FIN 550 Module 5 Capital Budgeting Assignment Example

Reviewed by Portia Lambrick, MBA

This FIN 550 Module 5 Capital Budgeting Assignment sample estimates the incremental cash flows of a major investment and evaluates it with net present value and related measures. SNHU FIN 550 (FIN-550) assigns this capital budgeting analysis in Module Five of its MBA course in corporate financial management. For the composite Conestoga Snack Company, the paper builds ten years of cash flows for a new extruded snack line, including bonus depreciation, working capital and a terminal value, discounts them at the 10 percent rate set for the project, and reports NPV, IRR, payback and the profitability index. It explains what was left out and why.

CourseFIN 550 Corporate Financial Management
ModuleModule 5
Paper typegraduate assignment evaluating a capital project with discounted cash flow
LengthAbout 1,120 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA
UpdatedOctober 2026

Free sample paper for FIN 550 Module 5

1

Capital Budgeting Analysis of the Extruded Snack Line

[Student Name]

Southern New Hampshire University

FIN 550: Corporate Financial Management

Module Five Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingConestoga and its project figures are invented for teaching; tax treatment assumes 2026 federal rules and is simplified.
2

Capital Budgeting Analysis of the Extruded Snack Line

Introduction

Conestoga's operations team proposes a new line to make extruded corn and lentil snacks, a category the company does not now sell, in a building addition at its Lititz plant. The board's question is whether the line will earn more than the 10 percent return set for it in the Module Four discussion, which reflects the risk of a new category. This assignment estimates the incremental cash flows, the money that changes because the line is built, and evaluates them.

What this page is doingThe proposal and the question.
3

What Counts and What Does Not

The analysis counts a dollar only if building the line would add it or take it away. The $600,000 feasibility study paid last year is sunk; it will not be recovered whether the line is built or not, so it is excluded. Interest on any loan used to pay for the line is excluded as well, because the 10 percent hurdle is itself the charge for using investors' money; subtracting interest and then discounting would charge for financing twice. The marketing team expects the new snacks to take about $2 million a year of sales from Conestoga's own pretzels, and the sales projections below are net of that loss. The building addition uses vacant land the company owns with no other planned use, so no opportunity cost is charged for the land, though a sale of the parcel would have changed that.

What this page is doingRelevant and irrelevant cash flows.
4

The Initial Investment

Equipment costs about $34 million and the building addition about $8 million. Under the 2025 change in federal tax law, qualifying equipment placed in service in 2026 can be written off entirely in its first year of use, so Conestoga can deduct the $34 million against its 2026 income. At a combined 26 percent tax rate, that saves about $8.8 million of tax in year zero. Nonresidential buildings are not eligible and are depreciated over 39 years. The net outlay in year zero is therefore about $33.2 million. Zwick and Mahon (2017) found that accelerated depreciation strongly increases investment by smaller firms, which tend to be short of cash and value an early tax saving highly, and House and Shapiro (2008) found that investment in the types of equipment that benefit most from bonus depreciation responded sharply when the incentive was available. Conestoga's line is a case in point: the tax rule lowers its effective cost by about a fifth.

What this page is doingYear zero.
5

Operating Cash Flows

Sales start at $40 million in the first year, while customers try the product, rise to $60 million in the second and reach $70 million in the third, then grow 2 percent a year. EBITDA margins start at 10 percent in the first year, reflecting startup waste and introductory pricing, reach 15 percent in the second and settle at 17 percent thereafter, slightly above the company's existing margin because the new line runs with fewer workers per pound of product. Maintenance spending of $1 million a year begins in year three. Working capital equals 12.5 percent of sales, so the company invests about $5 million in the first year as inventory and receivables build, and smaller amounts after that.

Incremental cash flows of the extruded snack line (millions of dollars)

YearSalesEBITDATaxesWorking capital investedCash flow
0Saving of 8.8(33.2)
140.04.01.05.0(2.0)
260.09.02.32.54.2
370.011.93.01.26.6
471.412.13.10.27.9
572.812.43.20.28.0
674.312.63.20.28.2
775.812.93.30.28.4
877.313.13.40.28.6
978.813.43.40.28.8
1080.413.73.50.227.9

Taxes in each year are computed on EBITDA less the small building depreciation, since the equipment was already fully deducted. The year-ten cash flow includes the recovery of about $10 million of working capital, equipment sold for an estimated $4 million, about $3 million after tax, and the building addition's remaining book value of about $5.9 million, assumed to be its value to the company at that point.

What this page is doingYears one through ten.
6

The Results

At the 10 percent hurdle, the line's net present value comes to about $11.3 million: it should pay back every dollar put into it, earn 10 percent a year on those dollars along the way and leave roughly $11 million of extra value in today's money.

Solved for the rate that sets its NPV to zero, the line yields about 15.0 percent, five points above the hurdle. The modified internal rate of return, which assumes cash is reinvested at 10 percent rather than at the project's own rate, is about 13.1 percent, a more conservative figure. The profitability index, the present value of the cash flows from year two onward divided by the present value of the net investment in years zero and one, is about 1.32: each dollar invested returns about $1.32 in present value.

The simple payback period is about six years, and the discounted payback is close to nine. The long payback reflects the slow ramp and the fact that a large share of value arrives in year ten, when working capital and salvage return.

What this page is doingWhat the measures say.
7

Interpreting the Measures

In the survey by Graham and Harvey (2001), NPV and IRR were the two methods finance chiefs most often said they always or almost always used, and payback came a close third, above all at smaller companies. All three are useful here, but NPV governs. IRR describes a rate, not an amount of value, and can mislead when comparing projects of different size. Payback ignores everything after the cutoff and the time value of money; at nine years, the discounted payback looks worrying, but most of the line's value lies in years it ignores. The measures agree on the direction: the project clears its hurdle.

What this page is doingWhy NPV leads.
8

Limits of the Base Case

These results rest on a single estimate of each assumption. The sales ramp, the margin and the discount rate are all uncertain, and the line's value is concentrated in later years, when forecasts are least reliable. The tax saving from full expensing also assumes Conestoga has enough taxable income in 2026 to use the deduction, which its forecast suggests it nearly does. Milestone Two will test the project against pessimistic and optimistic scenarios, measure how far sales could fall before the NPV turns negative and confirm the discount rate.

What this page is doingWhat this analysis does not yet test.
9

Conclusion

On the base-case estimates, the extruded snack line creates about $11.3 million of value when its cash flows are discounted at the 10 percent hurdle, and its IRR is close to 15 percent. Full expensing of the equipment contributes about $1.8 million of that value compared with ordinary depreciation. The project passes on every measure, but its slow payback and dependence on later years make the risk analysis that follows essential.

What this page is doingThe base-case verdict.
10

References

Graham, J. R., & Harvey, C. R. (2001). The theory and practice of corporate finance: Evidence from the field. Journal of Financial Economics, 60(2-3), 187-243. https://doi.org/10.1016/S0304-405X(01)00044-7

House, C. L., & Shapiro, M. D. (2008). Temporary investment tax incentives: Theory with evidence from bonus depreciation. American Economic Review, 98(3), 737-768. https://doi.org/10.1257/aer.98.3.737

Zwick, E., & Mahon, J. (2017). Tax policy and heterogeneous investment behavior. American Economic Review, 107(1), 217-248. https://doi.org/10.1257/aer.20140855

What the FIN 550 Module 5 instructions ask for

The Module Five assignment in FIN 550 commonly asks you to evaluate a proposed investment using capital budgeting techniques. Expect to estimate the project's incremental cash flows, from the initial outlay through after-tax operating flows, working capital and terminal amounts, and then to compute NPV, IRR, payback and often the profitability index. Many versions ask you to explain which costs are relevant, such as opportunity costs and side effects on existing products, and which are not, such as sunk costs and interest. A strong submission lays out the cash flows year by year, states every assumption, explains why NPV is the primary criterion and interprets the results for the decision maker.

How this FIN 550 Module 5 capital budgeting assignment example is built

The sample starts with the outlay: $34 million of equipment and $8 million of building work. Because 2025 law allows full expensing of qualifying equipment, Conestoga deducts the $34 million at once, saving about $8.8 million of tax and reducing the net outlay to about $33.2 million. Sales ramp from $40 million to $70 million by year three and then grow 2 percent a year, with margins rising from 10 to 17 percent. Working capital equal to 12.5 percent of sales is invested and recovered in year ten, along with salvage values. At 10 percent, NPV is about $11.3 million, IRR about 15 percent, simple payback about six years and discounted payback near nine. The paper excludes a $600,000 feasibility study as sunk and nets out pretzel sales the new line would take.

Where the FIN 550 Module 5 rubric puts the points

Capital budgeting assignments are generally graded on the correct identification of incremental cash flows, the accurate treatment of taxes, depreciation and working capital, the calculation of NPV, IRR and other measures, the choice of an appropriate discount rate and the interpretation of results. High scores go to papers that exclude sunk costs and financing costs, include working capital investment and recovery, account for side effects on existing products and explain why NPV governs when methods disagree. Papers lose points for discounting accounting profit instead of cash flow, for subtracting interest in the cash flows and then discounting at the WACC, for forgetting terminal values and for relying on payback alone.

FIN 550 Module 5 help: the mistakes that cost points

The biggest source of error in project analysis is mixing financing into the operating cash flows. Leave out interest and principal: the discount rate already charges for the cost of capital, so subtracting interest counts it twice. Next, treat working capital as an investment that goes out early and comes back at the end. Include taxes as cash, with depreciation entering only through the tax it saves, and check the current depreciation rules, since full expensing can move a large tax saving to year zero. List what you excluded and why, such as a study already paid for. Finally, report NPV first and use IRR, payback and the profitability index as context, explaining any disagreement among them.

Get FIN 550 Module 5 written to your instructions

Send the FIN 550 Module 5 directions and the project data in your case. We separate incremental from irrelevant cash flows, handle depreciation, taxes and working capital correctly and report NPV, IRR and payback with a plain explanation of what each says. Around two days; your first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 550 papers and related MBA samples

FIN 550 Module 5 questions, answered

Where can I find a free FIN 550 Module 5 Capital Budgeting sample?

This page has the full FIN 550 Module 5 paper, building ten years of cash flows for a snack line and reporting NPV, IRR, payback and the profitability index.

What cash flows belong in a capital budgeting analysis?

Incremental after-tax cash flows: the initial investment, operating cash flows, changes in working capital, opportunity costs, side effects on existing products and terminal values, but not sunk costs or interest.

Why is NPV preferred to IRR?

NPV measures the dollars of value a project adds at the firm's cost of capital, while IRR can mislead when projects differ in size or timing or when cash flows change sign more than once.

How does bonus depreciation affect a capital project?

Deducting the full cost of qualifying equipment in the first year moves the tax savings forward, which raises the project's net present value even though total deductions over its life are the same.

What is the profitability index?

What the discounted inflows are worth for each dollar of up-front spending; anything above one signals that the project adds value.