| Course | MKT 205 Applied Marketing Strategies |
|---|---|
| Module | Module 1 |
| Paper type | undergraduate discussion post applying the marketing mix to a small food brand |
| Length | About 370 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 205 Module 1
Module One Discussion
Four Ps and a Freezer Case
I work in a family food business, and for this course I will use a composite company close to it: Lackawanna Pierogi Company of Scranton, Pennsylvania. It was started in 1987 by a grandmother selling potato and cheese pierogi at her parish festival, and her granddaughter now runs it with nine employees. Sales are about $1.1 million a year, almost half from church festivals and farmers markets, about a third from two delis and the rest from frozen boxes shipped to former Scranton residents. Last month, Riverside Markets, a regional chain with 38 stores in northeastern Pennsylvania, invited the company to pitch a frozen line.
Product: the company makes eleven flavors but cannot freeze and supply all of them; four is realistic. Price: the national frozen brand sells a dozen for about $3.99, while a dozen of ours would need to sell near $7.49 for both the store and the company to earn a margin. Place: the chain wants a fee for each item in each store, and the freezer shelf position matters. Promotion: the company has no advertising budget, but its family members have handed out samples at festivals for decades. Every choice limits the others. A $7.49 price only works if the product is visibly different, and that difference only shows if shoppers taste it or see a story on the box.
Constantinides (2006) argued that the four Ps look inward, at what the seller controls, and neglect the relationship with the customer, which is exactly what the festival business runs on. Smith (1956) separated differentiation, making a product stand out from rivals, from segmentation, fitting the offer to a particular group of buyers; Lackawanna could do either, but probably not both at once in 38 stores. Ataman et al. (2010), studying 70 mature brands across 25 categories in France, found that product and distribution had far larger long-term effects on sales than advertising or discounting, which suggests that getting the right flavors into the right freezers matters more than any promotion budget.
If you were advising the owner, which P would you decide first, and why? I lean toward product, because price and promotion both depend on whether shoppers believe the difference is real.
References
Ataman, M. B., van Heerde, H. J., & Mela, C. F. (2010). The long-term effect of marketing strategy on brand sales. Journal of Marketing Research, 47(5), 866-882. https://doi.org/10.1509/jmkr.47.5.866
Constantinides, E. (2006). The marketing mix revisited: Towards the 21st century marketing. Journal of Marketing Management, 22(3-4), 407-438. https://doi.org/10.1362/026725706776861190
Smith, W. R. (1956). Product differentiation and market segmentation as alternative marketing strategies. Journal of Marketing, 21(1), 3-8. https://doi.org/10.1177/002224295602100102
What the MKT 205 Module 1 instructions ask for
The opening MKT 205 discussion usually asks you to introduce yourself and explain the marketing mix, often by applying the four Ps to a company or product you know. Some prompts also ask whether the mix is still a useful tool. A strong post applies each P to one concrete decision rather than describing a company in general, shows how the four choices depend on each other and uses at least one source that goes beyond the textbook definition. It is even better when it notes a limitation of the framework, such as its focus on what the seller controls rather than on the customer, because later modules build on that critique. A brief introduction of yourself should stay short so that the analysis has room.
How this MKT 205 Module 1 discussion example is built
The sample introduces Lackawanna Pierogi Company of Scranton, Pennsylvania, a family business that sells hand-pinched pierogi at church festivals, farmers markets and two delis, with sales of about $1.1 million. A 38-store regional chain, Riverside Markets, has invited it to pitch a frozen line. The post walks product, price, place and promotion through that decision: four flavors or eight, a premium price beside the national brand, shelf space with fees attached and in-store sampling. It notes Constantinides's critique that the mix looks inward, Smith on differentiation versus segmentation and Ataman, van Heerde and Mela's finding that product and distribution outweighed advertising and discounting, and asks which P to settle first.
Where the MKT 205 Module 1 rubric puts the points
Grading for this first discussion tends to emphasize an accurate explanation of the four Ps, a specific application, use of a source beyond the textbook and engagement with classmates. Strong posts tie each P to the same decision, show how a choice in one P limits the others and treat the framework critically. Posts lose points for generic descriptions of a famous brand, for listing the four Ps as definitions without an example, for sources that are named but not explained and for replies limited to compliments. Instructors also notice when a post uses numbers, such as a price or a store count, because that makes the application testable rather than descriptive. Correct APA citations for any source also count.
MKT 205 Module 1 help: the mistakes that cost points
Pick a small company or product you know well, ideally one facing a real choice such as entering a new channel. For each P, write the actual decision it faces, in one or two sentences, with a number where you can. Then show one link between the Ps, such as how a chosen price affects which stores will carry the product. Add one source on the mix or its critics and say what it argues. Keep your self-introduction to a few lines. End by asking classmates which P they would decide first, because the order of decisions is where most of the useful disagreement lies. Reply to at least two peers with a specific point.
Get MKT 205 Module 1 written to your instructions
Share the MKT 205 Module 1 prompt and the company or product you would like to use. We walk the four Ps through one real decision, point out where the mix falls short and use research on what drives brand sales to set up a good question for classmates. Your first post is free and ready in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 205 papers and related BS Marketing samples
- MKT 205 Module 2 Situation Analysis Assignment: Where a Festival Brand Stands
- MKT 205 Module 3 Milestone One: Target Market and Positioning
- MKT 205 Module 4 Discussion: Pricing Beside the National Brand
- MKT 205 Module 5 Milestone Two: The Marketing Mix Strategy
- MKT 205 Module 6 Promotion Plan Assignment: A Launch Promotion Plan Built on Tasting
- MKT 205 Module 7 Final Project: The Applied Marketing Strategy Plan
- MKT 205 Module 8 Discussion: Twelve Weeks of Freezer Sales
- HRM 300 Module 6 Recognition Assignment: Thanks, Rest and Belonging
- ACC 315 Module 3 Internal Control Assignment: COSO Controls Over Wholesale Propane
- ACC 425 Module 4 Project One: An Interview Outline for a Corroborative Witness
- FIN 460 Module 4 Wills, Trusts and Incapacity Assignment: Documents for Two Spouses and a Son
MKT 205 Module 1 questions, answered
Where can I find a free MKT 205 Module 1 Discussion sample?
You can read the complete MKT 205 Module 1 post on this page, applying the four Ps to a family pierogi maker's pitch to a grocery chain.
What are the four Ps of the marketing mix?
Product, price, place and promotion: the main decisions a seller controls when bringing an offering to a market.
What are the limitations of the four Ps?
Critics argue the framework looks inward at what the seller controls and leaves out the customer relationship, personalization and service elements.
Which marketing mix element affects sales most?
In a study of 70 mature French brands, product and distribution had much larger long-run effects on sales than advertising or price discounts.
What is the difference between differentiation and segmentation?
Differentiation shapes the product so buyers see it as distinct from rivals; segmentation adjusts the offer to fit the needs of different groups of buyers.