| Course | BUS 496 Adv. Experiential Learning for Business |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate reflective journal entry on an applied client project |
| Length | About 390 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for BUS 496 Module 3
Week Four Journal
Four Hours Versus Two Days
On Tuesday I finished matching the website's quote requests to bookings in the dispatch software. It took longer than planned because the two systems share no customer number, so I matched on email address and trip date. With 1,940 requests cleaned, I calculated how long the company took to respond to each one. The pattern was striking. Requests answered within four hours booked 27 percent of the time; requests answered between one and two days later booked 13 percent; requests answered after two days booked 7 percent. The median response time was thirty-one hours.
I was excited. At Thursday's meeting I put the chart on the screen before the owner had even sat down and said that the company was losing customers because quotes were too slow. The office manager, who answers the quotes along with dispatch and billing, paused, then said, "I'm doing three jobs." The owner looked at her, and the meeting moved on, but the room felt different.
My first reaction was embarrassment, and my second was defensiveness: the numbers are the numbers. But reflecting on it tonight, I think the problem was how I delivered the finding, not the finding itself. Kluger and DeNisi (1996) found in a large review that feedback often makes performance worse when it shifts the listener's focus from the job onto themselves. I described a fact about the process, slow quotes, but in a room where one person owns that process, it landed as a statement about her.
Reflection-in-action means noticing, while it happens, that something is going off course and adjusting (Schön, 1983). I noticed the shift in the room and did nothing. Kolb (1984) would call this the concrete experience that starts a learning cycle, and the lesson I draw is general: when a finding describes someone's work, that person should hear it first, framed as a fact about the process and with a chance to explain.
This connects directly to my first learning goal, leading the meeting without a script. I followed my plan too rigidly and missed what was happening.
Before next Thursday, I will meet the office manager alone for fifteen minutes, show her the chart and ask how she sees it. I suspect she will explain why quotes wait, which is what the project needs to know anyway.
References
Kluger, A. N., & DeNisi, A. (1996). The effects of feedback interventions on performance: A historical review, a meta-analysis, and a preliminary feedback intervention theory. Psychological Bulletin, 119(2), 254-284. https://doi.org/10.1037/0033-2909.119.2.254
Kolb, D. A. (1984). Experiential learning: Experience as the source of learning and development. Prentice-Hall.
Schön, D. A. (1983). The reflective practitioner: How professionals think in action. Basic Books.
What the BUS 496 Module 3 instructions ask for
The BUS 496 reflective journal asks you to write regularly about your applied project, usually in response to prompts about what happened, what you learned and how it connects to your goals. A strong entry focuses on one specific moment rather than listing tasks, describes your own thinking and feelings as well as events, draws a lesson that goes beyond the moment and states what you will do differently. Journals are graded for depth and honesty more than polish. Connecting the moment to a concept from the course or research shows that the reflection is more than a diary. Many instructors also ask you to link each entry to the learning goals you set at the start of the course.
How this BUS 496 Module 3 reflective journal example is built
The entry describes the week the student finished cleaning eleven months of quote data and found that requests answered within four hours booked at 27 percent, while those answered after two days booked at 7 percent. Excited, the student shared the finding at the weekly meeting, and the office manager, who answers the quotes alongside dispatch and billing, said quietly that she was doing three jobs. The entry examines the student's embarrassment, uses research on reflective practice and on how feedback can lower performance when it targets the person rather than the task, and sets a change: present findings as facts about the process, and ask the office manager how she sees them before the owner joins.
Where the BUS 496 Module 3 rubric puts the points
Journal entries in this course are usually assessed on focus on a specific experience, depth of reflection, honesty, connection to concepts or research, connection to learning goals and a clear next step. Strong entries move from what happened to why it mattered and what will change, show the writer's own role in events and avoid blaming others. Entries that list the week's tasks, or describe events without the writer's thinking, earn less. Instructors also value entries that admit a misstep. Entries that end with a specific action for the coming week usually score higher than those that end with a general resolution. A brief, accurate reference to a reading shows that reflection is connected to the course.
BUS 496 Module 3 help: the mistakes that cost points
Journal entries often read like status reports. Pick one moment that made you uncomfortable, surprised or proud, and stay with it. Describe what you thought and felt, not just what happened, and ask what you contributed to the outcome. Then connect it to an idea from the course or research and say what you will do differently. A good entry is short and specific; a full page about one meeting is better than a paragraph about each day of the week. Write the entry soon after the moment, while details and feelings are fresh.
Get BUS 496 Module 3 written to your instructions
Send the BUS 496 journal prompt and what happened in your week. The entry will focus on one moment, examine your reaction honestly, connect it to research and set a concrete change. About two days; a first entry is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More BUS 496 papers and related BS Business Administration samples
- BUS 496 Module 1 Discussion: Setting Learning Goals for a Client Project
- BUS 496 Module 2 Project Proposal Assignment: Scope, Deliverables and a Timeline Agreed With the Client
- BUS 496 Module 4 Status Report Assignment: A Midpoint Memo to the Client
- BUS 496 Module 5 Data Analysis Assignment: What Eleven Months of Quote Requests Show
- BUS 496 Module 6 Discussion: When the Client Asks for More
- BUS 496 Module 7 Final Client Report: Recommendations to Win More Quotes
- BUS 496 Module 8 Final Reflection: What a Semester of Client Work Taught
- MKT 311 Module 2 Mobile Audit Assignment: Auditing a Bike Share's Mobile Experience
- FIN 485 Module 4 Retirement and Investment Assignment: From 6 Percent to the Full Match and Beyond
- QSO 425 Module 1 Discussion: What Reverse Logistics Means for a Tool Maker
- ACC 318 Module 7 Project Two: An Estimate Change and a Restatement
BUS 496 Module 3 questions, answered
Where can I find a free BUS 496 Module 3 Reflective Journal sample?
This page includes a full BUS 496 week-four journal entry from a project with a charter bus company.
What should a reflective journal entry include?
One specific experience, your thoughts and reactions, what you learned from it, a connection to a concept or reading and what you will do differently.
How is a reflective journal different from a progress report?
A progress report describes what was done; a reflective journal examines what the experience meant and what the writer learned from it.
Why reflect on uncomfortable moments?
Because they often reveal assumptions or habits worth changing, and examining them turns a difficult experience into learning.
How should findings be shared with the people they describe?
As facts about a process rather than judgments about a person, ideally with that person first and with a chance for them to explain.