| Course | ACC 660 Controllership |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment building a 13-week cash flow forecast |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Accounting |
| Updated | October 2026 |
Free sample paper for ACC 660 Module 5
Thirteen-Week Cash Flow Forecast, Fourth Quarter
[Student Name]
Southern New Hampshire University
ACC 660: Controllership
Module Five Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Thirteen-Week Cash Flow Forecast, Fourth Quarter
Introduction
The fourth quarter brings an unusual cluster of payments: a quarterly estimated tax payment, quarterly doctor production bonuses, a new MRI for the Denver hospital, the closing of a hospital acquisition in Fort Collins and the term loan's quarterly interest and principal. The sponsor asked the controller whether the group can absorb these without breaching its covenants. This assignment builds a 13-week direct cash forecast starting with $6.2 million of cash and a $25 million revolver with $9 million drawn (Roehl-Anderson, 2013).
Receipts and Payments
Receipts are mostly card payments at the time of service, which settle in two days, so weekly receipts track revenue closely at about $4.37 million. Pet insurance reimbursements and referral clinic receivables are small and are included in that figure. Payroll of about $3.37 million is paid every other week. Drug and supply vendors are paid weekly, about $0.92 million, and other operating and overhead costs about $0.55 million a week. Rent of $1.23 million is paid in the first week of each month. Nonoperating items are scheduled by date: the $3.0 million estimated tax payment in week 3, $1.8 million of bonuses in week 5, the $2.2 million MRI in week 7, the $14 million acquisition in week 9, funded by a $10 million delayed-draw term loan and $4 million of cash, and $5.0 million of interest plus $0.59 million of principal in week 13.
The Forecast
Thirteen-week forecast summary, in millions
| Weeks | Receipts | Disbursements | Net flow | Ending cash before revolver |
|---|---|---|---|---|
| 1 to 4 | $17.48 | $16.85 | $0.63 | $6.83 |
| 5 to 8 | 17.48 | 17.85 | (0.37) | 6.46 |
| 9 to 13 | 31.85 | 38.28 | (6.43) | 0.03 |
Week by week, cash dips to $3.93 million in week 3 after the tax payment, $3.33 million in week 5 after bonuses, $0.76 million in week 9 after the acquisition closes and nearly zero in week 13 after interest. The company's policy is to hold at least $2 million of operating cash across 14 hospitals, enough to cover a payroll shortfall or a delayed card settlement, so the plan draws $2 million on the revolver in week 9 and another $2 million in week 13, leaving $4.03 million of cash at quarter end and $12 million of revolver availability. Each draw is requested two business days ahead, as the credit agreement requires.
Covenant Tests
The loan has two financial covenants. The minimum liquidity covenant requires cash plus revolver availability of at least $10 million at all times; the lowest point in the forecast is about $16 million, so it passes comfortably. The debt-to-EBITDA covenant, tested at quarter end on trailing twelve-month EBITDA, is tighter. After the acquisition, total debt rises to about $249 million, while EBITDA, including the acquired hospital's pro forma $1.9 million and the qualifying add-backs from Module Four, is about $46.2 million. The ratio is 5.4 against a limit of 5.5. In dollar terms, EBITDA could fall about $0.9 million before a breach, a thin cushion for a business whose quarterly EBITDA can vary by more than that.
Recommended Actions
Three actions would widen the margin, and none of them changes the operating plan. Delaying the MRI purchase to week 15, after the quarter-end test, keeps $2.2 million of cash and avoids one revolver draw, reducing quarter-end debt to about $247 million and the ratio to about 5.35. Asking the sponsor to fund part of the acquisition with equity, $4 million, would reduce debt further, bringing the ratio below 5.3. And the controller should ask the lenders now, not at quarter end, whether they would consent to treating the MRI as a growth investment excluded from the test, as some agreements allow. Kim et al. (1998) found that firms with costlier external financing hold more cash, which supports keeping a larger buffer in a company this close to its limits. Graham et al. (2005) report that executives often sacrifice economic value to meet earnings benchmarks; a controller presenting these options should make clear that delaying the MRI is a timing choice, not a cost saving.
Reconciling to the Budget
The budget's rolling forecast, built on an accrual basis, shows fourth-quarter EBITDA of about $12.4 million, which might suggest ample cash. The direct forecast explains the gap: about $5.6 million of debt service, $3.0 million of taxes, $2.2 million of capital spending and $14 million for the acquisition are not in EBITDA, and the timing of payroll and rent concentrates outflows in particular weeks. Reconciling the two each month, starting from EBITDA and adjusting for these items and working capital, shows the sponsor that the cash forecast is consistent with the operating plan rather than a separate guess.
A Weaker Quarter
If weekly receipts ran 5 percent below forecast, about $0.22 million less each week, cash would be about $2.8 million lower by week 13. The company would need a third revolver draw of about $3 million, leaving revolver availability near $9 million and liquidity of about $13 million, still above the $10 million covenant. EBITDA would also fall by about $2 million for the quarter, which would push the debt ratio above 5.5 unless the MRI were delayed and the sponsor contributed equity. That result is why the recommendations should be approved before the quarter begins, not after a weak October.
Updating and Accuracy
The forecast will be rolled forward every Monday, with actual receipts and payments replacing forecasts and a new week added. The controller will track forecast accuracy, actual versus forecast cash each week, by line, and investigate any variance above $500,000. Accuracy builds the sponsor's confidence in the forecast, which matters if the company needs a covenant waiver. Receipts are usually the least accurate line, so the treasury analyst will compare each week's card settlements with the practice systems' daily totals to catch processing delays early.
Conclusion
The group can absorb the quarter's payments with two $2 million revolver draws and will meet its liquidity covenant easily, but its debt-to-EBITDA ratio will be close to the limit. Delaying the MRI and adding sponsor equity to the acquisition would give a safer margin.
References
Graham, J. R., Harvey, C. R., & Rajgopal, S. (2005). The economic implications of corporate financial reporting. Journal of Accounting and Economics, 40(1-3), 3-73. https://doi.org/10.1016/j.jacceco.2005.01.002
Kim, C.-S., Mauer, D. C., & Sherman, A. E. (1998). The determinants of corporate liquidity: Theory and evidence. Journal of Financial and Quantitative Analysis, 33(3), 335-359. https://doi.org/10.2307/2331099
Roehl-Anderson, J. M. (2013). Controllership: The work of the managerial accountant (9th ed.). Wiley.
What the ACC 660 Module 5 instructions ask for
The Module Five assignment in ACC 660 usually asks you to forecast cash, often with a 13-week direct method, and to evaluate liquidity and covenant compliance. Plan to forecast receipts and disbursements by week from operating patterns, include nonoperating items such as debt service, taxes, capital spending and acquisitions, identify the low points, plan borrowing or other actions to keep a minimum balance, and test the forecast against covenants. Many versions also ask how the forecast differs from the indirect, accrual-based forecast in the budget and how it will be updated. Explain each assumption's source, since a cash forecast is only as reliable as its timing assumptions, and test at least one downside case.
How this ACC 660 Module 5 cash management assignment example is built
The paper forecasts weekly card receipts of $4.37 million, biweekly payroll of $3.37 million, weekly supplier and operating payments of $1.47 million and monthly rent of $1.23 million, plus a $3.0 million tax payment, $1.8 million of doctor bonuses, a $2.2 million MRI, a $14 million acquisition funded partly by a $10 million delayed-draw loan and $5.6 million of interest and principal in week 13. Cash falls to $0.76 million in week 9 and near zero in week 13, so the plan draws $2 million on the revolver in each of those weeks. Liquidity stays above $10 million, but debt to EBITDA reaches 5.4 against a 5.5 limit, and the paper recommends delaying the MRI and asking the sponsor for equity, then tests a weaker-revenue case.
Where the ACC 660 Module 5 rubric puts the points
Rubrics for the cash management assignment typically score the forecast's structure and assumptions, identification of low points, the financing plan, covenant testing, recommended actions and presentation. Top papers base receipt and payment timing on actual patterns, separate operating from financing and investing flows, calculate covenant headroom in dollars as well as ratios and recommend specific actions with their effect on the low point. Graders also reward a plan for updating the forecast weekly and tracking accuracy, along with a downside scenario. Common deductions include monthly rather than weekly timing, ignoring debt service or taxes, treating revolver availability as cash and recommendations without quantified effects.
ACC 660 Module 5 help: the mistakes that cost points
Cash forecast papers most often slip on timing: an accrual budget can show a profitable quarter while cash runs out in a single week because payroll, rent and interest land together. A second weak spot is covenants, where students compute the ratio but not the headroom, the amount by which EBITDA could fall before a breach. If your case is a seasonal business, the 13-week forecast should start before the peak cash need. Build the forecast week by week in a table and mark the lowest week first; every recommendation should be judged by how much it raises that low point. Then run a weaker-revenue case to see whether the plan still holds.
Get ACC 660 Module 5 written to your instructions
Send the ACC 660 Module 5 assignment and the cash data. The paper will build the weekly forecast, identify low points, plan financing, test covenants and recommend actions with their effects. Turnaround is about two days, and your first one is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More ACC 660 papers and related MS Accounting samples
- ACC 660 Module 1 Discussion: The Controller Under a Private Equity Owner
- ACC 660 Module 2 Close Process Assignment: From a 12-Day Close to Five
- ACC 660 Module 3 Milestone One: A Driver-Based Budget for 14 Hospitals
- ACC 660 Module 4 Discussion: Which EBITDA Add-Backs Should a Controller Sign?
- ACC 660 Module 6 Milestone Two: A KPI Dashboard for Hospital Leaders
- ACC 620 Module 2 Lease Accounting Assignment: A Terminal Lease and a Tractor Lease Side by Side
- ACC 550 Module 8 Discussion: A Balanced Scorecard for the Candy Division
- ACC 646 Module 10 Final Project: A Fraud Prevention Program for the Company
- ACC 645 Module 6 Milestone Two: A Whistleblower and Backdated Contracts
ACC 660 Module 5 questions, answered
Where can I find a free ACC 660 Module 5 Cash Management sample?
This page includes a full ACC 660 Module 5 assignment with a 13-week cash forecast and covenant headroom analysis.
What is a 13-week cash flow forecast?
A weekly forecast of cash receipts and disbursements for about one quarter, built by the direct method, used to manage liquidity and anticipate borrowing needs.
Why forecast cash weekly rather than monthly?
Because large payments such as payroll, rent, taxes and interest fall in specific weeks, and a monthly view can hide a week when cash runs short.
What is covenant headroom?
The margin between a company's actual position and the covenant limit, often expressed as how much EBITDA could fall, or debt rise, before a breach.
How can a company widen a thin liquidity margin?
By delaying discretionary capital spending, changing the timing of acquisitions, managing payables within terms, accelerating collections or arranging additional credit before it is needed.