NUR 675 Module 2 Objectives Paper Example

Reviewed by Delia Ravenscroft, MSN, RN

This NUR 675 Module 2 Objectives Paper sample shows the difference between objectives that describe a busy practicum and objectives that show learning. It is written for SNHU NUR 675 (NUR-675), the MSN seminar that prepares students for the practicum. The composite student, a charge nurse planning a quality and leadership practicum on inpatient falls, wrote first-draft objectives such as attend the falls committee and learn about quality improvement. Her preceptor pointed out that none could be judged as met or not met. The paper applies SMART criteria, with Bjerke and Renger's warning against writing them mechanically, and uses Krathwohl's revision of Bloom's taxonomy to set objectives at the analyzing, evaluating and creating levels expected of graduate students. It maps each objective to an advanced-level domain of the 2021 AACN Essentials. A table sets each weak objective beside its revision and the evidence the preceptor will review.

CourseNUR 675 MSN Seminar: Preparation for Practicum
ModuleModule 2
Paper typepaper on writing measurable advanced-level practicum objectives
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMSN
UpdatedOctober 2026

Free sample paper for NUR 675 Module 2

1

Writing Practicum Objectives a Preceptor Can Assess: From Activities to Advanced-Level Outcomes

[Student Name]

Southern New Hampshire University

NUR 675: MSN Seminar: Preparation for Practicum

Module Two Objectives Paper

[Instructor Name]

[Date]

What this page is doingThe subtitle names the shift the paper teaches, from listing activities to stating outcomes at the graduate level.
2

Writing Practicum Objectives a Preceptor Can Assess: From Activities to Advanced-Level Outcomes

Practicum objectives do more than satisfy a form. They tell the student what to aim for, tell the preceptor what to observe and give faculty a basis for judging whether the practicum achieved its purpose. Many first drafts fail on all three counts because they describe activities rather than outcomes. The student in this paper, a medical-surgical charge nurse at a composite hospital preparing a quality and leadership practicum focused on inpatient falls, wrote five first-draft objectives, including attend the unit falls committee, learn about quality improvement and shadow the nurse manager. When she shared them with her prospective preceptor, the quality director, he asked a simple question: at the end of the practicum, how would either of us know whether you had met them? This paper rewrites the objectives. It argues that objectives written to be specific and measurable, at the cognitive level expected of graduate students and aligned with advanced competencies, turn the practicum into a demonstration of learning.

What this page is doingThe introduction explains the purposes of objectives and presents the student's first drafts and the preceptor's challenge.
3

Criteria for a Good Objective

The SMART acronym, first proposed for management objectives in the early 1980s, asks for objectives that are specific and measurable, have an owner or are attainable, stay realistic and carry a deadline, and it has since been adapted widely in health care and education. Bjerke and Renger (2017) cautioned that SMART objectives are often written mechanically, meeting the letters of the acronym while missing the point, and argued that objectives should grow from a clear understanding of the problem and its causes, so that achieving them actually moves the work forward. For practicum objectives, the most important criteria are specificity and measurability, tied to the problem the practicum addresses. An objective that begins with learn about or understand meets neither criterion, because learning and understanding cannot be observed directly. An objective that names a product or a performance, such as a completed analysis or a presentation to a committee, can be judged by the preceptor.

What this page is doingDoran's criteria are explained, with emphasis on specificity and measurability for practicum objectives.
4

Setting the Right Level

Measurable objectives can still be pitched too low. Krathwohl (2002) summarized the revised version of Bloom's framework, which orders six thinking processes from simple recall up through application and analysis to judgment and invention, and in which the process is separated from the kind of knowledge involved. Entry-level practice often requires applying known procedures. Graduate practicum objectives should emphasize the higher processes: analyzing a problem with data, evaluating evidence and options and creating a plan, tool or intervention. Choosing verbs from these levels, such as analyze, compare, evaluate, design and develop, signals the depth expected and shapes what the student will actually do.

The objectives must also align with the competencies the program is responsible for. The 2021 AACN Essentials describe advanced-level sub-competencies for graduate education in domains such as informatics and interprofessional partnership as well as quality and safety (American Association of Colleges of Nursing, 2021). Mapping each objective to a domain helps ensure that the practicum builds the competencies the degree claims.

What this page is doingThe revised taxonomy sets the cognitive level, and the Essentials provide the competency frame for alignment.
5

Rewriting the Objectives

Table 1 shows each first draft beside its revision. The revisions share features. Each begins with a verb from the higher levels of the taxonomy. Each names a product or performance the preceptor can review, such as an analysis, a recommendation paper or a presentation. Each includes a deadline within the practicum and is realistic within the available hours. And each connects to a domain of the Essentials, so that the set spans three domains rather than repeating one.

Table 1. First-Draft and Revised Practicum Objectives

First draftRevised objectiveTaxonomy level and Essentials domainEvidence for the preceptor
Attend the unit falls committeeBy week 4, analyze twelve months of fall data for the unit by time, patient risk factors and injury level and present the findings to the falls committeeAnalyze; quality and safetyWritten analysis and committee minutes
Learn about quality improvementBy week 6, evaluate three evidence-based fall prevention strategies against the unit's fall patterns and recommend one with a written rationaleEvaluate; quality and safetyRecommendation paper reviewed by preceptor
Shadow the nurse managerBy week 8, design a Plan-Do-Study-Act test of the recommended strategy with the manager, including measures and a staffing planCreate; systems-based practiceSigned project plan
Work with other disciplinesBy week 10, lead one interprofessional huddle with physical therapy and pharmacy to review fall risk medications and mobility plansApply and evaluate; interprofessional partnershipsPreceptor observation checklist
Improve my leadershipBy week 12, present results of the first test cycle to unit staff and leaders, including a recommendation to adopt, adapt or abandon the changeEvaluate; systems-based practicePresentation and feedback summary

Note. Each revision names an observable product or performance, a deadline and a level of thinking appropriate to graduate practice.

What this page is doingThe table pairs each weak objective with a revision, level, domain and evidence, and the text names their shared features.
6

Testing the Revisions With the Preceptor

The student reviewed the revised objectives with her preceptor before submitting them. He suggested narrowing the second objective from five strategies to three, since evaluating five would exceed her available hours, and adding a deadline to the fourth. He also asked that each objective include what evidence he would review, which led to the last column of the table. This conversation turned the objectives into a shared agreement about what the practicum would produce and how both would judge success, which is their most important function.

What this page is doingPreceptor review refines scope and evidence and turns objectives into a shared agreement.
7

Avoiding Common Pitfalls

Three pitfalls appear often in practicum objectives. The first is objectives that depend on others' decisions, such as implement a new fall policy, which the student cannot guarantee; the revision instead commits to designing and testing a change and recommending next steps. The second is objectives so numerous that none can be done well; five focused objectives are more achievable than ten scattered ones. The third is objectives that describe what the student already does in her staff role, which would not demonstrate new learning; each revision requires work outside her usual charge nurse duties.

What this page is doingThree common pitfalls are named with the way each revision avoids them.
8

Conclusion

The first-draft objectives described a busy practicum but could not show learning. Applying SMART criteria thoughtfully made them specific, measurable and time-bound, the revised taxonomy lifted them to the analyzing, evaluating and creating levels expected in graduate practice and the Essentials anchored them to advanced competencies. Reviewed with the preceptor and paired with evidence, the revised objectives give student, preceptor and faculty a shared basis for judging what the practicum accomplished.

What this page is doingThe conclusion restates how each framework improved the objectives.
9

References

American Association of Colleges of Nursing. (2021). The essentials: Core competencies for professional nursing education. https://www.aacnnursing.org/essentials

Bjerke, M. B., & Renger, R. (2017). Being smart about writing SMART objectives. Evaluation and Program Planning, 61, 125-127. https://doi.org/10.1016/j.evalprogplan.2016.12.009

Krathwohl, D. R. (2002). A revision of Bloom's taxonomy: An overview. Theory Into Practice, 41(4), 212-218. https://doi.org/10.1207/s15430421tip4104_2

What the NUR 675 Module 2 instructions ask for

Objectives papers in NUR 675 usually ask you to write practicum objectives and explain how they meet criteria for quality and alignment with program outcomes or competencies. Expect to present your objectives, justify them with a framework and show how they will be evaluated. About four to five pages in APA 7 is typical, often with a table. Start each objective with a verb from the higher levels of the revised taxonomy, name an observable product or performance and a deadline, keep the number manageable within your hours, map each objective to an advanced competency and list the evidence your preceptor will review, ideally after discussing the draft with your preceptor. Show the draft beside the revision.

How this NUR 675 Module 2 objectives paper example is built

This paper rewrites a composite charge nurse's first-draft objectives for a falls-focused quality practicum, such as attend the falls committee and learn about quality improvement. It applies SMART criteria with the Bjerke and Renger caution, the Krathwohl revised taxonomy to set analyzing, evaluating and creating levels and the advanced domains of the 2021 AACN Essentials. A table pairs each weak objective with a revision, such as analyzing twelve months of fall data and presenting findings by week four, along with its level, domain and evidence. Preceptor review narrows scope, and three common pitfalls are addressed. Each revision is tied to the unit's fall data. Scope is narrowed after review.

Where the NUR 675 Module 2 rubric puts the points

Grading of objectives papers commonly weighs the quality of the objectives, the accuracy of the framework used to justify them, alignment with competencies, feasibility, plans for evaluation and APA 7 writing. Top-band papers write objectives that name observable outcomes at graduate-level cognitive processes and specify how the preceptor will judge each. Graders reward revisions that show the student understands why an activity is not an objective and objectives that depend on the student's own work rather than others' decisions. Evidence of preceptor input and a realistic scope within practicum hours show readiness for the practicum. Objectives grounded in the problem's causes score higher. Evidence columns that show how each objective will be judged are valued.

NUR 675 Module 2 help: the mistakes that cost points

Objectives papers lose points when objectives list activities, use verbs such as learn or understand, sit at low cognitive levels, depend on decisions the student cannot control or are too many to complete. Another gap is omitting how the preceptor will know each objective was met. Use higher-level verbs, name products and deadlines, keep the list focused, map to competencies, list evidence and review with your preceptor. If your practicum is in nurse education, informatics or a clinical specialty, send your track and site with your NUR 675 prompt so the objectives fit. Tie each objective to the problem you are solving. Keep scope realistic.

Get NUR 675 Module 2 written to your instructions

Share your draft objectives, your track and the NUR 675 grading criteria. The paper you receive will rewrite them as observable graduate-level outcomes, map each to an advanced competency and name the evidence your preceptor will review, within 24 to 48 hours, free the first time. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More NUR 675 papers and related MSN samples

NUR 675 Module 2 questions, answered

Where can I find a free NUR 675 Module 2 Objectives Paper sample?

This page carries the full paper: practicum objectives rewritten with SMART criteria, the revised taxonomy and advanced-level Essentials, shown in a before-and-after table.

What does SMART stand for in objectives?

Specific, measurable, attainable (or assignable), realistic and time-bound, though the letters should never replace thinking about the problem.

Why is learn about not a good objective verb?

Learning cannot be observed directly, so a preceptor cannot judge whether the objective was met; name a product or performance instead.

What cognitive level should MSN practicum objectives target?

Higher levels of the revised taxonomy, such as analyzing, evaluating and creating, rather than remembering or understanding.

How many practicum objectives should I write?

A focused set, often four to six, that can be completed well within practicum hours and together cover the required competencies.