| Course | CSR 610 Business Ethics and Culture |
|---|---|
| Module | Module 3 |
| Paper type | graduate milestone assessing an organization's ethical culture |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Management |
| Updated | October 2026 |
Free sample paper for CSR 610 Module 3
Ethical Culture Assessment
[Student Name]
Southern New Hampshire University
CSR 610: Business Ethics and Culture
Milestone One
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Ethical Culture Assessment
Introduction
The March inspection findings, records completed after the fact and failed tests retested until they passed, were not the work of a few dishonest employees. They were produced by a culture. This milestone assesses that culture as the basis for the final project's recommendations. It describes how the evidence was gathered, presents findings on speaking up, rewards, structure, systems and leadership, interprets them using research on ethical culture and identifies strengths to build on.
Method
Three sources were used. An anonymous survey, adapted from published measures of ethical culture, was sent to all 640 employees and answered by 412, a 64 percent response rate, with responses from both shifts and all departments. Eighteen interviews, each about forty minutes, were held with production operators, shift supervisors, quality technicians, lab analysts, two managers and the chief operating officer. And company documents were reviewed: the code of conduct, the handbook, incentive plans, the organization chart, training records and the hotline log. Using several sources guards against relying on what people say they value rather than what the organization rewards. The survey was anonymous and administered by an outside firm so that employees would answer candidly.
Findings: Speaking Up
Thirty-eight percent of respondents agreed that they would fear retaliation if they raised a concern about quality or safety. The figure was higher among operators and lab staff, at 46 percent, than among managers, at 12 percent. In interviews, three lab analysts described being asked to retest failed samples and feeling unable to refuse. The hotline, run by an outside vendor, received two calls in the past year, both about scheduling. A hotline that is never used is not evidence of a healthy culture; it is more often evidence that people do not trust it.
Findings: Rewards and Structure
Shift supervisors' quarterly bonuses depend entirely on units shipped against target. No measure of quality, record accuracy or safety enters the calculation. Sixty-one percent of respondents agreed that their supervisors care more about output than how it is achieved. The quality unit reports to the plant manager, who is accountable for output, so the people responsible for stopping a bad batch report to the person most harmed by stopping it. Weaver et al. (1999) found that ethics programs often operate as loosely attached add-ons when they are not integrated with how the organization actually controls and rewards behavior, which describes this company well.
Findings: Formal Systems
The code of conduct is thorough and was updated in 2023. Ethics training consists of a forty-minute video at orientation, with no refresher. The handbook describes a commitment to integrity, but no employee interviewed could recall an occasion when integrity was discussed at a team meeting. Training records show that 71 percent of supervisors had not completed the company's records training in the past two years.
Findings: Leadership
At quarterly town halls, executives celebrate production records and on-time shipping, often naming top-performing shifts. In the past year's six town halls, quality was mentioned in one, and only in connection with a customer complaint. Employees described the plant manager as fair and hardworking but focused on numbers. The chief operating officer told the interviewer that he had never seen the lab's retest rate.
Interpretation
Treviño and colleagues distinguish the formal elements of ethical culture, such as codes, training and reward systems, from informal elements, such as norms, role models and the stories people tell, and found that the informal elements and the perceived focus on obedience versus self-interest strongly shape behavior (Treviño et al., 1998). In this company the formal elements are present but weak, and the informal elements point the wrong way: the stories people tell are about shifts that hit records, not about anyone who stopped a line. Schein (2010) describes culture in layers, from visible artifacts through espoused values to underlying assumptions. The espoused value is integrity; the underlying assumption, revealed by pay, structure and leaders' attention, is that output comes first.
Comparing Groups
The survey results differed sharply by role and shift. Managers rated the culture far more favorably than operators and lab staff on every question, a common pattern in which those who design systems see them as working better than those who live under them. Second-shift respondents were more likely than first-shift respondents to report pressure to cut corners, which matches the interviews: the second shift runs the higher-volume gummy lines and has the newest supervisors. Long-serving employees, those with more than ten years, were more likely to describe the culture as having changed for the worse since the growth began, recalling a time when the founder walked the floor and asked about quality. These differences suggest that change efforts should start where the pressure is greatest, on the second shift and in the lab, and that the gap between managers' and workers' views is itself a finding to share with leadership.
Strengths
The assessment also found strengths. The quality and lab staff, despite pressure, clearly care about getting results right, and several raised concerns informally. Operators expressed pride in making products people take for their health. Supervisors are loyal and respected by their teams, which means that if their incentives change, their teams will follow them. And the executives were open to the assessment, which suggests a willingness to act.
Implications
Four issues stand out for the analysis and recommendations to come: fear of raising concerns, especially among lab staff; incentives that reward output alone; a reporting line that places quality under production; and leaders who signal that speed matters most. Milestone Two will consider the company's responsibilities to its stakeholders, and Milestone Three will propose how to change the culture.
Conclusion
The company's formal ethics program exists on paper but is overwhelmed by a reward system, structure and leadership attention that put output first. The inspection findings were a predictable result, not an accident, and similar findings will recur unless the system changes. The company's strengths, staff who care about quality and a leadership open to change, give it a basis for improvement.
References
Schein, E. H. (2010). Organizational culture and leadership (4th ed.). Jossey-Bass.
Treviño, L. K., Butterfield, K. D., & McCabe, D. L. (1998). The ethical context in organizations: Influences on employee attitudes and behaviors. Business Ethics Quarterly, 8(3), 447-476. https://doi.org/10.2307/3857431
Weaver, G. R., Treviño, L. K., & Cochran, P. L. (1999). Corporate ethics programs as control systems: Influences of executive commitment and environmental factors. Academy of Management Journal, 42(1), 41-57. https://doi.org/10.2307/256873
What the CSR 610 Module 3 instructions ask for
Milestone One in CSR 610 typically asks you to assess the ethical culture of an organization, real or assigned, as the starting point for your final project. Guidelines usually ask you to describe the organization, examine formal elements such as codes, policies, training and reward systems and informal elements such as norms, leadership behavior and stories, and identify strengths and weaknesses. Strong submissions gather evidence from several sources, look for gaps between what the organization says and what it rewards, and use research on ethical culture to interpret the findings. They end with clear implications for the analysis and recommendations to come.
How this CSR 610 Module 3 milestone one example is built
The paper reports a survey of 412 employees, a 64 percent response rate, and eighteen interviews across shifts and departments. Thirty-eight percent said they would fear retaliation for raising a concern, and 61 percent agreed that supervisors care more about output than how it is achieved. Shift supervisors' bonuses depend entirely on units shipped, the quality unit reports to the plant manager who is accountable for output, the hotline received two calls in a year and executives praise speed in town halls while integrity appears only in the handbook. Using research that distinguishes formal and informal elements of ethical culture, it identifies strengths in the quality staff's integrity and workers' pride in their products.
Where the CSR 610 Module 3 rubric puts the points
For this first milestone, marks usually follow how well you portray the organization, analysis of formal and informal culture, use of evidence, application of culture research, identification of strengths and weaknesses, implications and writing. The strongest papers use more than one source of evidence, compare stated values with actual rewards and behavior, explain findings through research and avoid blaming individuals for patterns the system creates. Papers lose credit for relying on the code of conduct as evidence of culture, for findings without data, for ignoring incentives and structure and for assessments that list only weaknesses. Breaking results down by role or shift, where the data allow, often reveals the most useful findings. Instructors also reward honesty about the limits of a survey or interview sample.
CSR 610 Module 3 help: the mistakes that cost points
Culture assessments often describe the code of conduct and conclude the culture is ethical, or describe one scandal and conclude it is not. Look for evidence of what people actually do and what the organization rewards: surveys, interviews, pay plans, reporting lines and the stories people tell. Compare these with the stated values. Use research to explain why gaps matter. Include strengths, because change plans work by building on what is already good. Finish with the issues your final project must address. If managers and workers see the culture differently, report that gap as a finding in its own right. Keep respondents anonymous in anything you submit.
Get CSR 610 Module 3 written to your instructions
Send the CSR 610 Milestone One guidelines and your organization. The assessment will gather evidence from people, incentives and structure, interpret it through culture research and name strengths and gaps. About two days; a first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More CSR 610 papers and related MS Management samples
- CSR 610 Module 1 Discussion: Why Ethics Became a Business Problem in Ogden
- CSR 610 Module 2 Ethical Theories Assignment: A Borderline Batch Through Four Lenses
- BMB 670 Module 2 Leadership Approaches Assignment: Three Ways to Lead the Same Company
- BMB 515 Module 10 Final Project: A Strategic Plan for the Label
- ACC 645 Module 5 Benefit Plan Audit Assignment: Auditing the Company's 401(k) Plan
- ACC 620 Module 4 Discussion: Who Picks the Pension Discount Rate?
CSR 610 Module 3 questions, answered
Where can I find a free CSR 610 Module 3 Milestone One sample?
This page includes the complete CSR 610 Milestone One ethical culture assessment of a supplement manufacturer.
What is ethical culture?
The formal and informal systems in an organization, such as policies, rewards, leadership behavior and norms, that encourage ethical or unethical conduct.
How do you assess an organization's ethical culture?
By gathering evidence from surveys, interviews, policies, incentive plans, reporting structures and leadership behavior, and comparing what the organization says with what it rewards.
What is the difference between ethical culture and ethical climate?
Ethical climate refers to shared perceptions of what ethical behavior is expected, while ethical culture includes the formal and informal systems that shape behavior.
Why look at incentives when assessing ethics?
Because what people are paid and promoted for sends a stronger signal than written values, and incentives tied only to output can encourage shortcuts.