HIM 680 Advanced Topics in HIM I sample papers, module by module

Reviewed by Delia Ravenscroft, MSN, RN

HIM 680 asks graduate health information students to manage data as an enterprise asset: classified with the right systems, governed by named owners, kept fit for use and delivered to the people who need it. The samples below follow one composite director of data governance at a four-hospital system around Cedar Rapids, Iowa, where clinics screen thousands of patients a month for housing, food and transportation needs, yet barely 2% of inpatient claims carry a social risk code and the warehouse holds none of the screening answers, with research on Z codes, data quality and social data behind each step.

HIM 680 is SNHU’s Advanced Topics in HIM I course. It centers on advanced topics for health information leaders: ICD-10-CM, SNOMED CT and LOINC and how they differ, social determinants Z codes, data governance structures, data stewardship, data standards and dictionaries, data quality frameworks, lineage from source to warehouse, master and reference data, interoperability through FHIR and USCDI, analytics and the ethics of collecting social risk data. Every module below opens a full sample paper or takes a free request for one; searches like "him 680 module 3", "HIM680 sample paper" and "HIM 680 milestone example" land on this page.

What HIM 680 is really about

HIM 680 is an advanced-topics course in SNHU's MS Health Information Management that pulls classification, governance, data management and informatics into one picture. Its rubrics reward students who can trace a single data element from the moment it is captured to the report that uses it, name who owns it at each step, define it so everyone means the same thing and measure whether it is fit for the use intended.

Every sample here follows a composite director of data governance at Cedar Prairie Health, a system of four hospitals and 22 clinics in eastern Iowa. Clinics have used a ten-question social needs screener since 2024, but the answers sit in flowsheets the warehouse never loads, hospital coders rarely assign social risk codes and the population health team, a Medicaid health plan and the system's own equity committee all want the same data for different purposes. The director and system are illustrative.

What HIM 680’s modules ask for

Across ten modules, HIM 680 typically asks for discussions and a journal on classification, stewardship and the ethics of social data, short papers comparing terminologies and tracing data quality, a closing reflection and a final project built through three milestones, a governance assessment, a governance framework and a data management plan, which become a data governance program proposal.

Where students lose points in HIM 680

The most common HIM 680 deduction is governance described as a committee with no decisions to make: no named data elements, no owners, no definitions and no measures of quality. The second is treating classification systems as interchangeable, for instance proposing ICD-10-CM codes for a purpose SNOMED CT or LOINC serves better. Graders also mark down data quality claims with no framework or metric, lineage that skips the transformation steps where data are lost and informatics plans that never say who will use the output. The fix is to follow one data element end to end.

The HIM 680 drawers

Module 1

HIM 680 Module 1 Discussion example

An opening discussion in which the composite Iowa data governance director compares two facts, thousands of patients a month telling clinic staff they lack food or stable housing and barely 2% of the system's inpatient claims carrying a social risk code, and argues that classification systems exist to make information countable for many users, not only to bill, drawing on Truong and colleagues on national Z code use, Gottlieb and colleagues on pulling social data out of records and Benson and Grieve on terminologies. Full sample paper, read it free.

Read the sample →
Module 2

HIM 680 Module 2 Terminology Short Paper example

A short paper that follows one patient's answer, that she has worried in the past year her food would run out, through three systems: LOINC for the screening question and answer, SNOMED CT for the clinician's finding and ICD-10-CM for the claim, showing what each captures and loses, how the federal core data set expects social needs to move between systems and which system should feed which use at a composite Iowa health system, drawing on Benson and Grieve, Gottlieb and colleagues, Truong and colleagues and federal USCDI guidance. Full sample paper, read it free.

Read the sample →
Module 3

HIM 680 Module 3 Final Project Milestone One example

The first milestone of the HIM 680 final project assesses how an Iowa health system currently governs social risk data: an inventory of six data elements from screener answers to Z codes and referrals, who captures, stores and uses each, three conflicting definitions of food insecurity, data quality checked against the conformance, completeness and plausibility framework, a maturity rating and five ranked gaps, drawing on Kahn and colleagues, the DAMA body of knowledge, Gottlieb and colleagues and Truong and colleagues. Full sample paper, read it free.

Read the sample →
Module 4

HIM 680 Module 4 Discussion example

A discussion in which the composite Iowa governance director asks who should own the food insecurity flag that three departments count three different ways, separates the roles of executive owner, business steward, technical custodian and users, proposes the population health director as owner and a clinic social work lead as steward, and explains why owning a definition is different from owning a database, drawing on the DAMA body of knowledge, Kahn and colleagues on fitness for use and Gottlieb and colleagues on social data. Full sample paper, read it free.

Read the sample →
Module 5

HIM 680 Module 5 Final Project Milestone Two example

Milestone Two designs the governance framework for an Iowa system's social risk data: a council with decision rights, an owner and three stewards, four policies, a standard definition of food insecurity built on a validated two-question screen, data dictionary entries for five elements, a standard terminology for each, quality measures with targets and an escalation path for disputes, drawing on the DAMA body of knowledge, Hager and colleagues on the two-item food screen, Kahn and colleagues on quality and federal interoperability guidance. Full sample paper, read it free.

Read the sample →
Module 6

HIM 680 Module 6 Data Quality Short Paper example

A short paper that traces the lineage of one patient's food screen answer at a composite Iowa system through eight hops, from the medical assistant's question to the population health dashboard, finds four places where data are lost or changed, a free-text option, local codes, a nightly extract that skips flowsheets and a dashboard filter, measures loss at each hop and proposes fixes in order, drawing on Kahn and colleagues, Weiskopf and Weng, the DAMA body of knowledge and Hager and colleagues. Full sample paper, read it free.

Read the sample →
Module 7

HIM 680 Module 7 Final Project Milestone Three example

Milestone Three plans how governed social risk data will reach the people who need them at an Iowa system: a warehouse model built around a screening fact table, a nightly load with reconciliation, a coder worklist that shows recent positive screens at admission, a monthly population health table, a standards-based quarterly file to the Medicaid plan, role-based access, four user stories and a six-month build sequence, drawing on the DAMA body of knowledge, federal USCDI guidance, Benson and Grieve on FHIR, Gottlieb and colleagues and Truong and colleagues. Full sample paper, read it free.

Read the sample →
Module 8

HIM 680 Module 8 Journal example

A journal entry in which the composite Iowa governance director sits in on clinic rooming and watches a mother answer no to the food questions while her child eats crackers from the waiting room bowl, then reflects on what it means to build systems around answers patients may not feel safe giving, weighing research on patient acceptability against warnings about the unintended consequences of screening, and resolves to measure trust as well as completeness, drawing on De Marchis and colleagues, Garg and colleagues and Hager and colleagues. Full sample paper, read it free.

Read the sample →
Module 9

HIM 680 Module 9 Final Project example

The HIM 680 final project combines the milestones into a data governance program proposal for social risk data at a composite Iowa system: the case from the assessment, a council with decision rights, owner and stewards, a standard food insecurity definition, a dictionary with terminologies, quality targets, a delivery plan from warehouse to coder worklist to health plan, privacy and trust safeguards, a twelve-month roadmap, a budget near $96,000 and the request to the executive sponsor, drawing on Truong and colleagues, Gottlieb and colleagues, Kahn and colleagues, Hager and colleagues, De Marchis and colleagues and the DAMA body of knowledge. Full sample paper, read it free.

Read the sample →
Module 10

HIM 680 Module 10 Reflection example

Closing HIM 680, the composite Iowa governance director admits to having thought governance meant meetings and describes three shifts: starting from one data element rather than an org chart, treating a missing number as a design flaw rather than a staff failure and reading a low rate as a possible sign of distrust, with Kahn and colleagues, Truong and colleagues and De Marchis and colleagues, and a commitment to present the first quarter's quality measures even if they look worse once the data are complete. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a HIM 680 sample the right way

Read an HIM 680 sample by checking whether each data element is defined, owned and traced from capture to use, whether the right classification system is chosen for each purpose and whether data quality is measured with a stated framework. For HIM 680, bring the prompt, your organization's data issue or the course case and the rubric; a first custom sample is returned free in 24-48h.

HIM 680 questions, answered

What does HIM 680 cover?

Advanced classification systems and terminologies, data governance and stewardship, data standards and dictionaries, data quality, data management, interoperability and informatics.

Is HIM 680 a coding course?

Partly. It treats classification systems as tools for data management and governance rather than only for billing.

What makes a strong HIM 680 paper?

One data element followed from capture to use, with a definition, an owner, the right terminology, a quality measure and a named user of the output.