IHP 330 Module 1 Epidemiology Journal Example

Reviewed by Delia Ravenscroft, MSN, RN

This IHP 330 Module 1 journal practices the first moves in epidemiology on an emerging condition: alpha-gal syndrome, an allergy to red meat linked to tick bites. SNHU IHP 330 (IHP-330), Principles of Epidemiology, sits in the BS Health Sciences core, and its opening journal has students describe a health problem the way epidemiologists do, before any formulas appear. A composite health administration student chooses the condition after a coworker's reaction to a hamburger. The journal examines the case definition the national data use and what it includes and misses. It then describes the condition by person, place and time, using published CDC estimates. A short paragraph shows why counts alone mislead and rates are needed, and the entry closes with a question the student wants the course to answer.

CourseIHP 330 Principles of Epidemiology
ModuleModule 1
Paper typeEpidemiology journal entry
LengthAbout 350 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Health Sciences
UpdatedOctober 2026

Free sample paper for IHP 330 Module 1

1

Module One Journal: Describing a Health Issue Epidemiologically

Journal: A tick bite and a hamburger

I chose alpha-gal syndrome because I had never heard of it until a coworker developed hives hours after eating steak. The condition is an allergic reaction to a sugar molecule found in most mammalian meat, and in the United States it is associated mainly with bites from the lone star tick.

Its case definition shows how much depends on what is being counted. The largest national study defined a suspected case as a person with a positive laboratory test for alpha-gal antibodies. Between 2017 and 2022, 90,018 people had positive results, and the number testing positive each year rose from 13,371 in 2017 to 18,885 in 2021 (Thompson et al., 2023). But a positive antibody test is not the same as the allergy; some people with antibodies have no symptoms, and people who are never tested are never counted. A companion survey found that 42 percent of health care providers had never heard of the condition (Carpenter et al., 2023), so many true cases are likely missing.

By person, the syndrome affects people exposed to ticks, often those who spend time outdoors. By place, suspected cases were concentrated in counties in the southern, midwestern and mid-Atlantic regions, overlapping the lone star tick's range. By time, the counts increased over the study period (Thompson et al., 2023).

The map of counts looks like a map of risk, but it is partly a map of testing. Counties with more allergists, more awareness or more testing will report more cases. To compare places fairly, epidemiologists divide cases by the population at risk over a defined period to calculate a rate (Centers for Disease Control and Prevention [CDC], 2012). Even then, a rate built on laboratory tests reflects who gets tested. For a local health department, the first step would be to make the condition reportable with a clinical case definition, so that counts could be turned into rates that mean something. Working through this example showed me that the case definition decides what an epidemic looks like before any number is calculated.

What this page is doingThe journal applies each Module 1 concept to real data and notices how the case definition and testing patterns shape the numbers. The highlighted sentence states the key insight about counts and rates.
2

References

Carpenter, A., Drexler, N. A., McCormick, D. W., Thompson, J. M., Kersh, G., Commins, S. P., & Salzer, J. S. (2023). Health care provider knowledge regarding alpha-gal syndrome: United States, March-May 2022. MMWR. Morbidity and Mortality Weekly Report, 72(30), 809-814. https://doi.org/10.15585/mmwr.mm7230a1

Centers for Disease Control and Prevention. (2012). Principles of epidemiology in public health practice: An introduction to applied epidemiology and biostatistics (3rd ed.). U.S. Department of Health and Human Services.

Thompson, J. M., Carpenter, A., Kersh, G. J., Wachs, T., Commins, S. P., & Salzer, J. S. (2023). Geographic distribution of suspected alpha-gal syndrome cases: United States, January 2017-December 2022. MMWR. Morbidity and Mortality Weekly Report, 72(30), 815-820. https://doi.org/10.15585/mmwr.mm7230a2

What the IHP 330 Module 1 instructions ask for

The first IHP 330 journal usually asks you to choose a health condition and begin describing it in epidemiological terms. Many prompts ask for a case definition, the condition's distribution by person, place and time and why it matters to public health. Some ask you to reflect on how epidemiology applies to your field. Journals in SNHU courses are typically read by the instructor only, so a personal opening is fine, but sources should still be cited in APA 7. A few hundred words is common. Pick a condition with published national data you can find. The IHP 330 Module 1 prompt lists any required elements, such as a source from CDC.

How this IHP 330 Module 1 epidemiology journal example is built

The journal opens with why the condition was chosen, a coworker's hives hours after a hamburger, which also shows the delayed reaction that makes alpha-gal hard to recognize. The case definition paragraph explains what the national surveillance counts, a positive antibody test with compatible symptoms, and what it misses, such as people never tested. The person, place and time paragraph uses CDC estimates to show where cases cluster, in the South, Midwest and mid-Atlantic where the lone star tick lives, and who is affected. The count-versus-rate paragraph explains why a state with more people will report more cases. The closing question asks how many cases go undiagnosed.

Where the IHP 330 Module 1 rubric puts the points

IHP 330 journals are typically scored on a journal rubric with rows for the use of epidemiological concepts, reflection and connection to sources and writing, and IHP 330 grades each on SNHU's four levels. Credit on the concepts row goes to entries that handle case definition, distribution and rate correctly. Reflection earns credit when the entry says why the condition matters to the writer's field. Sources should be credible public health data, such as CDC reports. Writing covers clarity and APA citation. Instructors reading the first journal often comment on whether the student distinguishes counts from rates, since that idea runs through the rest of the course.

IHP 330 Module 1 help: the mistakes that cost points

First epidemiology journals often describe a disease clinically, symptoms and treatment, rather than epidemiologically by person, place and time. Another common gap is quoting case counts without population, which makes comparisons meaningless. Some students use a case definition from a news story instead of the surveillance system. Others choose a condition with no available data. Watch dates; surveillance figures change, so cite the year. Finally, end with a question you want answered, since an IHP 330 instructor uses those questions to see what the student finds puzzling and the question often becomes a thread for the next modules. Keep the entry within the stated length. Cite the CDC page by its title and year.

Get IHP 330 Module 1 written to your instructions

Tell us the health issue you picked for the IHP 330 Module 1 journal and share the prompt and rubric. You will have an entry describing it epidemiologically within 24 to 48 hours, and the first costs nothing. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More IHP 330 papers and related BS Health Sciences samples

IHP 330 Module 1 questions, answered

What does the IHP 330 Module 1 journal usually ask?

The first journal commonly asks students to research a health issue and begin describing it in epidemiological terms, such as its case definition and its distribution by person, place and time, as practice for elements used later in the final project. Follow the journal prompt for required elements.

What is a case definition?

A case definition is a set of standard criteria for deciding whether a person has a particular disease or condition for public health purposes. It usually combines clinical criteria, laboratory criteria and limits on person, place and time, and it may classify cases as suspected, probable or confirmed.

Why are rates more useful than counts?

A count tells you how many cases occurred, but not how common the condition is, because places and groups differ in population size. A rate divides cases by the population at risk over a period of time, allowing fair comparisons between counties, groups or years.

Where can I find a free IHP 330 Module 1 journal sample?

A complete entry is above: alpha-gal syndrome described with a case definition, distribution by person, place and time and the count-versus-rate problem. Use it to see the opening concepts of epidemiology applied to one condition.

What causes alpha-gal syndrome?

It is an allergy to a sugar molecule called alpha-gal found in most mammal meat. In the United States it is linked mainly to bites from the lone star tick, and reactions often appear hours after eating red meat.