| Course | PSY 108 Introduction to Psychology |
|---|---|
| Module | Module 5 |
| Paper type | Emotional intelligence discussion post |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 108 Module 5
Module Five Discussion: Emotional Intelligence in Crisis Management
Re: The lights went out and everyone looked at the manager
Picture a composite grocery store at 11 a.m. on a Saturday when the power fails. Registers go dark, a child starts crying, a line of customers with full carts wants answers and the freezer section has maybe two hours before food must be thrown out. Everyone turns to the manager on duty.
Mayer et al. (2008) describe emotional intelligence as a set of four abilities, and a crisis like this calls on each in turn. Perceiving emotions: the manager notices that the loudest customer is frustrated, while the parent with the crying child is frightened, and those call for different responses. Using emotions: a little urgency is useful, sharpening attention to the freezers, as long as it does not turn into panic. Understanding emotions: frustration will grow into anger if customers feel ignored, so an early announcement matters more than a perfect one. Managing emotions: the manager has to calm herself before she can calm anyone else.
That last step is where research on emotion regulation helps. Gross (1998) distinguished reappraisal, changing how one interprets a situation, from suppression, hiding the emotion one already feels. Suppression tends to use up mental resources and leaves the feeling in place. A manager who reappraises, thinking "this is a problem with a checklist, and we have one," is more likely to think clearly than one who is quietly panicking behind a calm face. Staff and customers take their emotional cue from the person in charge, so her regulation spreads.
I want to keep the claim realistic, though. Joseph and Newman (2010) found in their meta-analysis that emotional intelligence predicted job performance mainly in jobs with high emotional labor, where managing feelings is part of the work, and that its effects were modest compared with some popular claims. Retail management in a crisis is exactly that kind of work, but emotional intelligence works alongside knowing the procedures, not instead of it.
Question for classmates: have you seen someone handle a workplace crisis well or badly, and which of the four abilities made the difference?
References
Gross, J. J. (1998). The emerging field of emotion regulation: An integrative review. Review of General Psychology, 2(3), 271-299. https://doi.org/10.1037/1089-2680.2.3.271
Joseph, D. L., & Newman, D. A. (2010). Emotional intelligence: An integrative meta-analysis and cascading model. Journal of Applied Psychology, 95(1), 54-78. https://doi.org/10.1037/a0017286
Mayer, J. D., Salovey, P., & Caruso, D. R. (2008). Emotional intelligence: New ability or eclectic traits? American Psychologist, 63(6), 503-517. https://doi.org/10.1037/0003-066X.63.6.503
What the PSY 108 Module 5 instructions ask for
The Module 5 discussion in PSY 108 applies concepts about emotion or emotional intelligence to a situation. Most versions of the prompt describe a crisis, conflict or workplace scene and ask how emotional intelligence would help, with research to support the answer. A concrete scene makes the four branches of the model easy to show one at a time. Cite the PSY 108 textbook and one or more peer-reviewed studies using APA 7. Your opening post goes up midweek, and replies to classmates follow by the end of the module. Be balanced, since emotional intelligence research shows real effects but also clear limits, and the post should say so. Keep any real people unidentifiable by using a composite. Name each branch in your own words so the application is easy for classmates to follow.
How this PSY 108 Module 5 emotional intelligence in a crisis discussion example is built
The post opens with the outage: lights out, registers frozen and a line of customers growing restless near the front doors. The second paragraph walks through the four branches as the manager acts. She notices fear and frustration in faces, uses a calm voice to steady her staff, understands that people feel trapped in a dark store and manages emotions by giving clear instructions and regular updates. The third paragraph brings in research contrasting reappraisal, reframing a situation, with suppression, hiding feelings, and their different effects on stress and memory. The fourth paragraph gives a realistic view: emotional intelligence predicts some workplace outcomes modestly, not everything popular books claim. The closing question asks classmates about a crisis they have seen handled well and which branch made the difference.
Where the PSY 108 Module 5 rubric puts the points
The PSY 108 discussion rubric covers the initial post, peer replies, deadlines and writing quality, with every criterion placed on SNHU's four levels. Exemplary posts apply each branch of the model to the scene accurately and support the account with research. Replies earn credit when they add a branch, a study or a different crisis rather than agreeing. APA citation of the model and the studies counts toward the writing criterion, together with clarity. Graders in PSY 108 often look for a balanced view of emotional intelligence, since popular claims about it go far beyond the evidence. Naming the modest size of the effects shows careful reading. Posting on time matters because classmates need the post to reply to before the module closes.
PSY 108 Module 5 help: the mistakes that cost points
Emotional intelligence posts often describe a calm leader without naming the branches of the model. Overstating emotional intelligence is another frequent weakness, claiming it predicts success more than general intelligence does. A few students confuse reappraisal with suppression, which research shows work very differently. Choosing a scene with no emotional challenge leaves little to apply. Popular books on emotional intelligence are not the same as peer-reviewed research, so cite studies. Keep the scene short so the analysis has room. Close with a prompt about a crisis classmates have lived through or watched, such as a delayed flight or a hospital waiting room, because a PSY 108 thread of real crises handled well or badly gives the class concrete examples of the model at work.
Get PSY 108 Module 5 written to your instructions
Share your PSY 108 Module 5 discussion prompt and grading rubric. A post applying emotional intelligence to your crisis example comes back within 24 to 48 hours, and the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 108 papers and related BA Psychology samples
- PSY 108 Module 1 Psychology as a Science Discussion: Does venting anger really help
- PSY 108 Module 2 Project One Milestone Graphic Organizer: Six perspectives on student stress
- PSY 108 Module 3 Project One Perspectives Paper: How three perspectives study stress
- PSY 108 Module 4 Nature Versus Nurture Position Paper: Nature through nurture in depression
- PSY 108 Module 6 Project Two Problem and Research Paper: A bedtime phone habit and sleep
- PSY 108 Module 7 Human Versus Computer Intelligence Discussion: Human versus computer intelligence
- PSY 108 Module 8 Project Three Action Plan: Eight-week plan to put the phone down
- ENG 122 Module 3: sample paper, in real form
PSY 108 Module 5 questions, answered
What does PSY 108 Module 5 cover?
The fifth module often addresses emotion and motivation, including emotional intelligence, and a discussion may ask students to apply emotional intelligence to a situation such as managing a crisis at work.
What are the four branches of emotional intelligence?
In the ability model developed by Mayer and Salovey, emotional intelligence includes perceiving emotions accurately, using emotions to help thinking, understanding emotions and how they change and managing emotions in oneself and others.
What is the difference between reappraisal and suppression?
Reappraisal changes how a situation is interpreted before an emotion fully develops, while suppression hides the outward expression of an emotion that is already felt. Research suggests reappraisal is usually the healthier and more effective strategy.
Where can I find a free PSY 108 Module 5 discussion sample?
The full post is on this page: the four-branch model of emotional intelligence applied to a store manager during a power outage, with research on reappraisal and a balanced view of what emotional intelligence predicts. Use it as a model.
Does emotional intelligence predict job performance?
Research finds modest links between emotional intelligence and job performance, stronger in jobs with heavy emotional demands. The effects are smaller than popular books suggest, and measures differ in quality.