| Course | MBA 620 Measuring Success in an Organization |
|---|---|
| Module | Module 5 |
| Paper type | Financial and performance ratio analysis |
| Length | About 1,310 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for MBA 620 Module 5
Financial and Performance Analysis of Cascade Outfitters, Inc.: Why Fiscal 2025 Sales Grew 6.0 Percent While Return on Equity Fell From 32.7 to 20.3 Percent
Student Name
College of Online and Continuing Education, Southern New Hampshire University
MBA 620: Measuring Success in an Organization
Instructor Name
Month Day, Year
Cascade Outfitters: Growth on the Top Line, Pressure Underneath
Cascade Outfitters, Inc. is a composite specialty outdoor retailer operating 34 stores across the Pacific Northwest and Mountain West, plus a direct channel that produced 18 percent of revenue. Fiscal 2025 looks, at a glance, like a good year. Net sales reached $412.6 million against $389.4 million in fiscal 2024, growth of 6.0 percent, and the company opened five stores without missing a payroll or a vendor payment. Net income tells the other half. It fell from $21.4 million to $14.1 million, a decline of 34.1 percent, on sales that were $23.2 million higher. The purpose of this analysis is to establish where the $7.3 million went and whether the structure that produced the growth can be carried into fiscal 2026.
The income statement locates most of it. Gross profit was $144.4 million on $412.6 million of sales, a gross margin of 35.0 percent, down from $140.2 million on $389.4 million, or 36.0 percent. One hundred basis points of gross margin on fiscal 2025 sales is $4.1 million. Selling, general, and administrative expense rose from $108.0 million to $118.9 million, an increase of 10.1 percent against sales growth of 6.0 percent, so operating income fell from $32.2 million to $25.5 million even as the store count grew. Interest expense rose from $4.1 million to $6.9 million. Nothing unusual happened below the operating line, and the effective tax rate held at 24 percent in both years.
The balance sheet explains the interest. Inventory grew from $74.3 million to $96.7 million, an increase of $22.4 million, or 30.1 percent, against sales growth of 6.0 percent. Long-term debt grew from $62.0 million to $82.0 million over the same 12 months. The two numbers are close enough to state the relationship plainly: Cascade borrowed roughly twenty million dollars and put it on the shelves. Total assets ended the year at $225.0 million against $200.0 million, with equity nearly flat at $70.0 million after dividends, so almost every dollar of that growth was financed by someone other than the shareholder. The statements follow the elements the FASB conceptual framework defines, so each line carries its ordinary meaning (Financial Accounting Standards Board, 2021).
Ratio Analysis: Liquidity, Efficiency, Leverage, and Return
Liquidity looks better than it is. The current ratio improved from 1.68 ($104.0 million over $62.0 million) to 1.88 ($124.0 million over $66.0 million), which a reader skimming the page would call progress. The quick ratio moved the other way, from 0.41 to 0.34, because the improvement in current assets is inventory, not cash. Efficiency confirms it. Inventory turnover, computed as cost of goods sold over average inventory, fell from 3.48 times ($249.2 million over $71.6 million) to 3.14 times ($268.2 million over $85.5 million), which is 105 days of inventory on hand in fiscal 2024 and 116 days in fiscal 2025. Eleven days at fiscal 2025 cost of goods sold is about $8.1 million of cash sitting in stock rooms.
Leverage and coverage are where the risk is. Total liabilities to equity rose from 1.90 to 2.21, and the cash conversion cycle stretched from 59 days to 71 days, driven almost entirely by inventory: days sales outstanding barely moved, 10.4 to 11.0, and days payable outstanding held near 56. Times interest earned, operating income over interest expense, fell from 7.85 to 3.70. That single ratio deserves attention out of proportion to its size. Against a coverage covenant of 3.00, which is ordinary for a retailer carrying this much debt, operating income of $25.5 million has $4.8 million of room before the ratio touches the floor. An 18.8 percent decline in operating income would be enough. Coverage is also the ratio lenders actually watch, and it moves faster than the others (Palepu et al., 2019).
Return on equity is the ratio that most conceals what happened, so it is worth decomposing. Return on average equity fell from 32.7 percent to 20.3 percent. In DuPont terms (Brigham & Ehrhardt, 2020), fiscal 2024 was a 5.50 percent net margin times 2.01 asset turnover times a 2.96 equity multiplier. Fiscal 2025 was a 3.42 percent net margin times 1.94 asset turnover times a 3.06 equity multiplier. Both years use average balances, computed from fiscal 2023 opening figures of $188.0 million in total assets and $62.0 million in equity. Two of the three terms deteriorated and the third, leverage, increased. Read plainly, the only factor working in the shareholder's favor last year was borrowing, and borrowing raises return and risk in the same motion. A 20.3 percent return that rests on an equity multiplier of 3.06 and coverage of 3.70 is a different number from a 20.3 percent return earned on margin.
Recommendation: Fund Fiscal 2026 From Working Capital, Not From the Revolver
The numbers support one recommendation with three parts, and they do not support a fourth. First, return days of inventory to 105 by the end of fiscal 2026, the level Cascade held a year ago, which releases roughly $8.1 million of cash at current cost of goods sold and reduces the borrowing that produced the $2.8 million increase in interest expense. Second, hold new store openings at two rather than five, since the five opened last year contributed to a 10.1 percent rise in operating expense against 6.0 percent sales growth. Third, end the promotional cadence that cost 100 basis points of gross margin, worth $4.1 million on fiscal 2025 volume.
What the numbers do not support is a cut to the direct channel or a reduction in store selling hours. The direct channel carries 18 percent of revenue at a gross margin above the chain average, and store payroll is not where operating expense grew; occupancy, pre-opening cost, and distribution account for most of the $10.9 million increase. Cutting selling labor in a business holding 116 days of inventory would slow the very sell-through the plan depends on. Measurement discipline matters here as much as the arithmetic: financial ratios report what already happened, and they report it late (Penman, 2013), so they need pairing with operating measures that move first (Kaplan & Norton, 1996).
Success in fiscal 2026 is therefore measured on four figures reported monthly rather than on sales growth alone: days inventory on hand, with a target of 105 or lower by the fourth quarter; gross margin, with a floor of 35.8 percent; times interest earned, with a floor of 4.50 against the 3.00 covenant; and free cash flow, which was negative in fiscal 2025 and must turn positive on a trailing twelve-month basis by the third quarter. If sales grow only 2 percent while those four move as planned, the year is a success by this analysis. The figures here are illustrative and internally consistent for a composite company; applied to a filer, the same ratios would be built from the statements in the annual report on Form 10-K (U.S. Securities and Exchange Commission, 2023).
References
Brigham, E. F., & Ehrhardt, M. C. (2020). Financial management: Theory and practice (16th ed.). Cengage Learning.
Financial Accounting Standards Board. (2021). Concepts Statement No. 8: Conceptual framework for financial reporting, Chapter 4, Elements of financial statements. Financial Accounting Foundation. https://www.fasb.org/
Kaplan, R. S., & Norton, D. P. (1996). The balanced scorecard: Translating strategy into action. Harvard Business School Press.
Palepu, K. G., Healy, P. M., & Peek, E. (2019). Business analysis and valuation: IFRS edition (5th ed.). Cengage Learning.
Penman, S. H. (2013). Financial statement analysis and security valuation (5th ed.). McGraw-Hill Irwin.
U.S. Securities and Exchange Commission. (2023). How to read a 10-K/10-Q. https://www.sec.gov/oiea/investor-alerts-and-bulletins/how-read-10-k10-q
What the MBA 620 Module 5 instructions ask for
The Module 5 assignment in MBA 620 usually asks for a financial and performance analysis of a company using ratios. Prompts commonly expect at least one ratio from each family, liquidity, efficiency, debt and profitability, often with return on equity decomposed, plus interpretation and a recommendation. A composite company with consistent statements is acceptable when no real filer is required. Show the inputs to each ratio. Group ratios so each group answers a question, and end with a recommendation the ratios support. Name the measures that would show the recommendation working. Expect several APA 7 pages with tables. Your section's prompt states whether a specific company or industry benchmark is required.
How this MBA 620 Module 5 financial performance analysis example is built
The title names the company, the period and the analytic frame. The opening states the puzzle in dollars before naming a ratio, which makes the reader want the answer. The ratio section groups measures: liquidity asks whether bills get paid, efficiency asks how long cash sits in stock, the debt ratios ask who financed growth and return asks what shareholders earned. Every ratio shows its inputs. The current ratio looks steady, but the quick ratio fell, and days of inventory grew sharply. A DuPont breakdown shows lower margin and turnover. The recommendation is specific and costed, and it names what the numbers do not support, such as new store openings. Closing measures set targets.
Where the MBA 620 Module 5 rubric puts the points
MBA 620 grades the ratio analysis on the selection and accuracy of ratios, the interpretation, the link to a recommendation and the measures that follow, and MBA 620 scores each row on SNHU's four levels. Graders recompute ratios from the inputs shown, so arithmetic counts heavily. Interpretation earns credit when ratios are grouped and answer a question. The recommendation scores well when it is costed and traced to specific ratios. Naming what the numbers do not support, such as new stores, shows judgment that graders credit. Measures with targets let the grader see how the recommendation would be judged later.
MBA 620 Module 5 help: the mistakes that cost points
Ratio analyses often lose points by reading like lists, a table of twenty ratios with a sentence each. Grouping them by question fixes that. Another common gap is ratios without inputs, which graders cannot check. Some students recommend something the ratios do not support, such as expansion during an inventory build. Others stop at findings and never say what management should do. A ratio paper without a decision reads as homework rather than analysis. Watch the quick ratio, which strips inventory and often reveals what the current ratio hides. Finally, add measures, because an MBA 620 grader expects a performance analysis to end with what the company should track, such as days of inventory, to know whether the fix is working.
Get MBA 620 Module 5 written to your instructions
Send the MBA 620 Module 5 instructions, the statements you were given and the grading rubric. The paper states the puzzle in dollars, groups ratios so each answers a question, shows every input so a reader can recompute it and ends with a costed recommendation and measures. Your first MBA 620 paper costs nothing and usually arrives within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MBA 620 papers and related MBA samples
- MBA 620 Module 1 Measuring Success Discussion: An airline's record margin and warning light
- MBA 620 Module 2 Project Milestone One Balanced Scorecard: A scorecard for airline acquisition targets
- MBA 620 Module 3 Acquisition Performance Evaluation: Comparing two regional airline targets
- MBA 620 Module 4 Acquisition Risk Assessment: Risk register for two acquisitions
- MBA 620 Module 6 Performance Dashboard Analysis: Dashboard for an airline acquisition
- MBA 620 Module 7 Project Milestone Two Acquisition Evaluation: Scoring the two airline targets
- MBA 620 Module 8 Final Executive Summary: Executive summary to the airline board
- MBA 645 Module 7 Brand Communications Assignment: Telling a Sugarhouse Story to Younger Buyers
- MBA 530 Module 1 Leadership Direction Discussion: One sentence through a quality recall
- MBA 699 Module 2 Milestone One Guiding Coalition: Forming Prairieview's guiding coalition
MBA 620 Module 5 questions, answered
Which ratios does MBA 620 Module 5 usually expect?
Most sections expect at least one ratio from each family: liquidity, efficiency or activity, debt or solvency, and profitability, with return on equity often decomposed. The example above computes ten and shows the inputs for each. Your classroom instructions and rubric set the required list, and graduate business courses commonly stage this analysis as a milestone that feeds the final project.
Do I have to use a real public company?
The paper above uses a composite retailer with internally consistent statements, which is acceptable when no specific filer is required. If yours must be real, pull the income statement, balance sheet, and cash flow statement from the company's annual report on Form 10-K through the SEC EDGAR database, and cite the filing itself rather than a summary site that reformats the numbers.
How do I keep a ratio analysis from reading like a list?
Group the ratios, show the inputs, and make each group answer a question. Liquidity asks whether the bills get paid, efficiency asks how long cash sits in stock, debt ratios ask who financed the growth, and return asks what the owner earned. Then say what the pattern means in one plain sentence before you recommend anything.
Where can I find a free MBA 620 Module 5 sample paper?
The finished analysis is above: a specialty retailer whose sales grew while return on equity fell, traced through grouped ratios with every input shown, ending in a costed funding recommendation and measures. Use it as a model.
Why can sales rise while return on equity falls?
Profit can shrink if costs grow faster than sales, and equity returns can fall further if inventory and borrowing grow. A DuPont breakdown shows whether margin, asset turnover or borrowing explains the drop.