OL 670 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 670 Module 4 Discussion sample uses contingency and situational models to ask why one leader's style worked in a turnaround and fits less well as the organization grew. SNHU OL 670 (OL-670) brings situation into its MS Organizational Leadership course at this point, after traits. The post contrasts two winters in the career of Margit Solberg, the invented founder of Highfold Mountain Group: 2010, when she ran a nearly bankrupt Colorado hill with 140 staff and settled every question herself, and 2024, when four seasoned general managers waited for her approval on routine spending. It draws on a meta-analysis of Fiedler's theory, a test of situational leadership and the reformulated path-goal theory.

CourseOL 670 Organizational Leadership
ModuleModule 4
Paper typegraduate discussion post applying contingency and situational models to explain why one leader's style suited a turnaround and fits a four-resort company less well
LengthAbout 430 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 670 Module 4

1

Module Four Discussion

The Right Leader for 2010, and for 2024?

In the winter of 2010 Margit Solberg ran Bristlecone Basin, a Colorado ski hill that had just been bought out of bankruptcy. She had 140 staff, half of them new, one working chairlift, a snowmaking system older than most of the lift crew and a lender watching weekly cash. She set the grooming plan each night, priced the night skiing herself and interviewed every ski school instructor. The hill made it through the season. By the winter of 2024 she led Highfold Mountain Group, with four resorts and general managers who averaged eleven years running mountains. Yet each of them still sent her any spending request above $25,000, and she still joined their 6 a.m. calls every day of the season.

What this page is doingTwo winters.
2

Fiedler's theory treats a leader's style as fairly fixed and predicts that a task-oriented leader does best when the situation is very favorable or very unfavorable. Peters et al. (1985) applied meta-analytic methods to the studies of the theory and found support that was stronger in laboratory work than in field settings, and uneven across the situations it describes. Even with that caution, Bristlecone Basin in 2010 looks like a highly unfavorable situation: weak structure, a crew that did not yet trust her and little slack. A firm, task-oriented approach fits it.

What this page is doingReading the first winter.
3

Path-goal theory gives a sharper view of 2024. House (1996) reformulated it to argue that leaders are effective when they provide what subordinates and their work environment lack. Experienced general managers do not lack direction on grooming or pricing; they lack authority and room to decide. A directive leader adds little for such people and may lower their motivation, which fits the turnover in her senior team. The situational leadership model points the same way, since it prescribes delegating to followers who are both able and committed. Thompson and Vecchio (2009), however, tested three versions of that model and found little support for its prescriptions, so I use it only as a prompt, not proof.

What this page is doingReading the second winter.
4

Solberg did not become a worse leader between 2010 and 2024. The situation changed and her style did not change with it. That raises a hard question for Milestone Two: whether her behavior with senior managers is a habit she could change or a stable style, as Fiedler would say, in which case the company may need a different structure around her.

What this page is doingWhat this means for my analysis.
5

When a founder's style fits the company she built but not the company it has become, should she change her style, change the structure around her or change jobs?

What this page is doingQuestion for the thread.
6

References

House, R. J. (1996). Path-goal theory of leadership: Lessons, legacy, and a reformulated theory. The Leadership Quarterly, 7(3), 323-352. https://doi.org/10.1016/S1048-9843(96)90024-7

Peters, L. H., Hartke, D. D., & Pohlmann, J. T. (1985). Fiedler's contingency theory of leadership: An application of the meta-analysis procedures of Schmidt and Hunter. Psychological Bulletin, 97(2), 274-285. https://doi.org/10.1037/0033-2909.97.2.274

Thompson, G., & Vecchio, R. P. (2009). Situational leadership theory: A test of three versions. The Leadership Quarterly, 20(5), 837-848. https://doi.org/10.1016/j.leaqua.2009.06.014

What the OL 670 Module 4 instructions ask for

The OL 670 Module 4 discussion turns from the leader to the situation. Students are asked to apply a contingency or situational model, such as Fiedler's contingency theory, the situational leadership model or path-goal theory, to the leader they are studying and to judge whether that person's style matched the followers, the task and the leader's power at a particular time. Many prompts invite a comparison of two periods or two settings. Strong posts describe the situation in the model's own terms, for example task structure, follower readiness or position power, and then judge the fit. They also report what research says about each model's support, since several of them have weak evidence. Replies often propose a different model for the same facts.

How this OL 670 Module 4 discussion example is built

The post takes two winters from the invented career of Margit Solberg. In 2010 she ran Bristlecone Basin, a ski hill that had just come out of bankruptcy, with 140 staff, many of them new, a tight budget and no margin for error; she decided grooming plans, prices and hiring herself, and the hill survived. By 2024 she led four resorts whose general managers averaged eleven years in the industry, yet they still needed her signature for spending above $25,000. Peters and colleagues' meta-analysis of Fiedler's theory, the three-version test of situational leadership by Thompson and Vecchio and House's reformulated path-goal theory each suggest that her directive approach fit the first situation and not the second, and the post asks classmates whether leaders adapt or get replaced.

Where the OL 670 Module 4 rubric puts the points

Marks in the OL 670 contingency discussion generally depend on correct use of at least one situational model, a clear description of the leader's situation in that model's terms, a reasoned judgment about fit, awareness of the evidence for and against the model and replies that add a perspective rather than echo the post. Posts that earn the most compare two situations, use the model's variables precisely and say plainly where the model fails to predict what happened. Posts lose credit when they name a model without applying its variables, describe a leader as simply adaptable, ignore the followers' skills or report research findings inaccurately. Citations in APA style and clear writing round out how these posts are graded.

OL 670 Module 4 help: the mistakes that cost points

Pick two moments from your leader's career that differ in obvious ways, such as a crisis and a period of stability, or a small organization and a large one. For each, write down what the followers knew, how structured the work was and how much formal power the leader held, then apply one model carefully instead of three loosely. Check what the research says about that model before you lean on it; some popular situational models have thin support. A common mistake is concluding that a successful leader must have adapted, without showing what actually changed. Another is forgetting that followers grow, so a style that suited a new crew can frustrate the same people years later. End with a question about whether your leader should change.

Get OL 670 Module 4 written to your instructions

Share the OL 670 Module 4 prompt and two moments from your leader's career. A writer reads each moment through contingency, situational and path-goal models, explains whether the leader's style matched the followers and the task at the time and asks classmates whether leaders adapt or get replaced. Get the first OL 670 contingency post at no cost, typically inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 670 papers and related MS Organizational Leadership samples

OL 670 Module 4 questions, answered

Where can I find a free OL 670 Module 4 Discussion sample?

The complete OL 670 Module 4 post is on this page; it compares a ski founder's turnaround winter with her company's growth years through contingency and path-goal models.

What is Fiedler's contingency theory?

It holds that a leader's fixed style, task oriented or relationship oriented, works best in particular situations defined by leader-member relations, task structure and the leader's position power.

What is the situational leadership model?

A model that matches a leader's mix of directing and supporting behavior to followers' competence and commitment on a given task, moving from telling toward delegating as followers develop.

How does path-goal theory work?

It says effective leaders supply what followers and the work environment lack, such as direction, support, participation or high goals, so that followers can reach their goals and the organization's.

Is there research support for situational leadership?

Evidence is limited. Studies testing its prescriptions have generally found weak or partial support, so it is better used as a prompt for reflection than as a proven rule.