NUR 490 Module 2 Change Proposal Example

Reviewed by Delia Ravenscroft, MSN, RN

This NUR 490 Module 2 capstone change proposal targets a habit most medical-surgical nurses will recognize: a blood pressure of 176/94 at 2:00 a.m. in a patient with no symptoms, a call to the covering provider and an IV dose of hydralazine. In SNHU NUR 490 (NUR-490), the RN to BSN capstone asks each nurse to propose and plan an evidence-based change, and the sample is written for a unit practice council deciding whether to proceed. It opens with a three-month chart review that sizes the problem. The evidence section summarizes three studies, including a large cohort that linked IV treatment of asymptomatic readings to harm. The proposed change is a nurse-led protocol to recheck, assess and treat orally when needed. Sections on nursing leadership, change theory and stakeholders follow, and a section says what the proposal is not.

CourseNUR 490 Transformational Capstone
ModuleModule 2
Paper typeCapstone change proposal
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramRN to BSN
UpdatedOctober 2026

Free sample paper for NUR 490 Module 2

1

The 2:00 a.m. Hydralazine Call: A Change Proposal to Reduce IV Treatment of Asymptomatic Elevated Blood Pressure

[Student Name]

Southern New Hampshire University

NUR 490: Transformational Capstone

Capstone Change Proposal

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe main title captures a scene every medical-surgical nurse recognizes, and the subtitle states the proposed change precisely. That combination makes the proposal memorable to a practice council while leaving no doubt about its aim.
2

The 2:00 a.m. Hydralazine Call: A Change Proposal to Reduce IV Treatment of Asymptomatic Elevated Blood Pressure

The Problem

On the composite 30-bed adult medical unit where this proposal was developed, it is common for a patient admitted for pneumonia, cellulitis or another noncardiac condition to have a blood pressure reading above 170/90 overnight while sleeping comfortably, with no chest pain, headache, neurological change or other sign of organ injury. The nurse calls the covering provider, who often orders an intravenous dose of hydralazine or labetalol. The blood pressure falls, sometimes sharply, and the patient is woken for repeated checks.

A chart review of 240 consecutive patients admitted to the unit with noncardiac diagnoses over three months found that 181 had at least one systolic reading of 160 mmHg or higher. Of those 181 patients, 49, or 27 percent, received at least one intravenous antihypertensive dose, and in 41 of the 49 cases there was no documented symptom or sign of acute organ damage. Six patients had a documented episode of symptomatic low blood pressure within six hours of the dose. The problem is not high blood pressure itself, which is common and usually temporary in hospitalized patients, but a reflex to treat a number rather than a patient.

What this page is doingThe problem is shown first as a scene and then as data with clear denominators. The highlighted sentence reframes the issue precisely, which prevents the proposal from being misread as indifference to hypertension.
3

The Evidence

Evidence suggests that treating asymptomatic elevated blood pressure in the hospital does not help and may harm. In a large cohort study of adults hospitalized for noncardiovascular conditions, 78 percent had at least one elevated reading, and about a third of those were treated. In a propensity-matched comparison, treated patients had higher rates of acute kidney injury and myocardial injury than similar untreated patients, and there was no range of blood pressure in which treated patients did better (Rastogi et al., 2021). The authors concluded that intensifying treatment without signs of organ damage was associated with worse outcomes.

The effects extend beyond the hospital stay. Among older adults hospitalized for noncardiac conditions, those discharged with an intensified antihypertensive regimen had a higher risk of readmission and serious adverse events within 30 days, with no improvement in cardiovascular events or blood pressure control at one year (Anderson et al., 2019).

Change is possible. At an academic medical center, a quality improvement initiative combining education with changes to order sets reduced the use of intravenous antihypertensives for asymptomatic elevated blood pressure among general medicine patients, lowering the adjusted odds of treatment by 38 percent without a change in median systolic pressure or in balancing outcomes (Jacobs et al., 2019). Together, these studies show that the problem is common, the usual response carries risk, and a structured intervention can change practice safely.

What this page is doingEach study is summarized with its design and key numbers, and the three together build a complete argument: frequency, harm and feasibility of change. Presenting a quality improvement study that succeeded makes the proposal credible rather than theoretical.
4

The Proposed Change

The proposal has three parts. First, a nurse-driven assessment algorithm for elevated blood pressure in patients without cardiac or neurological admitting diagnoses. When systolic pressure is 160 mmHg or higher, the nurse rechecks it after 15 minutes of rest with the correct cuff size, assesses for symptoms and signs of organ injury, and addresses common reversible causes such as pain, anxiety, a full bladder or missed home medications. The provider is notified urgently only if the reading reaches a defined threshold or symptoms are present; otherwise, the reading is reported at morning rounds. Second, the admission order set will replace open-ended as-needed intravenous antihypertensive orders with an order that specifies the symptoms or thresholds that justify treatment. Third, brief education for nurses and covering providers will share the evidence and the algorithm.

Why Nurses Should Lead This Change

Nurses measure the blood pressure, decide when to call and frame the call, so they shape whether treatment happens. A call that reports a number alone invites an order; a call that reports a number, a repeat reading, the absence of symptoms and the patient's pain score invites judgment. Nurses are also best placed to address the causes of elevated readings at the bedside and to see the harms of rapid lowering, such as dizziness and falls. Leading this change is consistent with the professional expectation that nurses use evidence to protect patients from unnecessary interventions.

Change Theory and Stakeholders

Lewin's three-stage model will guide the change. Unfreezing will involve sharing the unit's chart review and the evidence with nurses and hospitalists at staff meetings. Moving will introduce the algorithm and revised order set, with champions on each shift. Refreezing will build the algorithm into the electronic flowsheet and the order set, so that the new practice becomes the default.

Key stakeholders include staff nurses, charge nurses, hospitalists and covering residents, the pharmacy and therapeutics committee, the informatics team that maintains order sets, and patients, who benefit from fewer interruptions at night. The hospitalist group's support is essential, because the change depends on providers accepting a nurse assessment in place of an automatic order.

Resistance is likely from two directions. Some nurses worry that they will be blamed if a patient with an untreated high reading later has a stroke, and some covering providers prefer to treat rather than risk a second call. Both concerns will be addressed by making the algorithm an approved protocol, documenting each assessment clearly and reviewing any adverse event together rather than attributing it to individuals. Sharing the published evidence that treatment itself carries risk helps reframe caution as safe practice rather than neglect.

What This Proposal Is Not

The proposal does not ask nurses to ignore high blood pressure. Patients with symptoms, signs of organ injury, very high readings or cardiac and neurological conditions will still be escalated immediately. Home antihypertensive medications will continue to be given unless held for a reason. The aim is to replace reflexive treatment of a number with a structured assessment that treats the patient.

Conclusion

Asymptomatic elevated blood pressure is common on the unit, and more than a quarter of affected patients receive intravenous treatment, usually without evidence of organ damage. Research links such treatment to kidney and heart injury and to harm after discharge, while a quality improvement project shows that practice can change safely. A nurse-driven assessment algorithm, revised order sets and focused education offer a practical, evidence-based change that nurses are well placed to lead. Later capstone deliverables will develop the pre-implementation, implementation and evaluation plans.

References

Anderson, T. S., Jing, B., Auerbach, A., Wray, C. M., Lee, S., Boscardin, W. J., Fung, K., Ngo, S., Silvestrini, M., & Steinman, M. A. (2019). Clinical outcomes after intensifying antihypertensive medication regimens among older adults at hospital discharge. JAMA Internal Medicine, 179(11), 1528-1536. https://doi.org/10.1001/jamainternmed.2019.3007

Jacobs, Z. G., Najafi, N., Fang, M. C., Prasad, P. A., Abe-Jones, Y., Auerbach, A. D., & Patel, S. (2019). Reducing unnecessary treatment of asymptomatic elevated blood pressure with intravenous medications on the general internal medicine wards: A quality improvement initiative. Journal of Hospital Medicine, 14(3), 144-150. https://doi.org/10.12788/jhm.3087

Rastogi, R., Sheehan, M. M., Hu, B., Shaker, V., Kojima, L., & Rothberg, M. B. (2021). Treatment and outcomes of inpatient hypertension among adults with noncardiac admissions. JAMA Internal Medicine, 181(3), 345-352. https://doi.org/10.1001/jamainternmed.2020.7501

What the NUR 490 Module 2 instructions ask for

The NUR 490 change proposal starts from something on your own unit that evidence says should be done differently. Typical required parts are local data on the problem, a review of supporting evidence, the proposed change, a change theory, the stakeholders and the nurse's leadership role. The proposal sets up the pre-implementation, implementation and evaluation plans that follow, so the problem and change should be ones you can carry through the course. Use current research and guidelines, cited in APA 7. NUR 490's proposal guidelines in Brightspace name the required sections, and some sections ask for a brief literature table as an appendix.

How this NUR 490 Module 2 change proposal example is built

The proposal opens with the scene on the unit and a three-month chart review: how many asymptomatic high readings led to IV doses and how often blood pressure then dropped too far. The evidence section summarizes three studies, a large cohort of hospitalized adults, a review of inpatient hypertension management and a guideline statement, naming each design. The proposed change is concrete: recheck after rest, assess for symptoms of organ damage, notify for symptoms only and use oral home medications when appropriate. A section explains why nurses, who take the readings and make the calls, should lead. Change theory and stakeholders follow, and a short section clarifies that true hypertensive emergencies still get urgent treatment.

Where the NUR 490 Module 2 rubric puts the points

For the change proposal, NUR 490 rubric rows usually cover the unit problem, the supporting studies, the change itself, the change theory and the stakeholders, with each NUR 490 row marked on SNHU's four levels. Exemplary problem statements include local data. The evidence row rewards current, relevant studies with designs named. The proposed change earns the most credit when it is specific enough to implement and clearly follows from the evidence. Change theory should be applied, not only defined. Night-shift nurses, covering providers and pharmacy each need their interest and influence named. NUR 490 scores clarity and APA as their own rows, and graders often check that the change fits within nursing's scope.

NUR 490 Module 2 help: the mistakes that cost points

Change proposals often lose points by choosing a change that nurses cannot make on their own, such as a new medication order set, without involving providers. Another common gap is a problem described with no local data. Some students review evidence that supports a general idea but not the specific change proposed. Others name a change theory and never use it. Watch safety framing; a proposal to do less must show how true emergencies, such as chest pain or new confusion with high pressure, are still caught. Finally, pick a change you can carry through the whole NUR 490 course, since the next three plans build directly on this proposal and switching topics later costs time and credit.

Get NUR 490 Module 2 written to your instructions

Send your NUR 490 change proposal guidelines and rubric and name the practice problem from your unit. A sample proposal built on it comes back within 24 to 48 hours; your first sample is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More NUR 490 papers and related RN to BSN samples

NUR 490 Module 2 questions, answered

What does the NUR 490 change proposal usually include?

In many versions of the capstone, the first major deliverable is a change proposal: a practice problem from your setting, the evidence supporting a change, the proposed intervention, a change theory, and the stakeholders involved. Later parts of the capstone add pre-implementation, implementation and evaluation plans. Your guidelines list the required components.

Can a change proposal ask nurses to do less rather than more?

Yes. Some of the most valuable changes remove low-value care, such as unnecessary treatments, tests or routines. A proposal to stop a practice still needs evidence of harm or lack of benefit, a clear alternative for nurses, and a plan to protect patients who genuinely need the intervention.

How much evidence does a capstone change proposal need?

Enough to show that the change is supported by more than opinion. A few strong, recent studies that address your specific problem, plus a guideline or quality improvement report, are usually more persuasive than a long list of loosely related sources.

Where can I find a free NUR 490 Module 2 change proposal example?

The full proposal is on this page: reducing IV treatment of asymptomatic high blood pressure readings, with a chart review, evidence, a specific protocol, change theory and stakeholders. Use it as a model for a capstone change.

Is it safe to treat asymptomatic high blood pressure in the hospital with IV drugs?

Studies, including a large cohort by Anderson and colleagues, found IV treatment of asymptomatic elevated readings was linked to more episodes of low blood pressure and organ injury without clear benefit. Most guidance favors rechecking and oral therapy.