| Course | IHP 340 Statistics for Healthcare Professionals |
|---|---|
| Module | Module 3 |
| Paper type | Scatterplot and correlation short paper |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Health Sciences |
| Updated | October 2026 |
Free sample paper for IHP 340 Module 3
Booked Further Out, Missed More Often? Scatterplot and Correlation Analysis of Lead Time and No-Show Rates in 15 Primary Care Clinics
[Student Name]
Southern New Hampshire University
IHP 340: Statistics for Healthcare Professionals
Module Three Short Paper
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Booked Further Out, Missed More Often? Scatterplot and Correlation Analysis of Lead Time and No-Show Rates in 15 Primary Care Clinics
The Question and the Data
A composite network of 15 primary care clinics loses appointment slots every day to patients who do not arrive and do not cancel. The operations director has noticed that some clinics book routine appointments weeks in advance while others can see patients within days, and she asks whether longer booking lead times go along with higher no-show rates. For each clinic, the network calculated the median lead time, the number of days between the day an appointment was booked and the appointment itself, and the no-show rate, the percentage of scheduled appointments missed without cancellation, over the last six months.
Both variables are ratio-level measurements, which makes them suitable for a scatterplot and a Pearson correlation. The data are shown below.
Table 1
Median Lead Time and No-Show Rate by Clinic
| Clinic | Median lead time (days) | No-show rate (%) |
|---|---|---|
| A | 3 | 7.9 |
| B | 5 | 9.4 |
| C | 6 | 8.1 |
| D | 8 | 11.6 |
| E | 9 | 9.0 |
| F | 11 | 12.8 |
| G | 12 | 10.9 |
| H | 14 | 13.5 |
| I | 15 | 15.2 |
| J | 17 | 12.1 |
| K | 19 | 16.0 |
| L | 21 | 14.4 |
| M | 24 | 17.9 |
| N | 26 | 15.3 |
| O | 28 | 11.2 |
Note. Mean lead time 14.5 days (SD 7.8); mean no-show rate 12.4 percent (SD 3.0).
What the Scatterplot Shows
With lead time on the horizontal axis and no-show rate on the vertical axis, the scatterplot shows a positive direction: as lead time increases, no-show rates tend to rise. The form is roughly linear, with no obvious curve. The strength appears moderate to strong, since most points lie near an upward-sloping line but with visible scatter. One point stands apart. Clinic O has the longest lead time, 28 days, but a no-show rate of only 11.2 percent, well below what the pattern of the other clinics would predict. A careful reader notices that point before calculating anything, because one unusual clinic can move a correlation coefficient a long way in a sample this small.
The Correlation and What It Means
The Pearson correlation coefficient for all 15 clinics is r = 0.73, and the relationship is statistically significant (t = 3.82, df = 13, p = .002). By a commonly used guide for medical research, a coefficient between 0.70 and 0.90 represents a high positive correlation (Mukaka, 2012). The coefficient of determination is r squared = 0.53, meaning that about 53 percent of the variation in no-show rates among these clinics is associated with the linear relationship with lead time. The remaining 47 percent is associated with other factors, such as the patients each clinic serves, transportation access and reminder practices.
The least squares line has a slope of about 0.28, which means that, on average, each additional day of median lead time is associated with a no-show rate about 0.28 percentage points higher. Across the range of the data, from 3 to 28 days, that amounts to a difference of roughly 7 percentage points.
Checking the Assumptions and the Uncertainty
A Pearson correlation assumes a linear relationship, quantitative variables and observations that are independent of each other. The first two conditions are met. Independence is reasonable because each clinic has its own patients and schedule, although clinics in the same network share some policies. The larger concern is sample size. With only 15 clinics, the estimate of r is imprecise: a 95 percent confidence interval for the correlation, calculated with the Fisher transformation, runs from about 0.34 to 0.90. The true relationship across clinics like these could therefore be anywhere from modest to very strong. That width is another reason to treat the finding as a signal worth testing rather than a precise measure.
The Outlier
When Clinic O is removed, the correlation rises to r = 0.89 and r squared to 0.79. A single clinic therefore lowers the apparent strength of the relationship considerably. Before deciding whether to exclude it, the analyst should ask why it differs. The clinic manager reports that Clinic O introduced a two-way text reminder system a year ago that asks patients to confirm or cancel three days before the visit. That explanation suggests the clinic is not a data error but a meaningful exception: it may show that the effect of long lead times can be reduced. The outlier should be reported, not deleted, and both coefficients should be shown. Anscombe (1973) demonstrated with four very different datasets that share the same correlation coefficient that summary statistics can hide important features that only a graph reveals, which is why the scatterplot comes first.
Correlation Is Not Causation
The strong correlation does not show that long lead times cause no-shows. Several other explanations are possible. Clinics with long lead times may be busier because they serve larger populations with more social barriers, and those barriers could cause both long waits and missed visits. Clinics with short lead times may be newer or in areas with better public transportation. The direction could even run partly the other way: clinics with many no-shows might overbook to compensate, which lengthens lead times. Because the data are observational and measured at the clinic level, they also cannot show that individual patients who book further ahead are more likely to miss appointments. Drawing that conclusion from group data would be an ecological fallacy.
Recommendation
The analysis supports a cautious recommendation. The network should treat lead time as a warning sign and test interventions rather than assuming a cause. Two tests are reasonable: expanding the two-way reminder system used at Clinic O to two clinics with long lead times, and reserving a share of appointment slots at one clinic for booking within 48 hours. Comparing no-show rates in these clinics before and after the changes, against similar clinics without them, would provide stronger evidence about cause than the correlation alone.
Conclusion
Across 15 clinics, median booking lead time and no-show rate show a high positive linear correlation, r = 0.73, with lead time associated with about half of the variation in no-show rates. One clinic with a reminder system weakens the pattern and points to a possible solution. Because correlation cannot establish causation, the finding should guide testing rather than immediate changes to scheduling policy (Daniel & Cross, 2018).
References
Anscombe, F. J. (1973). Graphs in statistical analysis. The American Statistician, 27(1), 17-21. https://doi.org/10.1080/00031305.1973.10478966
Daniel, W. W., & Cross, C. L. (2018). Biostatistics: A foundation for analysis in the health sciences (11th ed.). Wiley.
Mukaka, M. M. (2012). A guide to appropriate use of correlation coefficient in medical research. Malawi Medical Journal, 24(3), 69-71.
What the IHP 340 Module 3 instructions ask for
IHP 340's Module 3 paper pairs two measured variables, plots them and asks what the pattern and its coefficient say. Many prompts provide data and ask you to describe the scatterplot's direction, form and strength, calculate or interpret the correlation coefficient and explain what the relationship means and does not mean. Some ask about outliers or r squared. Expect a short APA 7 paper with the scatterplot included. Describe the picture before the number. The IHP 340 Module 3 guidelines say whether you must produce the plot yourself in Excel or another tool or interpret a given one. Report the units of each variable and the number of clinics.
How this IHP 340 Module 3 correlation short paper example is built
The question opens the paper with a practical stake: if longer lead times drive no-shows, the network might change its booking rules. The dataset of 15 clinics is described with its two variables and their units. The scatterplot section describes direction, form and strength in words, a positive, roughly linear pattern with one clinic far from the rest. The correlation section reports r and r squared and explains each in plain terms. The assumptions section checks linearity and notes that 15 clinics give a wide confidence interval. The outlier section shows how much the correlation changes without that clinic and why. The causation section names other explanations, such as patient mix.
Where the IHP 340 Module 3 rubric puts the points
An IHP 340 correlation paper is graded on the description of the scatterplot, the interpretation of r and r squared, the treatment of outliers and assumptions and the conclusions drawn, with IHP 340 rating each row on SNHU's four levels. The interpretation row rewards plain-language explanation of strength and direction and of what r squared means. The scatterplot row looks for direction, form and strength described before numbers. A plot with labeled axes and units is expected. Mentioning the one distant clinic in the description, before computing anything, shows the grader you read the picture first. Conclusions earn credit when they avoid causal claims. Examining an outlier's influence shows depth. A labeled scatterplot helps the grader follow the description.
IHP 340 Module 3 help: the mistakes that cost points
Correlation papers often lose points by reporting r without describing the scatterplot, which can hide a curved or clustered pattern. Another common gap is treating correlation as proof that lead time causes no-shows. Some students confuse r with r squared or describe a moderate correlation as strong. Others ignore an obvious outlier. Watch sample size, since 15 points produce a wide range of plausible correlations, and say so in the paper. Finally, frame the recommendation carefully, because an IHP 340 grader rewards a paper that suggests testing a booking change in a few clinics rather than one that declares the problem solved by a single coefficient.
Get IHP 340 Module 3 written to your instructions
Send the IHP 340 Module 3 prompt, the rubric and your dataset or scatterplot. A short paper interpreting your output returns within 24 to 48 hours, and the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More IHP 340 papers and related BS Health Sciences samples
- IHP 340 Module 1 Statistics in Practice Discussion: Levels of measurement on an intake form
- IHP 340 Module 2 Article Analysis Short Paper: Statistics in the Berkeley soda tax study
- IHP 340 Module 4 Confidence Interval Journal: Three confidence intervals from SPRINT
- IHP 340 Module 5 Hypothesis Testing Short Paper: Kiosks and lab wait times t test
- IHP 340 Module 6 Methods Identification Worksheet: Choosing tests for four scenarios
- IHP 340 Module 7 Chi-Square Discussion: Chi-square on ride vouchers and referrals
- IHP 340 Module 8 Final Project Analysis Review: Statistical review of a communication survey
- HCM 440 Module 2 Research Question Short Paper: Framing an Answerable Question and Searching the Literature
- HCM 205 Module 3 Abbreviations Short Paper: Error-Prone Abbreviations and How Clinics Prevent Harm
- IHP 430 Module 6 Final Project Milestone Three: Implementing the nodule navigator program
- IHP 450 Module 2 Staffing and Skill Mix Discussion: Pricing a medical assistant or pharmacist
IHP 340 Module 3 questions, answered
What does IHP 340 Module 3 usually ask for?
Around the third module, healthcare statistics courses commonly ask students to interpret a scatterplot and a correlation coefficient between two variables in a healthcare dataset, describing direction, form and strength, and explaining why correlation does not establish causation. Your prompt names the dataset and variables.
How do I describe a scatterplot?
Describe the direction (positive or negative), the form (linear or curved), the strength (how tightly the points cluster around a line) and any unusual features such as outliers or clusters. Do this before calculating r, because a correlation coefficient only summarizes linear relationships.
What is the difference between r and r squared?
The correlation coefficient r measures the direction and strength of a linear relationship, from -1 to 1. The coefficient of determination, r squared, is the proportion of the variation in one variable that is associated with its linear relationship to the other, expressed from 0 to 1 or as a percentage.
Where can I find a free IHP 340 Module 3 correlation sample?
The complete paper is on this page: booking lead time against no-show rates across 15 clinics, with the scatterplot described, r and r squared explained, an outlier examined and the causation trap named. Use it as a model.
How strong is a correlation of 0.5?
A coefficient of about 0.5 is usually described as moderate, meaning the variables move together noticeably but with a lot of scatter. Squaring it gives r squared of 0.25, so the relationship accounts for about a quarter of the variation.