| Course | NUR 634 Facilitating Learning and Teaching Innovation in Nursing Education |
|---|---|
| Module | Module 7 |
| Paper type | Milestone: evaluation plan for a teaching innovation |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MSN |
| Updated | September 2026 |
Free sample paper for NUR 634 Module 7
Milestone Three: A Four-Level Evaluation Plan for the Flipped Heart Failure Session
[Student Name]
Southern New Hampshire University
NUR 634: Facilitating Learning and Teaching Innovation in Nursing Education
Milestone Three
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Milestone Three: A Four-Level Evaluation Plan for the Flipped Heart Failure Session
Teaching innovations are often judged by how students feel about them. A session students enjoy may not improve learning, and a session they find difficult may improve it considerably. An evaluation plan needs to measure more than satisfaction and to be honest about what its design can show. This milestone plans the evaluation of the flipped heart failure session at Riverbend Community College. It argues that measuring reaction, learning, clinical behavior and results, comparing with earlier cohorts and naming the threats to validity will give the curriculum committee a sound basis for deciding the innovation's future.
Choosing an Evaluation Model
A guide to program evaluation in health professions education describes several models, including experimental and quasi-experimental designs, the Kirkpatrick levels, logic models and the CIPP model of context, input, process and product, and it emphasizes choosing a model that fits the questions stakeholders need answered and the resources available (Frye & Hemmer, 2012). The curriculum committee's questions are practical: did students learn more, did they apply it in clinical and was the effort worthwhile? Kirkpatrick's four levels fit those questions well. They move from reaction, how participants respond, to learning, what knowledge or skill they gain, to behavior, whether they apply it, to results, the broader outcomes that follow (Kirkpatrick & Kirkpatrick, 2006). The model is widely used and easy to explain, although critics note that it assumes each level causes the next, which is not always true.
Level 1: Reaction
Immediately after the session, students will complete a six-item survey on whether the pre-class materials were clear and manageable in length, whether the case helped them understand heart failure, how confident they feel caring for a patient with heart failure and what should change. Two open questions will capture comments. Reaction data matter because the nursing review of flipped classrooms found that satisfaction was mixed and that engagement improved when students understood the purpose of the model; low reaction scores could signal a problem with explanation or workload that the design can fix. Reaction alone will not be treated as evidence of learning.
Level 2: Learning
Learning will be measured with the heart failure unit exam, which has been used with only minor changes for three years. The primary comparison is the average score on the eight application items, which averaged 61% across the previous three cohorts, against the pilot cohort, with a target of at least 70%. Item analysis will check the quality of those items. The difficulty index, the proportion of students answering correctly, should fall between roughly 30% and 80% for useful items. The discrimination index, which compares how well high-scoring and low-scoring students do on an item, should be positive and preferably above 0.2; an item that low scorers answer correctly as often as high scorers tells faculty little. Items with poor discrimination will be reviewed before results are interpreted, so that a weak item does not mask real learning or create a false gain.
Level 3: Behavior
The innovation's purpose is to change what students do in clinical, not only on exams. Clinical faculty will rate each student with the Lasater clinical judgment rubric on the clinical day following the session, focusing on focused observation, recognizing deviations from expected patterns and prioritizing data, the dimensions most related to the session's objectives. Because the rubric grew out of Tanner's model, its four-step scale gives faculty a common yardstick for these behaviors (Lasater, 2007). Before rating, faculty will rate two recorded student simulations together to calibrate their use of the rubric. The comparison will be with ratings from the previous cohort, collected in the same week with the same rubric, and with the target that at least half of students reach the developing level or above on all three dimensions.
Level 4: Results
Results are the hardest level to attribute to a single session. The plan will track two indicators with appropriate caution: the course pass rate and, later, performance on the heart failure content area of the program's standardized end-of-program examination. Neither can be credited to one session, since many factors affect them, but a consistent pattern across levels would strengthen the case that the innovation contributes. Faculty time will also be recorded, including the 30 hours spent preparing materials, so the committee can weigh benefit against cost. Because materials are reusable, the preparation cost falls sharply in later terms, and the plan will estimate the per-term cost after the first year so that the committee is not comparing a one-time investment against a recurring benefit.
Threats to Validity
Several factors could make the pilot look better or worse than it is. The pilot cohort may differ from earlier cohorts in ability, so admission averages and first-semester grades will be compared. Faculty enthusiasm for a new approach can raise results through extra attention, a form of novelty effect. The exam items were familiar to faculty, who might unintentionally teach to them; to limit this, the case writers did not see the exam items. Students may share information about the case with later sections, though this pilot has one section. Finally, one term is a small sample, so the committee should treat results as a signal for continued testing rather than proof. Where possible, the pilot will be repeated the following term to see whether any gain holds.
Decision Rule
The committee will continue and extend the flipped approach to a second topic if the application item average reaches at least 70%, the rubric target is met and reaction scores do not show serious workload problems. If learning improves but reaction is poor, the design will be revised before extension. If neither learning nor behavior improves, the session will return to its previous format, with the lessons documented.
Conclusion
Evaluating the flipped session at four levels, against a historical baseline, with quality-checked exam items, calibrated clinical ratings and honest attention to threats, will tell Riverbend whether the innovation improves what students know and do. The final project will bring the proposal, design and evaluation together.
References
Frye, A. W., & Hemmer, P. A. (2012). Program evaluation models and related theories: AMEE Guide No. 67. Medical Teacher, 34(5), e288-e299. https://doi.org/10.3109/0142159X.2012.668637
Kirkpatrick, D. L., & Kirkpatrick, J. D. (2006). Evaluating training programs: The four levels (3rd ed.). Berrett-Koehler.
Lasater, K. (2007). Clinical judgment development: Using simulation to create an assessment rubric. Journal of Nursing Education, 46(11), 496-503. https://doi.org/10.3928/01484834-20071101-04
What the NUR 634 Module 7 instructions ask for
Milestone Three in NUR 634 generally asks you to plan how you will evaluate your teaching innovation: the evaluation model, the measures at each level, data sources, comparison groups or baselines, analysis and how findings will be used. Some prompts ask specifically about test item analysis or clinical evaluation tools. Expect three to five pages in APA 7. Choose a model that fits the questions decision-makers will ask, measure learning and behavior as well as reaction, use historical or concurrent comparisons, check the quality of your instruments, name the threats that could distort results and state in advance how the findings will guide a decision, because evaluation plans are graded on rigor and usefulness. Name who collects each measure.
How this NUR 634 Module 7 milestone three example is built
This sample plans the evaluation of a composite flipped heart failure session using Kirkpatrick's four levels, justified with the Frye and Hemmer guide to evaluation models and a note on the model's causal assumption. Reaction is a six-item survey interpreted cautiously. Learning compares application items with a three-cohort baseline of 61% against a 70% target, with difficulty and discrimination indices explained and used to screen weak items. Behavior uses calibrated Lasater ratings on three dimensions. Results track course and end-of-program indicators with caution about attribution and record faculty time. Threats to validity are named with mitigations, and a decision rule links findings to curriculum action for the committee.
Where the NUR 634 Module 7 rubric puts the points
Evaluation plan rubrics in this course typically weigh the choice and justification of an evaluation model, appropriate measures at multiple levels, valid and reliable instruments, comparison or baseline, analysis, attention to threats to validity and plans for using results, along with APA 7 writing. The strongest plans measure learning and clinical behavior rather than satisfaction alone, explain item analysis correctly and calibrate raters. Graders reward honest treatment of attribution at the results level and specific strategies for limiting bias. A decision rule stated before data are collected shows that the evaluation is designed to inform action and earns credit for the use of findings.
NUR 634 Module 7 help: the mistakes that cost points
Evaluation plans lose points when they rely only on student satisfaction, lack a baseline or comparison, use exams without checking item quality, ignore rater consistency or claim that one session caused changes in licensure outcomes. Another common gap is failing to say how results will be used. Pick a model that fits the decision, measure at least learning and behavior, use a historical baseline, check difficulty and discrimination, calibrate raters, name threats with mitigations and set a decision rule. If your innovation is a simulation, a clinical teaching change or a full course redesign, include your design and the milestone instructions, and the plan will be fitted to that innovation.
Get NUR 634 Module 7 written to your instructions
Send the milestone instructions, your innovation's design, whatever earlier results you hold and the rubric. The plan we return will measure more than satisfaction, use a baseline, check instrument quality, address threats to validity and end with a decision rule, within 24 to 48 hours and free the first time. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More NUR 634 papers and related MSN samples
- NUR 634 Module 1 Discussion: Why the Lecture Persists
- NUR 634 Module 2 Theory Application Paper: Tanner's Model in a First Med-Surg Course
- NUR 634 Module 3 Milestone One: Proposal: A Flipped Heart Failure Session
- NUR 634 Module 4 Simulation Design: A Heart Failure Scenario With Debriefing
- NUR 634 Module 5 Milestone Two: Building the Flipped Heart Failure Session
- NUR 634 Module 6 Clinical Teaching Analysis: Clinical Judgment at the Bedside
- NUR 520 Module 8 Screening Paper: Screening Accuracy and the Case Against COPD Screening
- NUR 557 Module 2 Case Paper: Hypertension, a Thiazide and an ACE Inhibitor in a 68-Year-Old
- NUR 545 Module 9 Final Project: A Complete Assessment and Health Literacy-Informed Teaching Plan
- NUR 540 Module 5 Short Paper: An Asthma Exacerbation in a School-Age Child
NUR 634 Module 7 questions, answered
Where can I find a free NUR 634 Module 7 Milestone Three sample?
A complete evaluation plan is published on this page: a flipped heart failure session evaluated at Kirkpatrick's four levels, with item analysis, calibrated rubric ratings, threats to validity and a decision rule.
What are Kirkpatrick's four levels of evaluation?
Reaction, how participants respond; learning, what they gain; behavior, whether they apply it; and results, the broader outcomes that follow.
What are item difficulty and discrimination indices?
Difficulty is the proportion of students who answer an item correctly. Discrimination compares high and low scorers' performance on the item; positive values show the item separates stronger from weaker students.
Why is student satisfaction not enough to evaluate teaching?
Students may enjoy a session without learning more, or find a demanding method uncomfortable while learning a great deal, so learning and behavior must also be measured.
What threats can bias the evaluation of a teaching innovation?
Differences between cohorts, faculty enthusiasm or novelty effects, teaching to known test items and small samples, each of which can make results look better or worse than they are.