| Course | OL 751 Human Resource Management Capstone |
|---|---|
| Module | Module 4 |
| Paper type | graduate capstone milestone aligning HR with the organization's strategy and analyzing the gaps between HR's current and required role across structure, practices, systems and measures |
| Length | About 1,140 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Human Resource Management |
| Updated | October 2026 |
Free sample paper for OL 751 Module 4
What the Strategy Needs From People: Gap Analysis for HR at Loup Valley Irrigation
[Student Name]
Southern New Hampshire University
OL 751: Human Resource Management Capstone
Milestone Two: Strategic Alignment and Gap Analysis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
What the Strategy Needs From People: Gap Analysis for HR at Loup Valley Irrigation
Introduction
Milestone One described Loup Valley Irrigation and found an HR department built for administration in a company whose strategy now depends on people it does not have. This milestone analyzes that mismatch. It translates the company's two strategic goals into people requirements, compares those requirements with what HR delivers today, scores the gaps and ranks them. The analysis uses research on strategic HR to explain why the gaps exist and which ones cause the others.
The Strategy in People Terms
The 2025 strategy has two goals. The first is to double output at the Uberlândia plant by 2028 to serve Brazil's growing irrigated acreage. That requires about 300 additional Brazilian employees, roughly 25 additional supervisors and at least four managers able to run a larger plant under Brazilian labor law, along with experienced welders and supervisors from Nebraska to help train them in the first two years. The second goal is to grow LoupLink to roughly two and a half times its 2025 base of 18,000 connected pivots. That requires about 30 more software engineers, data specialists and product managers, a dealer network whose technicians can install and troubleshoot connected equipment and a sales force that can sell a subscription rather than a machine. Underlying both goals is a stable Nebraska welding and assembly workforce, since every pivot sold in Brazil or monitored by LoupLink begins as steel welded in Columbus or York.
Theory for the Analysis
Wright and McMahan (1992), whose definition of strategic HR centers on planning HR choices around business goals, reviewed theories explaining why such a set matters, from the resource-based view, which treats skilled people as a source of advantage competitors cannot easily copy, to institutional theory, which explains why organizations often adopt practices because others do. Becker and Huselid (2006) add that HR creates value mainly by helping the firm carry out its strategy and that investment should differ by role, concentrating on the jobs where performance differences matter most to that strategy. Jiang et al. (2012) grouped practices into those that build skills, those that build motivation and those that create opportunities to contribute, finding that each bundle reaches financial results through people outcomes such as human capital, turnover and operations. Bowen and Ostroff (2004) explain that a system works when its messages are clear and consistent enough that employees share a view of what is expected and rewarded. The analysis below uses these ideas to judge each gap.
The Six Gaps
The first gap is position. HR reports to the chief financial officer and is not part of strategy meetings, so people requirements are discovered after decisions are made, as with the Brazilian expansion. This is a root gap: it explains why HR has never been asked to plan.
The second gap is global reach. HR in Brazil is a consulting contract that reports to the plant manager, and Columbus HR has no data on Brazilian turnover, pay or supervisors. A plan to double that plant cannot be supported by a function that cannot see it.
The third gap is differentiation. Recruiting, pay and development are the same for every job. Software engineers are recruited by the same two generalist recruiters using the same job boards as assemblers, and their pay bands were set by a 2019 survey of manufacturing jobs. Becker and Huselid would call this a failure to invest where performance differences matter most, and it shows in 140-day vacancies.
The fourth gap is the leadership pipeline. With 38 percent of plant supervisors eligible to retire within five years and no succession plan, the company cannot both replace retirees in Nebraska and send experienced supervisors to train Brazilian staff. Development consists of one three-day course a year, a skills bundle far too thin for the demand.
The fifth gap is time and systems. With about 70 percent of HR time on transactions and systems that do not share data, HR has no capacity for planning. This gap is partly a symptom of the first and partly a cause of the sixth.
The sixth gap is measurement. HR reports activity counts that executives do not use and has not measured engagement since 2021. Without measures linked to output, quality and growth, HR cannot show the effects that Jiang et al. found run through people outcomes to financial results, and the system sends weak signals about what matters, in Bowen and Ostroff's terms.
Gap Scores
HR gaps scored for size and business impact (1 = low, 5 = high)
| Gap | Size | Business impact | Total | Type |
|---|---|---|---|---|
| Position outside strategy | 5 | 5 | 10 | Root |
| Leadership pipeline | 4 | 5 | 9 | Critical |
| Differentiation for critical roles | 4 | 5 | 9 | Critical |
| Global reach in Brazil | 5 | 4 | 9 | Critical |
| Measurement | 4 | 3 | 7 | Enabling |
| Transactional time and systems | 4 | 3 | 7 | Enabling |
Risks of Leaving the Gaps Open
If the gaps stay open, the strategy's timeline is at risk in specific ways. Without a supervisor pipeline, the Brazilian expansion would rely on hiring experienced supervisors in a market where competitors are also expanding, and the company's last two Uberlândia plant managers each lasted under three years. Without differentiated recruiting and pay, the software vacancies would continue to delay LoupLink features, and growers who switch to a rival's monitoring service rarely switch back. Without a stable welding workforce, every additional order adds overtime and weld defects. Each of these risks would surface first as an operational problem, which is why HR needs measures that make them visible early.
What Causes What
The gaps are linked. Because HR sits outside strategy, it was not asked to plan for Brazil or for LoupLink, so it built no global reach and no differentiated practices. Because it has no measures linked to results, it cannot make the case for a strategic role. And because its time is consumed by transactions, it has no capacity to build any of these. The proposal must therefore address the root gap and the enabling gaps alongside the critical ones; fixing recruiting for software engineers without changing HR's position would leave the next strategic shift just as unprepared.
Priorities for the Proposal
Milestone Three will address four priorities: repositioning HR as a strategic partner reporting to the chief executive; building a global HR structure that includes Brazil; creating differentiated talent practices for software, welding and supervisory roles, including a supervisor succession pipeline; and freeing HR capacity through integrated systems and shared services so that measures linked to business results can be produced. The proposal will not address benefits design or labor relations in Nebraska, which are functioning well.
Conclusion
Loup Valley's strategy is a people strategy whether or not the company calls it one. The gap between what the strategy needs and what HR delivers is widest where HR's position keeps it from planning at all, and the proposal must begin there.
References
Becker, B. E., & Huselid, M. A. (2006). Strategic human resources management: Where do we go from here? Journal of Management, 32(6), 898-925. https://doi.org/10.1177/0149206306293668
Bowen, D. E., & Ostroff, C. (2004). Understanding HRM-firm performance linkages: The role of the "strength" of the HRM system. Academy of Management Review, 29(2), 203-221. https://doi.org/10.2307/20159029
Jiang, K., Lepak, D. P., Hu, J., & Baer, J. C. (2012). How does human resource management influence organizational outcomes? A meta-analytic investigation of mediating mechanisms. Academy of Management Journal, 55(6), 1264-1294. https://doi.org/10.5465/amj.2011.0088
Wright, P. M., & McMahan, G. C. (1992). Theoretical perspectives for strategic human resource management. Journal of Management, 18(2), 295-320. https://doi.org/10.1177/014920639201800205
What the OL 751 Module 4 instructions ask for
The second OL 751 milestone typically asks students to analyze how well the HR function's current role and practices support the organization's strategy and to identify the gaps the capstone proposal must close. Expect to connect the strategy's goals to specific people requirements, compare those requirements with HR's current structure, practices, systems and measures and explain the size and consequences of each gap. Many versions ask for a framework or model of strategic HR to organize the analysis and for priorities among the gaps. Strong milestones treat gaps as business risks, quantified where possible, rather than as HR wish lists, and they build directly on the assessment in Milestone One and the feedback on it.
How this OL 751 Module 4 milestone two example is built
The milestone takes Loup Valley Irrigation's two strategic goals, doubling output in Uberlândia by 2028 and raising LoupLink subscriptions from 18,000 to 45,000 pivots, and translates them into people requirements: about 300 Brazilian hires and 25 Brazilian supervisors, 30 software and data staff, a stable welding workforce and dealer technicians trained in connected equipment. Six gaps are scored for size and business impact, from HR's reporting line to measures that link nothing to results. Wright and McMahan, Becker and Huselid's argument for differentiated investment, the Jiang team's skill, motivation and opportunity bundles and Bowen and Ostroff's system strength explain the gaps, and a ranked list sets priorities for Milestone Three.
Where the OL 751 Module 4 rubric puts the points
OL 751 Milestone Two is usually assessed on a clear translation of business strategy into people requirements, an accurate and evidence-based comparison with HR's current role, gaps explained in terms of business consequences, use of strategic HR theory or research to organize the analysis and sensible priorities for the proposal. The strongest papers quantify requirements and gaps, use a consistent scoring method and show which gaps cause others. Credit falls when gaps are stated as HR preferences, when the strategy is mentioned but not translated into requirements, when evidence from Milestone One is not used or when everything is ranked equally. APA formatting and organization make up the rest of the rubric.
OL 751 Module 4 help: the mistakes that cost points
Write each strategic goal at the top of a page and list what it requires in people: how many, with what skills, where, by when and led by whom. Then compare each requirement with what HR can deliver today, using the evidence from Milestone One. Score each gap on two scales, such as size and business impact, so priorities follow from evidence rather than preference. A common mistake is listing every HR improvement imaginable; another is analyzing HR practices one by one without asking how they work together. Look for root gaps that cause others, such as a reporting line that keeps HR out of planning. End with three or four priorities that the detailed proposal in Milestone Three will address, and note what you will deliberately leave out.
Get OL 751 Module 4 written to your instructions
Give us the OL 751 Milestone Two guidelines and your Milestone One with its comments. A writer translates the organization's strategy into people requirements, compares them with what HR delivers now, scores the gaps across structure, practices, systems and measures and ranks them so your detailed proposal targets the right ones. A first OL 751 Milestone Two is drafted free and usually returned within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 751 papers and related MS Human Resource Management samples
- OL 751 Module 1 Discussion: A Seat at the Table or the Back Office?
- OL 751 Module 2 Milestone One: The Organization and Its HR Function
- OL 751 Module 3 Discussion: Proving HR's Value With Data
- OL 751 Module 5 Milestone Three: The Detailed HR Proposal
- OL 751 Module 6 Discussion: Talent Across Nebraska and Brazil
- OL 751 Module 7 Milestone Four: Implementation, Measures and Change
- OL 751 Module 8 Discussion: How Employees Read an HR Overhaul
- OL 751 Module 9 Final Project: The HR Strategy Proposal
- OL 751 Module 10 Reflection: My Path in the HR Profession
- BMB 670 Module 1 Discussion: What Makes a Music Business Leader Effective
- QSO 560 Module 6 Dashboard Assignment: A Morning Screen for General Managers
- INT 640 Module 6 Discussion: First In, or Second and Wiser?
- OL 600 Module 8 Discussion: HR Analytics and Technology
OL 751 Module 4 questions, answered
Where can I find a free OL 751 Module 4 Milestone Two sample?
Scroll up for the whole OL 751 Milestone Two: an invented irrigation maker's strategy turned into people requirements, with HR's gaps scored and ranked.
What is an HR gap analysis?
A comparison between what the business strategy requires from the workforce and HR, and what the HR function currently delivers, with the size and impact of each gap.
How do I link HR to business strategy?
Translate each strategic goal into specific people requirements, such as numbers, skills, locations and leadership, then judge HR practices by whether they meet them.
What is a differentiated HR architecture?
The idea that an organization should invest more in the roles most critical to its strategy instead of treating all jobs the same in hiring, pay and development.
How should OL 751 gaps be prioritized?
Score each gap for size and business impact, look for root gaps that cause others and focus the proposal on the few that matter most to the strategy.