INT 433 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This INT 433 Module 1 Discussion sample takes up the oldest question in international marketing: should a company sell the same thing the same way everywhere, or adapt to each country? SNHU INT 433 (INT-433) puts that debate in front of BS International Business students in the first week of its multinational marketing course. The post applies it to Flint River Nut Butters, a composite peanut butter maker in Albany, Georgia, preparing to sell in Britain, South Korea and Mexico. It weighs the classic argument for global standardization against research showing the answer depends on context and that consumer habits can diverge as incomes rise, then asks classmates which product they know should never be standardized.

CourseINT 433 Multinational Marketing
ModuleModule 1
Paper typeundergraduate discussion post on standardization versus adaptation in international marketing
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS International Business
UpdatedOctober 2026

Free sample paper for INT 433 Module 1

1

Module One Discussion

The Jar Stays, the Label Changes

Down in southwest Georgia, Flint River Nut Butters turns local peanuts into roughly $85 million of yearly sales, nearly all of them domestic. Next year it plans to enter Britain, South Korea and Mexico. The finance team would like one product, one label and one campaign, translated. The sales team in Seoul says that would fail.

What this page is doingOne jar or three?
2

Levitt (1983) argued that technology and communication were making consumer preferences converge, so that companies selling standardized, high-quality products at low prices would beat those catering to local differences. A single Flint River jar would keep production simple, let the company buy jars and labels in bulk and present one brand online, where shoppers in Seoul and Manchester see the same pictures.

What this page is doingThe case for one jar.
3

Theodosiou and Leonidou (2003), reviewing decades of empirical studies, found no consistent evidence that either full standardization or full adaptation performs better; results depended on the product, the markets and the fit between strategy and environment. Research on cultural values also suggests that as incomes converge, consumer behavior can diverge, because people with more money express their cultural preferences more freely (de Mooij & Hofstede, 2002). Korean shoppers buy peanut butter mostly as a sweet spread for toast and snacks and want small jars that fit small kitchens. British shoppers increasingly read sugar labels. Mexican shoppers buy most packaged food in small convenience stores, where large jars rarely fit on shelves.

What this page is doingThe case against.
4

Keep the recipe core, the roasting standard and the brand promise, Georgia peanuts roasted in small batches, identical everywhere. Adapt jar size, sweetness level by line, labels and claims, price and channel to each country.

What this page is doingMy position.
5

Three label sets and two extra jar sizes add cost, perhaps 4 percent on each unit in the first year. A product that does not fit the shelf costs more, and a single campaign translated word for word would miss what each market actually responds to: health claims in Britain, convenience and small treats in Korea, value and familiar flavors in Mexico.

What this page is doingWhat it costs.
6

What product do you know that would fail if it were sold exactly the same way everywhere, and which element would sink it?

What this page is doingFor classmates.
7

References

de Mooij, M., & Hofstede, G. (2002). Convergence and divergence in consumer behavior: Implications for international retailing. Journal of Retailing, 78(1), 61-69. https://doi.org/10.1016/S0022-4359(01)00067-7

Levitt, T. (1983). The globalization of markets. Harvard Business Review, 61(3), 92-102.

Theodosiou, M., & Leonidou, L. C. (2003). Standardization versus adaptation of international marketing strategy: An integrative assessment of the empirical research. International Business Review, 12(2), 141-171. https://doi.org/10.1016/S0969-5931(02)00094-X

What the INT 433 Module 1 instructions ask for

The opening INT 433 discussion usually asks whether companies should standardize or adapt their marketing across countries, often using a product or brand you know. Prompts may reference Levitt's argument about global markets, ask about the advantages and risks of each approach or ask which elements of the marketing mix are easiest to standardize. A good post works through one product in specific countries, separates the elements that can stay the same from those that need to change, uses research rather than slogans, recognizes that the answer can differ by mix element and by market and closes with a question that brings classmates' own products into the thread.

How this INT 433 Module 1 discussion example is built

The sample examines Flint River Nut Butters, a composite Albany, Georgia, company with about $85 million in sales, planning launches in Britain, South Korea and Mexico. Levitt's argument that modern consumers everywhere prefer standardized, low-priced products suggests one jar for all three. Theodosiou and Leonidou's review of the empirical research finds that neither full standardization nor full adaptation is consistently superior, and research on cultural values shows that consumer behavior can diverge even as incomes converge. The post argues for keeping the recipe core, quality and brand promise while adapting jar sizes, sweetness, labels and channels, and asks peers which product should never be standardized.

Where the INT 433 Module 1 rubric puts the points

Graders of the first INT 433 thread usually look for an accurate grasp of the standardization debate, application to a real or realistic product, a nuanced position, research support and replies that add something. Strong posts treat standardization element by element rather than as a single yes or no, use evidence about specific markets and cite both sides of the debate. Points slip when the post picks a side on principle, when countries are described only in generalities, when the classic arguments are quoted without testing them, when no sources appear and when replies agree with a classmate rather than suggesting a market where the argument fails. Naming a rough cost of adapting, rather than treating adaptation as free, is a detail that tends to strengthen the post.

INT 433 Module 1 help: the mistakes that cost points

Choose one product and two or three countries you can describe concretely. Then go element by element: the product itself, its packaging, its name and message, its price and where it is sold. For each, ask whether the same choice would work everywhere or whether buyers, retailers or rules differ. Usually the core product travels better than the package, the price or the channel. Use research on both sides of the debate, including evidence that consumer habits do not always converge as countries grow richer. Take a position that is specific about what to keep and what to change. End by asking classmates which product they think should never be standardized.

Get INT 433 Module 1 written to your instructions

Send the INT 433 Module 1 prompt and a product you want to take abroad. We sort what should stay the same from what must change, ground the split in marketing research and end with a prompt that gets classmates arguing from their own examples. Delivered in two days or so; a first post costs nothing. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 433 papers and related BS International Business samples

INT 433 Module 1 questions, answered

Where can I find a free INT 433 Module 1 Discussion sample?

The full INT 433 Module 1 post is on this page, weighing standardization against adaptation for a Georgia peanut butter brand entering three countries.

What is standardization in international marketing?

Using the same product, brand, message, price and channels across countries to gain economies of scale and a consistent global image.

What did Levitt argue about global markets?

In 1983 Levitt argued that technology was making consumer preferences converge, so companies should sell standardized, high-quality, low-priced products worldwide.

Is standardization or adaptation more profitable?

Reviews of the research find no universal answer; the best balance depends on the product, the markets and how similar buyers, competitors and rules are.

Which marketing mix elements are usually adapted?

Price and distribution are most often adapted, packaging and promotion frequently, while the core product and brand identity are more often kept consistent.