NUR 555 Module 9 Final Project Example

Reviewed by Delia Ravenscroft, MSN, RN

This NUR 555 Module 9 Final Project sample brings a term of paired comparisons together in one complex case where several conditions must be told apart. It meets the final project in SNHU NUR 555, Advanced Clinical Pathophysiology, the MSN course carried in SNHU's catalog as NUR-555. The composite patient is a 26-year-old woman with three months of fatigue, swollen hand joints, a sun-triggered rash across her cheeks, painless mouth ulcers and low-grade fevers. The paper sets out the case and a ranked differential of systemic lupus erythematosus, rheumatoid arthritis, parvovirus B19 infection and drug-induced lupus. It explains the immunology of lupus, from impaired clearance of dying cells and interferon signaling to immune complexes that consume complement, and shows how each laboratory result supports lupus or argues against a mimic. It applies the 2019 EULAR/ACR classification criteria, then closes with the monitoring the diagnosis demands.

CourseNUR 555 Advanced Clinical Pathophysiology
ModuleModule 9
Paper typeComplex case with differential and immunologic analysis (final project)
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMSN
UpdatedOctober 2026

Free sample paper for NUR 555 Module 9

1

Final Project: Joints, Rash and Fatigue in a 26-Year-Old, Separating Systemic Lupus Erythematosus From Its Mimics

[Student Name]

Southern New Hampshire University

NUR 555: Advanced Clinical Pathophysiology

Final Project

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe title lists the presenting features and names the task, separation from mimics, which is the core skill the course has built.
2

Final Project: Joints, Rash and Fatigue in a 26-Year-Old, Separating Systemic Lupus Erythematosus From Its Mimics

Systemic lupus erythematosus is sometimes called a great imitator, because its early features overlap with several other conditions. This final project applies the discrimination practiced across the course to one composite patient whose joints, skin, mouth and energy are all affected. It presents the case, builds a ranked differential, explains the immunology of lupus and tests each alternative against the findings. The analysis concludes that lupus is by far the best explanation, because the combination of a photosensitive malar rash, nonerosive arthritis, leukopenia, anti-double-stranded DNA antibodies and low complement reflects immune complex disease driven by loss of tolerance to nuclear antigens, a pattern that rheumatoid arthritis, parvovirus infection and drug-induced lupus each fail to reproduce in full.

What this page is doingThe introduction frames the diagnostic challenge, outlines the project's structure and states a conclusion grounded in the mechanism.
3

The Case

The patient, a 26-year-old woman who works as a preschool teacher, has had three months of fatigue and pain with swelling in the knuckles and wrists of both hands, worse in the morning. After a weekend outdoors, a flat red rash spread over both cheeks and the nasal bridge, leaving the folds running from nose to mouth clear. She has painless ulcers on the roof of her mouth and evening temperatures up to 38.3°C. She takes no regular medicines. Examination confirms swelling of several knuckles and both wrists and the facial rash.

Laboratory results: white cell count 3,200/mm³, hemoglobin 11.4 g/dL, platelets 140,000/mm³; antinuclear antibody (ANA) positive at 1:640; anti-double-stranded DNA (anti-dsDNA) antibodies positive; C3 and C4 both low; rheumatoid factor weakly positive, anti-CCP negative; urine protein-to-creatinine ratio 0.3 g/g; C-reactive protein mildly raised. Hand x-rays show soft tissue swelling without erosions. Parvovirus B19 IgM is negative.

What this page is doingThe case gives every finding the differential will need, including negatives that will rule alternatives out.
4

The Differential

Four diagnoses fit parts of the picture. Systemic lupus erythematosus fits the multisystem pattern. Rheumatoid arthritis fits the symmetric small-joint arthritis and morning stiffness. Parvovirus B19 infection fits a young adult who works with small children and has acute symmetric arthritis and sometimes a rash and transient autoantibodies (Kerr, 2016). Drug-induced lupus fits lupus-like features after exposure to certain medicines. The task is to decide which explains all the findings and which explain only some.

What this page is doingStating the differential with the reason each diagnosis is considered sets up a structured comparison rather than a single-diagnosis narrative.
5

The Immunology of Lupus

Lupus begins with loss of tolerance to the cell's own nuclear material. Impaired clearance of cells that die by apoptosis leaves nuclear antigens such as DNA and histones exposed; plasmacytoid dendritic cells sense these complexes and produce type I interferons, which activate other immune cells and sustain autoreactive B cells. The B cells produce antibodies against nuclear antigens, including anti-dsDNA, which form immune complexes with their targets (Kiriakidou & Ching, 2020). Deposited in tissues, these complexes activate complement and recruit inflammatory cells, a type III hypersensitivity process.

Each finding follows. Ultraviolet light increases apoptosis of skin cells, releasing nuclear antigens where complexes form, which explains why the malar rash appeared after sun exposure. Immune complex inflammation in the synovium causes arthritis, typically without erosions. Complement consumed in forming and clearing complexes explains the low C3 and C4, and antibodies against white cells, together with interferon effects, explain the leukopenia. Fever and fatigue reflect systemic inflammation driven by interferons and other cytokines.

What this page is doingThe lupus mechanism is explained from loss of tolerance to type III injury, and each clinical and laboratory finding is traced to a specific step.
6

Testing the Mimics

Rheumatoid arthritis explains the arthritis and even the weakly positive rheumatoid factor, which occurs in some people with lupus. But it does not explain the photosensitive malar rash, oral ulcers, leukopenia, anti-dsDNA or low complement. Anti-CCP, highly specific for rheumatoid arthritis, is negative, and there are no erosions after three months (Smolen et al., 2016). Rheumatoid arthritis is unlikely.

Parvovirus B19 infection can cause acute symmetric arthritis in adults, particularly in those exposed to young children, and it can transiently produce autoantibodies and low complement, mimicking lupus (Kerr, 2016). Her occupation makes this a genuine concern. But her negative parvovirus IgM argues against recent infection, and the three-month course, anti-dsDNA and mucocutaneous features favor lupus. Drug-induced lupus usually follows months of exposure to medicines such as hydralazine or procainamide, commonly lacks anti-dsDNA and rarely lowers complement; she takes no medicines, so it can be set aside.

What this page is doingEach mimic is tested against specific findings, listing the findings each one accounts for and the ones it leaves unexplained, the discrimination at the heart of the course.
7

Applying the Classification Criteria

The 2019 EULAR/ACR criteria require a positive ANA at 1:80 or higher as an entry criterion, then add weighted points from clinical and immunologic domains, counting only the highest-weighted item in each domain; a total of 10 or more classifies lupus (Aringer et al., 2019). Table 1 applies them to this patient.

Table 1

2019 EULAR/ACR Classification Criteria Applied to the Case

DomainFindingPoints
Entry criterionANA 1:640Met
ConstitutionalFever2
HematologicLeukopenia (3,200/mm³)3
MucocutaneousAcute cutaneous lupus (malar rash); oral ulcers counted within the same domain6
MusculoskeletalJoint involvement6
ComplementLow C3 and low C44
Lupus-specific antibodiesAnti-dsDNA6
Total27

Note. Only the highest-weighted criterion in each domain is counted. Composite case.

What this page is doingApplying the current criteria with the entry requirement and domain rule shown demonstrates precision and confirms the clinical reasoning.
8

Her total of 27 far exceeds the threshold. Classification criteria are designed for research and are not a substitute for clinical judgment, but here they agree with the analysis: every domain points in the same direction, and no competing diagnosis accounts for the full pattern.

What this page is doingThe paper notes the purpose and limits of classification criteria while showing that they support the clinical conclusion.
9

What the Diagnosis Demands

Lupus can affect the kidneys silently, so her urine protein-to-creatinine ratio of 0.3 g/g, below the level counted in the criteria, still needs repeat testing along with blood pressure and urine sediment, since lupus nephritis often begins without symptoms. Hydroxychloroquine is recommended for most people with lupus because it reduces flares and improves long-term outcomes, and baseline and periodic eye examinations are needed while taking it (Kiriakidou & Ching, 2020). She should use sun protection, since ultraviolet light triggered her rash, and her antiphospholipid antibody status should be checked because it affects clotting and pregnancy risk. Referral to rheumatology is appropriate for confirmation and ongoing care.

What this page is doingThe management section focuses on monitoring driven by the mechanism, especially silent organ involvement, rather than restating general treatment.
10

Conclusion

This patient's joints, skin, mouth, blood and complement all tell the same immunologic story: loss of tolerance to nuclear antigens, interferon-driven autoimmunity and immune complexes that consume complement and inflame tissues. Rheumatoid arthritis explains the joints but not the rest, parvovirus infection could mimic the picture but is unsupported by serology and course, and drug-induced lupus lacks a drug. The 2019 criteria confirm what the mechanism predicts. The course's central skill, asking what each finding means for each possibility, turned a list of symptoms into a diagnosis.

What this page is doingThe conclusion summarizes the mechanism, dismisses each mimic in a clause and ties the result back to the course's central skill.
11

References

Aringer, M., Costenbader, K., Daikh, D., Brinks, R., Mosca, M., Ramsey-Goldman, R., Smolen, J. S., Wofsy, D., Boumpas, D. T., Kamen, D. L., Jayne, D., Cervera, R., Costedoat-Chalumeau, N., Diamond, B., Gladman, D. D., Hahn, B., Hiepe, F., Jacobsen, S., Khanna, D., . . . Johnson, S. R. (2019). 2019 European League Against Rheumatism/American College of Rheumatology classification criteria for systemic lupus erythematosus. Arthritis & Rheumatology, 71(9), 1400-1412. https://doi.org/10.1002/art.40930

Kerr, J. R. (2016). The role of parvovirus B19 in the pathogenesis of autoimmunity and autoimmune disease. Journal of Clinical Pathology, 69(4), 279-291. https://doi.org/10.1136/jclinpath-2015-203455

Kiriakidou, M., & Ching, C. L. (2020). Systemic lupus erythematosus. Annals of Internal Medicine, 172(11), ITC81-ITC96. https://doi.org/10.7326/AITC202006020

Smolen, J. S., Aletaha, D., & McInnes, I. B. (2016). Rheumatoid arthritis. The Lancet, 388(10055), 2023-2038. https://doi.org/10.1016/S0140-6736(16)30173-8

What the NUR 555 Module 9 instructions ask for

The NUR 555 final project usually asks you to analyze a complex case in depth, drawing together the immunology and pathobiology covered in the course. Typical requirements include a case summary, a ranked differential diagnosis, the mechanism of the leading diagnosis at the cellular and molecular level, an explanation of how each finding supports or argues against each possibility, the use of diagnostic or classification criteria and the implications for monitoring and management. Six to ten pages in APA 7 is a common range for this submission. Build your differential from the findings rather than from a list of diseases you know, and make sure every positive and negative result is used somewhere in the argument.

How this NUR 555 Module 9 final project example is built

The sample works through a composite 26-year-old woman with arthritis, a photosensitive malar rash, oral ulcers, fever, leukopenia, anti-dsDNA and low complement. It builds a differential of lupus, rheumatoid arthritis, parvovirus B19 infection and drug-induced lupus, explains the immunology of lupus from impaired clearance of dying cells and interferon signaling to immune complex injury, and traces each finding to a step. Each mimic is tested against the findings it explains and those it cannot. The 2019 EULAR/ACR criteria are applied in a table, with the entry criterion and domain rule shown. Monitoring for silent kidney involvement closes the project, supported by four real sources. Negative results, such as the parvovirus serology and anti-CCP, are used as actively as positive ones.

Where the NUR 555 Module 9 rubric puts the points

Final project rubrics in this course generally assess the quality of the differential, the depth and accuracy of mechanisms, the correlation of findings with each possibility, the use of criteria and tests, the management and monitoring plan and writing. The differential is judged by whether alternatives are genuinely tested against the evidence, including negative results, rather than listed and dismissed. Mechanism credit goes to papers that name the cells, antibodies and pathways involved. Applying classification criteria correctly, including entry requirements and domain rules, demonstrates precision, while the management section should reflect the specific risks the diagnosis carries rather than generic advice. Graders also notice when a paper acknowledges the limits of classification criteria in clinical practice.

NUR 555 Module 9 help: the mistakes that cost points

Final case analyses often go wrong by naming the diagnosis early and ignoring alternatives, by listing laboratory results without interpreting them or by applying criteria incorrectly, for example adding every item in a domain. Others forget the negative findings that exclude mimics. Build a ranked differential, test each alternative against every finding, explain the leading diagnosis at the cellular level, apply criteria with the rules shown and end with monitoring driven by the disease's risks. Keep the case details consistent across sections. For a different final case, the full analysis can be built around your own patient and the course's requirements. A short table of each diagnosis against the key findings can make the differential easy to follow.

Get NUR 555 Module 9 written to your instructions

Send your final project case, the guidelines and the rubric. A complete case analysis with a tested differential, cellular mechanisms, applied criteria and a monitoring plan is ready in 24 to 48 hours, and the first one is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More NUR 555 papers and related MSN samples

NUR 555 Module 9 questions, answered

Where can I find a free NUR 555 Module 9 Final Project sample?

The complete project on this page is free to read: a composite 26-year-old with suspected lupus, a ranked differential, the immunology of lupus, each mimic tested, the 2019 criteria applied and a monitoring plan.

Why is complement low in active lupus?

Immune complexes formed by autoantibodies and nuclear antigens activate and consume complement, lowering C3 and C4.

How do the 2019 EULAR/ACR lupus criteria work?

A positive ANA of at least 1:80 is required, then weighted points are added from clinical and immunologic domains, counting only the highest item per domain; 10 or more classifies lupus.

Can parvovirus B19 mimic lupus?

Yes. In adults it can cause acute symmetric arthritis, rash and transient autoantibodies, so recent infection should be considered, especially in people exposed to young children.

Why does sun exposure trigger a lupus rash?

Ultraviolet light increases death of skin cells, exposing nuclear antigens that fuel local immune complex formation and inflammation.