| Course | MKT 455 Social Media Campaign |
|---|---|
| Module | Module 4 |
| Paper type | undergraduate discussion post on content virality, emotion and engagement |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 455 Module 4
Module Four Discussion
Will Anyone Share a Receipt? Emotion, Information and a Bike Share's Campaign
A Cedar Valley Bikes board member, seeing the personal ride receipts planned for the spring membership campaign, asked whether we could "make them go viral." It is a fair question, and the research suggests a careful answer.
Berger and Milkman (2012) tracked months of newspaper articles to see which ones readers forwarded by email. Positive pieces were passed on more often than negative ones, and pieces that left readers aroused, whether by awe, anger or anxiety, were passed on more often than pieces that left them quiet or sad. Tellis et al. (2019) found that information-focused video ads were shared less, except in risky contexts, that amusement, excitement, inspiration and warmth increased sharing and that prominent, early brand placement hurt it. A receipt is information with the brand at the top. Some riders may share a surprising total, but most will not.
That is acceptable. The receipt's job is to change one person's decision, and it does that in the rider's own inbox, where nobody else needs to see it. Asking it to spread as well would push us to make it louder and less personal, which would weaken the very thing that makes it work. A share button on the receipt costs nothing, so riders who want to post it can, but success should not depend on that.
Studying posts on the fan pages of brands in six product categories, one team of researchers reported that lively, interactive content collected more likes, while a question in the post was what brought in comments (de Vries et al., 2012). Our trail videos at sunset are vivid and stir something close to awe, so they are the content most likely to spread, especially if they show riders rather than the logo and end with an open question.
I would let receipts do their real job, converting riders by email, and build the shareable side of the campaign around trail moments and a question: "Where does your ride end?" Which of these would you actually share?
References
Berger, J., & Milkman, K. L. (2012). What makes online content viral? Journal of Marketing Research, 49(2), 192-205. https://doi.org/10.1509/jmr.10.0353
de Vries, L., Gensler, S., & Leeflang, P. S. H. (2012). Popularity of brand posts on brand fan pages: An investigation of the effects of social media marketing. Journal of Interactive Marketing, 26(2), 83-91. https://doi.org/10.1016/j.intmar.2012.01.003
Tellis, G. J., MacInnis, D. J., Tirunillai, S., & Zhang, Y. (2019). What drives virality (sharing) of online digital content? The critical role of information, emotion, and brand prominence. Journal of Marketing, 83(4), 1-20. https://doi.org/10.1177/0022242919841034
What the MKT 455 Module 4 instructions ask for
The Module 4 discussion in MKT 455 often asks what drives engagement or sharing on social media and how that should shape your campaign's content. A strong post applies research on emotion, information, format or brand presence to specific posts, not to social media in general. It recognizes that engagement takes different forms, likes, comments, shares and clicks, which respond to different features of content, and that not every post needs to be shared to be useful. The best posts make a recommendation about the writer's own campaign content and explain which goal each type of post serves. Explaining why some posts will not spread, and why that is fine, makes the argument more convincing.
How this MKT 455 Module 4 discussion example is built
In the sample, a Cedar Valley Bikes board member hopes the campaign's personal ride receipts will go viral. The post cites Berger and Milkman's finding that content evoking high-arousal emotions such as awe is shared more, Tellis and colleagues' evidence that informational video content and early, prominent branding reduce sharing while amusement, excitement, inspiration and warmth raise it and de Vries, Gensler and Leeflang's finding that vivid, interactive brand posts earn more likes and questions draw comments. It concludes that receipts should convert through email while trail content is built to spread, and asks which post classmates would share. It argues that the receipt works in a private inbox and does not need to be shared to succeed.
Where the MKT 455 Module 4 rubric puts the points
Engagement and virality discussions are usually assessed on understanding of what drives engagement, accurate use of research, application to specific campaign content, a clear recommendation and replies that add value. Strong posts distinguish forms of engagement, link content features to the right goal and adjust their own content accordingly. Posts lose credit for assuming any post can go viral with the right hashtag, for treating likes as the goal, for summarizing studies without applying them and for replies that only praise. Admitting which of your own posts will not spread, and why that is acceptable, shows clear thinking. Posts that separate content built to convert from content built to share show a mature view of engagement.
MKT 455 Module 4 help: the mistakes that cost points
Pick two or three posts from your campaign plan and ask what each is for: to be shared, liked, commented on or clicked. Compare their features with research on sharing and engagement, such as emotion, information content, vividness and how prominent the brand is. Decide which goal each post can realistically achieve, and adjust the content or the channel. Recommend a mix for the campaign. End by asking classmates which of your posts they would actually share with a friend, since an honest answer is a quick test of the research. Say plainly which posts are meant to persuade one person privately and which are meant to travel.
Get MKT 455 Module 4 written to your instructions
Paste the MKT 455 Module 4 prompt and a few posts from your campaign. We judge which are built to convert and which to spread, apply research on emotion and sharing and suggest changes, ending with a prompt for peers to try on their own feeds. The first post is free, with delivery in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 455 papers and related BS Marketing samples
- MKT 455 Module 1 Discussion: Campaign Versus Always-On Social Media
- MKT 455 Module 2 Audience Research Assignment: Audience Research and Social Listening
- MKT 455 Module 3 Milestone One: Campaign Brief
- MKT 455 Module 5 Milestone Two: Content Plan, Calendar and Creator Partners
- MKT 455 Module 6 Paid Social and Measurement Assignment: Paid Social Plan and Campaign Measurement
- MKT 455 Module 7 Final Project: Social Media Campaign Plan
- MKT 455 Module 8 Discussion: Reflecting on Campaign Results
- INT 315 Module 7 Final Project: The International Management Plan
- ACC 427 Module 7 Project Two: A Data-Driven Report on Voided Cash Tickets
- HRM 425 Module 7 Final Project: The Employee Life Cycle Plan
- FIN 336 Module 3 Currency Risk Assignment: Hedging a Receivable in Reais
MKT 455 Module 4 questions, answered
Where can I find a free MKT 455 Module 4 Discussion sample?
The full MKT 455 Module 4 post is here: whether a bike share's ride receipts will be shared, with research on emotion and engagement.
What makes online content go viral?
Research found content that evokes high-arousal emotions, such as awe, and positive content is more likely to be widely shared.
Does informational content get shared?
Studies of video ads found information-focused content is shared less than emotional content, except in risky decision contexts.
Does showing the brand early hurt sharing?
Research on video ads found that early, prominent or persistent brand placement reduced sharing.
What drives likes and comments on brand posts?
Vivid and interactive posts tend to attract more likes, and posts that ask a question tend to attract more comments.