HRM 400 Module 6 Reward Alignment Assignment Example

Reviewed by Portia Lambrick, MBA

This HRM 400 Module 6 Reward Alignment Assignment sample shows how one HR system can quietly defeat a change and how to redesign it so it pulls in the same direction. SNHU HRM 400 (HRM-400) asks BS Human Resource Management students to line up pay, appraisal or training with a change already underway. At the composite Fenwick Fixture Company, now owned through an employee stock ownership plan, the paper explains how an individual efficiency bonus works against shared ownership, designs a plant-wide gainsharing plan with its measures and payout formula, estimates its cost, plans a two-year phase-down that protects top earners and names the risks of the new design.

CourseHRM 400 Change Management in Human Resources
ModuleModule 6
Paper typeundergraduate assignment aligning a reward system with an organizational change
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Human Resource Management
UpdatedOctober 2026

Free sample paper for HRM 400 Module 6

1

From Beating the Standard to Sharing the Gain: Redesigning Fenwick Fixture Company's Shop Bonus

[Student Name]

Southern New Hampshire University

HRM 400: Change Management in Human Resources

Reward Alignment Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingFenwick Fixture Company, its bonus figures and its gainsharing plan are an invented teaching case.
2

From Beating the Standard to Sharing the Gain: Redesigning Fenwick Fixture Company's Shop Bonus

Introduction

Fenwick Fixture Company's move to employee ownership asks shop employees to share information, help other shops and care about plant-wide scrap and on-time shipment. One HR system contradicts every part of that request: the individual efficiency bonus, which pays each operator for beating standard times on his or her own jobs. This paper explains how the current bonus works and what it rewards, reviews research on group incentives and ownership, designs a plant-wide gainsharing plan with measures and a formula, estimates its cost and effects, sets out a two-year transition and names the risks of the new design.

What this page is doingOne rule pulling the wrong way.
3

The Current Bonus

Each job in the four shops has a standard time set by industrial engineering. When an operator completes jobs faster than standard over a two-week period, the bonus pays a percentage of base pay proportional to the time saved, capped at 20 percent. Last year shop bonuses totaled about $1.15 million, an average of 9 percent of base pay across 210 shop employees. The distribution is uneven: about 40 veteran operators averaged 15 to 18 percent, while second shift and newer employees averaged 4 to 6 percent.

What this page is doingWhat it pays for.
4

How It Undermines the Change

The bonus rewards three behaviors that ownership needs to end. Operators compete for jobs with generous standards and leave hard jobs to newer colleagues, which supervisors have reported for years. Operators have no reason to stop and fix a defect created upstream, since time spent helping another shop costs them bonus; scrap and rework reached 4.2 percent of material spend last year. And no one is paid for on-time shipment as a whole, the outcome customers penalize, because the bonus measures each person's speed, not whether an order leaves complete. Telling people they are owners while paying them to compete sends two contradictory messages, and employees tend to believe the one attached to money.

What this page is doingRewarded behavior versus needed behavior.
5

What Research Suggests

Welbourne and Gomez-Mejia (1995), reviewing gainsharing research, found that such plans were generally associated with productivity and quality gains, with stronger results where employees took part in designing the plan and could see how their work affected the measures. Blasi et al. (2016), studying firms on lists of the best places to work, found that broad-based employee ownership, profit sharing and gain sharing were linked with better outcomes, especially when combined with employee participation and trust. Pierce et al. (2001) argued that people come to feel psychological ownership of an organization through control, intimate knowledge and personal investment, which suggests that pay tied to shared results, together with open-book information, can build the feeling ownership is meant to create.

What this page is doingGroup pay and ownership.
6

The Gainsharing Design

The new plan will pay every shop employee a quarterly bonus from two pools. The scrap pool: when scrap and rework cost falls below a baseline of 4.2 percent of material spend, half of the savings goes to the pool and half to the company. The shipment pool: when on-time, complete shipment beats 88 percent for the quarter, $120,000 goes to the pool, rising by $40,000 for each additional two points to a maximum of $280,000. Pools are divided among shop employees in proportion to hours worked, so every operator on both shifts receives the same amount per hour.

Gainsharing plan summary

ElementDesign
EligibleAll shop employees after 90 days
PayoutQuarterly, shown on a separate pay statement line
Scrap pool50 percent of savings below 4.2 percent of material spend
Shipment pool$120,000 a quarter at 88 percent on time, up to $280,000 at 96 percent
ShareBy hours worked, equal rate for all
ReviewBaselines reviewed yearly by a joint committee
What this page is doingMeasures and formula.
7

Cost and Effects

At target, scrap falling to 3.2 percent of an estimated $36 million in material spend and on-time shipment reaching 94 percent, the employees' half of the scrap savings would come to about $180,000 a year and the shipment pool to $240,000 a quarter, or $960,000 a year, for a total near $1.1 million. That is close to today's $1.15 million, but the company pays only when plant-wide results improve. For an average operator, the payout at target equals about 9 percent of base pay, roughly $5,400. Second shift and newer employees gain, since they now receive the same hourly rate. The 40 top earners lose: their bonus would fall from about 16 percent of pay to about 9 percent at target.

What this page is doingWhat it will cost and who gains.
8

The Transition

The individual bonus will phase down over eight quarters while gainsharing phases in, so that in each quarter employees receive a declining share of the old bonus plus a rising share of the new one. During the transition, no operator will receive less than 75 percent of his or her average bonus of the past two years, a floor costing about $90,000 in the first year. Three top earners, two first shift lead operators and two second shift employees will sit on the design team that sets final baselines, and every operator will receive a personal estimate before the first quarter of the phase-down.

What this page is doingProtecting the people who lose most.
9

Risks

Group plans invite free riding, since one person's effort barely changes the payout; monthly open-book meetings and peer visibility help limit that. Measures can be gamed, for example by shipping incomplete orders at quarter end, which is why the shipment measure counts only complete orders. Baselines that are set too easy waste money and too hard discourage effort, so the joint committee will review them yearly. Top earners may still leave, a real cost given their skill, which the floor and design role are meant to reduce. Finally, a quarterly payout is less immediate than a biweekly bonus, so the plan posts a running estimate of both pools at every time clock each week, letting crews see how a bad scrap day or a late order moves the number they will share.

What this page is doingWhat could go wrong.
10

Conclusion

The efficiency bonus pays Fenwick's operators to compete. A plant-wide gainsharing plan, phased in with a floor and designed with the people who lose most, pays them to cooperate on the results that repay the ESOP loan and grow their own accounts.

What this page is doingPaying for what ownership needs.
11

References

Blasi, J., Freeman, R., & Kruse, D. (2016). Do broad-based employee ownership, profit sharing and stock options help the best firms do even better? British Journal of Industrial Relations, 54(1), 55-82. https://doi.org/10.1111/bjir.12135

Pierce, J. L., Kostova, T., & Dirks, K. T. (2001). Toward a theory of psychological ownership in organizations. Academy of Management Review, 26(2), 298-310. https://doi.org/10.2307/259124

Welbourne, T. M., & Gomez-Mejia, L. R. (1995). Gainsharing: A critical review and a future research agenda. Journal of Management, 21(3), 559-609. https://doi.org/10.1177/014920639502100307

What the HRM 400 Module 6 instructions ask for

This assignment in HRM 400 usually asks you to choose an HR system, such as compensation, performance management, training or selection, show how it supports or undermines a change and recommend changes. Expect to describe the current system, analyze its fit with the change using research, propose a redesign, address costs and legal or fairness concerns and explain how the transition will be managed. A strong paper shows concretely what behavior the current system rewards, chooses measures that employees can see and influence, puts numbers on cost and on effects for different groups, plans the transition for people who lose and admits the weaknesses of the new design.

How this HRM 400 Module 6 reward alignment assignment example is built

The sample shows that Fenwick Fixture Company's individual efficiency bonus, about 9 percent of shop pay and up to 18 percent for the fastest operators, rewards grabbing easy jobs and ignoring problems in other shops, the opposite of what ownership needs. It designs a plant-wide gainsharing plan paid quarterly, funded by half of the savings when scrap cost falls below a baseline of 4.2 percent of material spend and by a bonus pool when on-time shipment beats 88 percent. At target the plan costs about $1.1 million a year, close to today's $1.15 million bonus spend. The old bonus phases down over eight quarters, with a floor for the 40 top earners.

Where the HRM 400 Module 6 rubric puts the points

The rubric commonly scores analysis of the current HR system, fit with the change, the quality of the redesign, attention to cost and fairness, the transition plan and the use of sources. High-scoring papers show the link between the system and behavior with evidence, design measures that are clear and controllable, estimate costs and effects on groups and handle the transition honestly. Papers lose points for redesigns that sound appealing but have no formula, for ignoring who loses, for measures employees cannot influence or understand, for missing costs and for presenting the new system as free of risk. Markers also reward a design that an operator could check on the back of a pay statement without asking payroll.

HRM 400 Module 6 help: the mistakes that cost points

Start with behavior: write down what the current system pays people to do, then compare it with what the change needs. That gap is your argument. When you redesign, pick two or three measures people can see weekly and influence, and write the formula so an employee could check their own payout. Put a cost on it and compare with what is spent now. Then look hard at who loses. A phase-down, a floor or a role in the design can turn the most skilled skeptics into allies. Cite research on group incentives and on ownership, and close with what could go wrong, such as free riders or measures gamed at month end. A one-line worked example of a quarterly payout for one operator makes the formula far easier to grade.

Get HRM 400 Module 6 written to your instructions

Send the HRM 400 Module 6 instructions and the HR system your change runs into. We show where it pulls against the change, design a replacement with measures and a formula, cost it and plan a fair transition for the people who lose most. About two days; first assignments are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HRM 400 papers and related BS Human Resource Management samples

HRM 400 Module 6 questions, answered

Where can I find a free HRM 400 Module 6 Reward Alignment Assignment sample?

This page carries the full HRM 400 Module 6 assignment, which replaces an individual production bonus with plant-wide gainsharing at an employee-owned manufacturer.

What is gainsharing?

A group incentive plan that shares savings or productivity gains with employees, usually paid as a regular bonus when measured results beat a set baseline.

Why can individual bonuses work against change?

They reward each person's own output, which can discourage helping others, sharing easy work fairly or fixing problems in other departments that a change depends on.

How do you transition employees off an old bonus plan?

Show each person the expected effect, phase the old plan down over time, consider a temporary floor for those who lose most and involve them in designing the replacement.

Does employee ownership improve performance?

Research on shared capitalism finds ownership tends to help most when combined with profit or gain sharing and with participation, not ownership on its own.