavior, with the reason for each classification.
Table 1
Monthly Cost Classification, Cedarline Candle Co.
| Cost | Behavior | Amount | Reason |
|---|---|---|---|
| Soy wax | Variable | $3.10 per candle | About 0.62 pounds of wax per candle at $5.00 a pound |
| Fragrance oil | Variable | $2.40 per candle | Fixed amount per candle by recipe |
| Jar and lid | Variable | $2.75 per candle | One per candle |
| Wick and label | Variable | $0.55 per candle | One set per candle |
| Pourer piece rate | Variable | $1.80 per candle | Paid per candle poured and finished |
| Packaging | Variable | $0.90 per candle | Box and padding per unit shipped |
| Sales commission | Variable | $1.20 per candle | 5% of the $24 price paid to the sales representative |
| Workshop rent | Fixed | $4,200 per month | Lease payment does not change with volume |
| Salaries (manager and designer) | Fixed | $9,800 per month | Paid regardless of output within the range |
| Equipment depreciation | Fixed | $650 per month | Straight-line over the equipment's life |
| Insurance | Fixed | $380 per month | Annual policy spread evenly |
| Website and software | Fixed | $520 per month | Subscriptions billed monthly |
| Utilities | Mixed | See Table 2 | Base charges plus energy used for melting and curing |
Note. Composite figures. Classifications hold within the relevant range of 1,500 to 2,500 candles a month.
Separating the Mixed Utility Cost
Utilities include fixed service charges and a variable amount for the electricity used to melt wax and run the curing room. Table 2 shows six months of production and utility cost.
Table 2
Monthly Production and Utility Cost, January to June 2025
| Month, 2025 | Candles produced | Utility cost |
|---|---|---|
| January | 1,800 | $1,476 |
| February | 1,650 | $1,410 |
| March | 2,050 | $1,598 |
| April | 2,300 | $1,730 |
| May | 1,500 | $1,330 |
| June | 1,900 | $1,541 |
Note. Composite figures.
The High-Low Calculation
The high-low method uses the months with the highest and lowest activity, April and May (Datar & Rajan, 2021). Between them, production changed by 800 candles, from 1,500 to 2,300, and utility cost changed by 400 dollars, from 1,330 to 1,730 dollars. The variable utility cost is therefore 400 dollars divided by 800 candles, or 0.50 dollars per candle. Subtracting the variable portion from April's total gives the fixed portion: 1,730 dollars minus 2,300 times 0.50 dollars, or 580 dollars a month. The same result follows from May: 1,330 dollars minus 1,500 times 0.50 dollars is 580 dollars. As a check, the formula predicts January's cost at 580 dollars plus 1,800 times 0.50 dollars, or 1,480 dollars, within 4 dollars of the actual bill, and it predicts March within 7 dollars.
The high-low method is quick but relies on only two months, so an unusual month at either end could distort the result. Here the other four months fit the line closely, which gives reasonable confidence in the estimate. With more data, regression would use every month and provide a measure of how well the line fits.
The Monthly Cost Formula
Adding the variable costs from Table 1 to the variable utility rate gives total variable cost of 13.20 dollars per candle: 3.10 dollars for wax, 2.40 for fragrance, 2.75 for the jar, 0.55 for wick and label, 1.80 for piece pay, 0.90 for packaging, 1.20 for commission and 0.50 for utilities. Fixed costs total 16,130 dollars a month: rent of 4,200 dollars, salaries of 9,800, depreciation of 650, insurance of 380, software of 520 and fixed utilities of 580. Cedarline's monthly cost formula is therefore total cost equals 16,130 dollars plus 13.20 dollars times the number of candles produced and sold.
At a price of 24 dollars, each candle contributes 10.80 dollars toward fixed costs and profit, a contribution margin ratio of 45 percent. The 10.80 dollar contribution margin, not the 24 dollar price, is the number every later decision in this project will turn on. At the June volume of 1,900 candles, the formula predicts total cost of 41,210 dollars against revenue of 45,600 dollars, a profit of 4,390 dollars.
Why the Classification Matters to the Owner
The owner's current habit is to divide the month's total costs by the number of candles made, which in June gives about 21.69 dollars a candle. That figure moves every month for reasons unrelated to efficiency: in a slow month the same 16,130 dollars of fixed cost is spread over fewer candles, so the average rises, and in a busy month it falls. Using it to price a wholesale order or judge a month's performance would mislead her. The cost formula separates the two effects. It shows that each additional candle costs 13.20 dollars no matter the month, and that the fixed 16,130 dollars must be covered by contribution margin before any profit appears. With that distinction, the owner can see that a slow month is not a sign that candles have become more expensive to make, and that a discount wholesale order at, say, 18 dollars still adds 4.80 dollars per candle to profit if there is spare capacity.
Limits and Next Steps
The formula is only as good as its assumptions. It holds within 1,500 to 2,500 candles a month; a large holiday order beyond that range would require a second shift or rented storage, and fixed costs would step up. Variable costs per candle assume stable prices for wax and jars, which have risen twice in two years. The commission applies only to wholesale sales, so a shift toward the website would lower variable cost per candle. Finally, some costs treated here as fixed, such as the designer's time spent setting up custom retailer orders, are really driven by activities rather than volume, and an activity-based view could assign them more accurately to the customers who cause them (Kaplan & Anderson, 2004). Milestone Two will use the formula to find the break-even point and the volume needed to reach the owner's profit target, and to test how those figures change if wax prices or the sales mix change.
References
Datar, S. M., & Rajan, M. V. (2021). Horngren's cost accounting: A managerial emphasis (17th ed.). Pearson.
Franklin, M., Graybeal, P., & Cooper, D. (2019). Principles of accounting, volume 2: Managerial accounting. OpenStax. https://openstax.org/details/books/principles-managerial-accounting
Kaplan, R. S., & Anderson, S. R. (2004). Time-driven activity-based costing. Harvard Business Review, 82(11), 131-138.
What the ACC 202 Module 2 instructions ask for
Project Milestone One in ACC 202 usually asks you to classify a company's costs by behavior and develop a cost formula. Prompts often supply monthly cost data and ask you to identify fixed, variable and mixed costs, separate the mixed costs with the high-low method or regression and write the cost equation. Some sections use an Excel template. The milestone is short, with tables and the calculation shown. Cite the ACC 202 textbook in APA 7 if you explain methods. State the relevant range. The ACC 202 project guidelines explain that later milestones use this formula for break-even, budgets and decisions, so accuracy here carries through the term.
How this ACC 202 Module 2 project milestone one example is built
The company section describes Cedarline's workshop, products and monthly output range. A table lists each cost with its monthly amount and its behavior, with a short reason for each classification. The mixed cost section explains why the utility bill rises with pouring but never falls to zero. The high-low section picks the highest and lowest production months, finds the variable rate by dividing the cost difference between those months by the candle difference and subtracts to find the fixed part. The formula section adds all fixed costs and all variable rates into one monthly equation. The last section explains how the owner can use the formula for pricing and planning.
Where the ACC 202 Module 2 rubric puts the points
ACC 202 grades Milestone One on cost classification, the separation of mixed costs, the cost formula and the explanation, each on SNHU's four levels for ACC 202. Classification carries heavy weight; graders reward correct behavior for every cost with a reason. The high-low row rewards the right months chosen by activity, not by cost, and the arithmetic shown step by step. The formula earns credit when it combines all fixed and variable parts correctly. Explanation scores well when it says how the owner will use the formula. A clear table makes checking easy, and a stated relevant range shows the grader the student knows where the formula stops working.
ACC 202 Module 2 help: the mistakes that cost points
Milestone One submissions often lose points by choosing the high and low months by cost rather than by activity. Another common gap is leaving the mixed cost unsplit and calling it fixed or variable. Some students forget to add the fixed part of the mixed cost to total fixed costs. Others give a formula without stating the relevant range. Watch units; the variable rate should be per candle, not per batch, unless the formula is written that way throughout. Check the formula against one month's actual total. Finally, explain the use of the formula, because an ACC 202 grader wants to see that the cost equation is a tool the owner will rely on in every later milestone. Round the variable rate sensibly, to the cent.
Get ACC 202 Module 2 written to your instructions
Send your ACC 202 project guidelines, Milestone One rubric and the company data in your workbook. A cost classification and cost formula built from your figures come back within 24 to 48 hours; your first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More ACC 202 papers and related BS Business Administration samples
- ACC 202 Module 1 Cost Behavior Discussion: A coffee roaster sorts its costs
- ACC 202 Module 3 Costing Methods Assignment: Process, job order and ABC costing
- ACC 202 Module 4 Project Milestone Two: Break-even and scenarios for Cedarline
- ACC 202 Module 5 Operating and Cash Budget Assignment: Holiday quarter budgets for Cedarline
- ACC 202 Module 6 Variance Analysis Assignment: November variances for Cedarline
- ACC 202 Module 7 Relevant Cost Decision Analysis: Special order and dropping a product line
- ACC 202 Module 8 Final Project Memo: Final memo to the candle maker's owner
- QSO 415 Module 3 Project One: A Business Case for Collaborative Welding Robots
- ACC 427 Module 8 Digital Forensics Assignment: Imaging the Scale-House Computer and Building a Timeline
- OL 322 Module 7 Final Project: Change Management Plan
- INT 220 Module 4 Discussion: The Fee to Speed a Permit in Nairobi
ACC 202 Module 2 questions, answered
What does ACC 202 Project Milestone One require?
Milestone One of the ACC 202 project usually asks students to classify a company's costs as variable, fixed or mixed, separate mixed costs into their components and explain the classifications, often in a project workbook with a short written explanation. The results feed later work on cost-volume-profit analysis and budgeting.
How does the high-low method work?
The high-low method takes the periods with the highest and lowest activity, divides the change in total cost by the change in activity to find the variable cost per unit, and then subtracts the variable portion from total cost at either point to find the fixed cost.
What is the relevant range?
The relevant range is the span of activity within which cost behavior assumptions hold. Fixed costs stay fixed and variable costs per unit stay constant only within that range; producing far more might require a second shift or more space, changing the costs.
Where can I find a free ACC 202 Module 2 Project Milestone One sample?
This page holds the full milestone: a candle maker's costs classified by behavior, utilities split with the high-low method and a monthly cost formula built for the rest of the project. Use it as a model.
What is the weakness of the high-low method?
It uses only two data points, the highest and lowest activity months, so an unusual month at either end can distort the result. Regression uses all the data and usually gives a more reliable cost formula.