| Course | HIM 685 Advanced Topics in HIM II |
|---|---|
| Module | Module 6 |
| Paper type | graduate short paper applying change management theory to an HIM transition |
| Length | About 1,060 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Health Information Management |
| Updated | October 2026 |
Free sample paper for HIM 685 Module 6
From Mailroom to Monitor: Choosing a Change Model for Longleaf's Release-of-Information Team
[Student Name]
Southern New Hampshire University
HIM 685: Advanced Topics in HIM II
Module Six Short Paper
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
From Mailroom to Monitor: Choosing a Change Model for Longleaf's Release-of-Information Team
Change models are often cited and rarely used. A paper may name Lewin or Kotter and then describe a plan that would have looked the same without them. A useful model should tell a leader what to do next and what to check before moving on. This paper tests three models against that standard for a specific change at the composite Longleaf hospital: moving the seven-person release-of-information team from mailing and faxing records to managing requests that increasingly arrive and are answered through the statewide exchange.
The Change
Requests arrive at a rate of roughly 2,300 a month. Most come from other providers, insurers and patients, and most are answered by printing, copying and mailing or faxing records. Once Longleaf's discharge summaries and lab results are available through the exchange, many provider requests will be answered automatically, and the team's work will shift toward checking unmatched patients, handling restricted records, answering requests the exchange cannot meet and auditing what was disclosed. No positions will be cut, but every job will change. Several team members have more than fifteen years in their roles, and rumors about layoffs began the week the board approved the exchange.
Lewin: Unfreeze, Change, Refreeze
Lewin (1947) described group behavior as held in a balance of forces and change as a process of loosening the existing balance, moving to a new one and stabilizing it. The model's strength is its insight that old habits are held in place by forces, some of which a leader can weaken, and that a new practice must be deliberately stabilized or it will slide back. For Longleaf, the forces holding the mail and fax process in place include familiarity, pride in careful work and fear about jobs. The model is less helpful about what to do on a given week; it describes stages more than steps.
Kotter: Eight Steps
Kotter (1995) drew on transformation efforts in many companies to argue that change fails when leaders skip steps, and he proposed a sequence: establish a sense of urgency, form a powerful guiding coalition, create a vision, communicate it, empower others to act by removing obstacles, plan for and create short-term wins, consolidate improvements and institutionalize new approaches. The model's strength is that it is a sequence of actions a leader can schedule. Its weaknesses are that it was written for large corporate transformations and that urgency, if pressed too hard, can feed the fears already present in a small team.
Weiner: Readiness
Weiner (2009) described organizational readiness as two things held in common across a group: wanting the change, which he called commitment, and believing the group can deliver it, which he called change efficacy. In his account, people are most ready when they think the change worth making and trust that they have the know-how, tools and time to pull it off. The theory does not prescribe steps, but it supplies two questions a leader can ask before each move: does the team want this, and does it believe it can do it? At Longleaf today, the honest answers are no and no.
Choosing and Combining
The paper chooses Kotter's sequence as the backbone of the plan, because it can be scheduled and assigned, and uses Weiner's two questions as a check before moving from one step to the next. Lewin's insight about forces informs the urgency and obstacle-removal steps. Urgency will be framed carefully: the case for change is that patients and clinicians across the state will soon expect Longleaf's records in minutes rather than days, not that the team's jobs are at risk. The guiding coalition will include two respected team members, not only managers. Before moving from communication to action, the director will ask the team, in a short anonymous survey, whether the change seems worthwhile and whether they feel able to learn the new tasks, and will not move on until most answer yes to both.
What Could Go Wrong
The chosen approach has its own risks. A guiding group that includes team members can be seen by others as a group of favorites, so membership will rotate after six months and every meeting summary will be shared with the whole team. Kotter's emphasis on short-term wins can tempt a leader to declare victory early; the first win will be reported as a beginning, not an end, and the old mail and fax process stays available until the exchange has carried its share for a full quarter. Readiness surveys can be gamed if people fear that honest answers will be held against them, which is why they will be anonymous and why the director will report the results back to the team in full, including the unflattering ones. Finally, the exchange's own performance is outside Longleaf's control. If the exchange is slow or unreliable during the first months, the team's belief in the change will fall, so the director will agree on service expectations with the exchange in advance and share its performance reports openly.
The First Ninety Days
Applied to the first ninety days, the approach produces specific actions. In weeks one and two, the director meets the team, states plainly that no positions will be cut, explains why the change matters to patients and invites two senior specialists to join the guiding group. In weeks three to six, the group maps every type of request the team handles and identifies which the exchange will absorb and which will remain, so each person can see their future work. In weeks seven to ten, two specialists learn match checking and query watching from the exchange's own staff, the obstacle of an unreliable document server is escalated to IT and the readiness survey is repeated. By week twelve, the team aims for a visible short-term win: the first month in which a measurable share of provider requests is answered through the exchange, celebrated with the team and reported to leadership.
Conclusion
Each model contributes something. Lewin explains why the old process persists, Kotter supplies the sequence of actions and Weiner offers a check on whether the team is ready for the next step. Combined, they produce a plan that is specific enough to schedule and humble enough to pause when the people involved are not ready. Milestone Two will extend this approach into the full change management and implementation plan.
References
Kotter, J. P. (1995). Leading change: Why transformation efforts fail. Harvard Business Review, 73(2), 59-67.
Lewin, K. (1947). Frontiers in group dynamics: Concept, method and reality in social science; social equilibria and social change. Human Relations, 1(1), 5-41. https://doi.org/10.1177/001872674700100103
Weiner, B. J. (2009). A theory of organizational readiness for change. Implementation Science, 4, Article 67. https://doi.org/10.1186/1748-5908-4-67
What the HIM 685 Module 6 instructions ask for
HIM 685's sixth module asks for a short paper applying change management theory, typically three to four pages in APA 7. Describe the change concretely, including who is affected and how they feel about it. Explain two or more models, for instance Lewin's three stages, Kotter's eight steps and a readiness or adoption theory, by what each tells a leader to do and what it leaves unclear. Judge them against a practical standard rather than simply summarizing them. Choose one or a combination and justify the choice for this situation. Then translate the chosen approach into specific actions with timing, for example the first ninety days, so a reader can see how theory changes what happens on the ground.
How this HIM 685 Module 6 change theory short paper example is built
Longleaf Regional Medical Center's seven-person release team handles 2,300 monthly requests, mostly by mail and fax, and has heard layoff rumors since the board vote. Lewin's forces explain why the old process persists but give little weekly direction. Kotter's eight steps give a sequence a leader can put on a calendar, with caution about urgency in a frightened team. Weiner's readiness theory supplies two questions, commitment and efficacy, both currently answered no. The HIM 685 paper chooses Kotter's sequence checked by Weiner's questions, frames urgency around patients rather than jobs, puts two senior specialists on the guiding group and lays out ninety days ending with a first month of requests answered through the exchange.
Where the HIM 685 Module 6 rubric puts the points
HIM 685 change theory papers are commonly graded on a concrete description of the change and the people affected, accurate explanation of each model, critical comparison against a practical standard, a justified choice suited to the situation and translation of theory into specific, timed actions. Papers that score highest show how the chosen model changes what a leader actually does, including when to pause, and adapt corporate models thoughtfully to small health care teams. Graders value attention to fear and identity in long-serving staff. Correct APA 7 citations for original theoretical sources, clear structure and precise vocabulary such as readiness, coalition and short-term wins complete the stronger work.
HIM 685 Module 6 help: the mistakes that cost points
HIM 685 theory papers give up marks for summarizing models from a textbook, choosing one without comparing it to alternatives, never applying it to concrete actions or treating staff resistance as a problem to overcome rather than a signal to read. Some cite models without the original sources. If your module asks about a different change, such as a new coding technology, remote work or a department merger, or names other theories such as ADKAR or diffusion of innovations, send the prompt and the situation and the paper will apply those. Details about the affected staff help the action plan. Our HIM 685 papers judge each model by the actions it produces and end with a dated sequence.
Get HIM 685 Module 6 written to your instructions
Send the HIM 685 Module 6 prompt and a description of the change and the people it affects. The paper will explain and compare the change models that fit, choose and justify an approach and turn it into specific actions with timing, finished within two days, and your first request is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More HIM 685 papers and related MS Health Information Management samples
- HIM 685 Module 1 Journal: A Case Analysis of Strengths and Weaknesses
- HIM 685 Module 2 Exchange Model Short Paper: Analyzing the Hybrid Model for Data Exchange
- HIM 685 Module 3 Data Dictionary: Industry Standards and Patient Record Relevance
- HIM 685 Module 4 Discussion: What HIM Leaders Do in an Exchange Project
- HIM 685 Module 5 Final Project Milestone One: A Strategic Analysis for Joining the Exchange
- HIM 685 Module 7 Final Project Milestone Two: The Change Management and Implementation Plan
- HIM 685 Module 8 Journal: A Team Worried About Its Work
- HIM 685 Module 9 Final Project: The Exchange Integration and Change Plan
- HIM 685 Module 10 Reflection: What Leading Change Taught the Writer
- HIM 550 Module 2 Journal: Following One Data Element Through Its Life Cycle
- HIM 530 Module 10 Reflection: What Protecting Information Taught the Writer
- HIM 510 Module 10 Reflection: Growth as a Revenue and Compliance Leader
- HIM 680 Module 3 Final Project Milestone One: A Governance Assessment for Social Risk Data
HIM 685 Module 6 questions, answered
Where can I find a free HIM 685 Module 6 Change Theory Short Paper sample?
The whole HIM 685 Module 6 paper is on this page, comparing Lewin, Kotter and Weiner for a release-of-information team's move to exchange work and setting out ninety days of actions.
What are Lewin's three stages of change?
Unfreezing the existing balance of forces, moving to a new way of working and refreezing to stabilize it so people do not slide back.
What are Kotter's eight steps?
Make the need felt, gather a leading group, set a direction and repeat it, clear the way, win early, build on the wins and make the new way normal.
How is readiness for change measured?
By asking whether people value the change and believe they can carry it out, often through short surveys or structured conversations before each phase.
Can change models be combined?
Yes. Many leaders use one model for sequence, such as Kotter's steps, and another, such as readiness theory, to decide when the team is ready to move on.