QSO 250 Module 7 Project Two Example

Reviewed by Portia Lambrick, MBA

This QSO 250 Module 7 Project Two sample reports how a business dataset was prepared and what a descriptive analysis of it shows, ending with findings and recommendations managers can act on. SNHU QSO 250 (QSO-250) asks for this second project of its BS Business Administration analytics course in Module 7. The business is Cadenza Music, an invented chain that rents band instruments to school students. Of 37,940 new fall contracts over three seasons, 21.4 percent ended early; the analysis tests five hypotheses from Project One, finds the strongest links with repair delays, payment method and instrument, finds one hypothesis about grade was wrong and recommends four changes.

CourseQSO 250 Business Analytics
ModuleModule 7
Paper typeundergraduate project reporting how a business dataset was prepared and what a descriptive analysis of it shows, with findings and recommendations for managers
LengthAbout 1,170 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for QSO 250 Module 7

1

Who Returns the Trumpet by March: An Early-Return Analysis for Cadenza Music

[Student Name]

Southern New Hampshire University

QSO 250: Business Analytics

Project Two: Data Preparation and Analysis Report

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingAll rates, counts and findings in this QSO 250 report come from an invented dataset.
2

Who Returns the Trumpet by March: An Early-Return Analysis for Cadenza Music

Summary

Of 37,940 new fall rental contracts that Cadenza Music signed in 2023, 2024 and 2025, 21.4 percent, or 8,120, came back before the school year was out. Three factors were most strongly associated with an early end: a fall repair that kept the instrument away from its student for over two weeks, paying by monthly invoice rather than autopay and renting a French horn or oboe. One hypothesis was wrong: fifth graders, not sixth graders, had the highest early-return rate. Four recommendations follow: loaner instruments during school-year repairs, autopay offered by default at sign-up, a trial month for difficult instruments and a required return-reason code at the counter.

What this page is doingStates the main findings first.
3

Business Question and Data

Project One asked which new fall contracts end within the first school year and what distinguishes them. The analysis rests on two linked files: every contract, and every repair ticket matched to it through the instrument's serial. Wickham (2014) argues that most of the work in analysis is preparing data in a consistent form, and that held here: the raw export of 41,800 records required ten documented cleaning steps.

Summary of data preparation

StepEffect
Removed training, test and duplicate records1,548 records removed
Standardized instrument names147 spellings mapped to 22 instruments
Recovered or labeled missing schools2,050 filled from family records; 1,590 Unknown School
Corrected or excluded impossible dates61 corrected; 25 excluded
Linked size exchanges1,140 exchanges not counted as returns
Joined repair tickets by normalized serial number97 percent of tickets matched
Selected fall-start contracts37,940 contracts analyzed
What this page is doingRecalls the frame from Project One.
4

Hypothesis 1: Repair Delays

Among the 3,410 contracts whose instrument was in the shop for 15 days or more between September and December, 34.8 percent ended early; among the rest, 20.1 percent did. The difference is large and consistent in all three seasons. The 3,410 contracts with long repair delays represent 9 percent of fall contracts but 15 percent of early returns. A student who spends three weeks of fall without an instrument falls behind the band, and the data suggest many do not catch up. Hypothesis 1 is supported.

What this page is doingTests the effect of time in the shop.
5

Hypothesis 2: Payment Method

Contracts paid by autopay ended early at 15.2 percent, while those paid by monthly invoice ended early at 29.3 percent. Some of this difference likely reflects the families who choose autopay rather than autopay itself, since families committed to a full year may be more willing to set it up. Even so, the gap is large, and contracts that switched from invoice to autopay during the fall ended early less often than those that did not switch. Hypothesis 2 is supported, with the caution that the association is not proof of cause.

What this page is doingTests autopay against invoice.
6

Hypothesis 3: Instrument

Early-return rate by instrument, fall contracts 2023 to 2025

InstrumentContractsEarly-return rate
French horn61036.2 percent
Oboe34033.5 percent
Trombone2,48026.1 percent
Violin5,12024.9 percent
Cello1,69023.6 percent
Alto saxophone4,35021.6 percent
Trumpet5,06020.4 percent
Flute5,88019.0 percent
Clarinet5,94018.2 percent
Percussion kit3,11014.8 percent
All others3,36024.8 percent

French horn and oboe, both difficult for beginners, have the highest rates, though they are small groups. Trombone and the string instruments come next. Hypothesis 3 is supported: instrument matters, and the hardest instruments lose the most students.

What this page is doingTests differences by instrument.
7

Hypothesis 4: Grade

Project One predicted that sixth graders would have the highest early-return rate. Instead, fifth graders did, at 24.9 percent, against 22.6 percent for sixth graders and 14.1 percent for seventh graders. Fifth-grade contracts come mostly from districts where band starts in elementary school, and route representatives report that those programs meet less often. Hypothesis 4 is not supported as stated; the pattern is that the younger the starting grade, the higher the rate.

What this page is doingFinds a surprise.
8

Hypothesis 5: Program Size

Contracts from schools with fewer than 15 new fall contracts ended early at 27.8 percent, against 20.3 percent for larger programs. Small programs are often run by a director who also teaches other subjects, which may limit how much time beginners get. Hypothesis 5 is supported. Contracts with unknown schools ended early at 25.4 percent and are reported separately.

What this page is doingTests small band programs.
9

An Additional Finding

Families who bought an accessory or method book within 30 days of starting a rental ended early at 13.5 percent, compared with 26.1 percent for families who did not. This was not a hypothesis in Project One, but it may be the most useful early warning available, since it is known within a month.

What this page is doingReports the engagement measure.
10

Interpretation

Neslin et al. (2006), comparing many churn models built on the same customer data, found that the variables analysts chose drove much of the accuracy and that models remained useful months later. The descriptive results here identify the variables a future prediction of early returns should include: repair delay, payment method, instrument, starting grade, program size and early purchases. Ghasemaghaei et al. (2018) found that firms' analytics competency, including data quality and analysts' knowledge of the business, was associated with better decision quality. Several findings here only made sense because store staff and route representatives explained what the numbers might mean, such as why fifth-grade programs differ.

What this page is doingExplains what the findings mean together.
11

Recommendations

First, offer a loaner instrument whenever a school-year repair is expected to take more than a week. With about 1,100 long repairs each fall and an early-return cost of about $174, reducing the early-return rate for these contracts to the average would save roughly $26,000 a year, enough to pay for a small pool of loaner trumpets, clarinets and violins.

Second, make autopay the default option at sign-up, with invoice available on request, and test the effect at four stores before rolling it out.

Third, offer a one-month trial before a rent-to-own contract for French horn, oboe and trombone, so families can switch instruments without a return.

Fourth, add a required return-reason code at the counter, so future analysis can see why rentals end rather than inferring it.

What this page is doingTurns findings into actions.
12

How Big the Opportunity Is

Taken together, the findings suggest how much of the problem is within Cadenza's reach. If the early-return rate for invoice-paid contracts fell halfway toward the autopay rate, about 590 fewer rentals a year would end early. Loaners for long repairs could prevent roughly 150 more. Trial months for the three hardest instruments might prevent another 60. At about $174 per early return, these changes together are worth roughly $140,000 a year, a little under a third of the total cost. The rest of the problem, students who simply lose interest, may be beyond any store policy, which is itself useful for the chief executive to know.

What this page is doingSizes the possible savings.
13

Limitations and Next Steps

All findings are associations; a family that picks autopay or buys reeds in September may already be more committed to band, and the file holds no measure of that commitment. The 1,590 contracts with unknown schools were excluded from school-level results. The next step is to test the autopay default and the loaner program as controlled pilots and, if the patterns hold, build a simple model that flags at-risk contracts by October for the helpful outreach discussed in Module 6.

What this page is doingStates what the analysis cannot show.
14

References

Ghasemaghaei, M., Ebrahimi, S., & Hassanein, K. (2018). Data analytics competency for improving firm decision making performance. The Journal of Strategic Information Systems, 27(1), 101-113. https://doi.org/10.1016/j.jsis.2017.10.001

Neslin, S. A., Gupta, S., Kamakura, W., Lu, J., & Mason, C. H. (2006). Defection detection: Measuring and understanding the predictive accuracy of customer churn models. Journal of Marketing Research, 43(2), 204-211. https://doi.org/10.1509/jmkr.43.2.204

Wickham, H. (2014). Tidy data. Journal of Statistical Software, 59(10), 1-23. https://doi.org/10.18637/jss.v059.i10

What the QSO 250 Module 7 instructions ask for

QSO 250 Project Two typically asks students to prepare a dataset and report a descriptive analysis that addresses the business question framed in Project One. Expect to summarize the data preparation steps and their effects, present descriptive statistics and comparisons that address each hypothesis or question, interpret what the results mean for the business and make recommendations, along with limitations and next steps. Many versions ask for tables or charts. Strong reports are organized around the business question rather than around the software output, state plainly when a hypothesis is not supported and translate each finding into a decision someone could make. The report should be readable by a manager without an analytics background.

How this QSO 250 Module 7 project two example is built

The report analyzes 37,940 cleaned fall contracts from Cadenza Music, a fictional instrument rental chain, of which 21.4 percent ended before the school year did. It tests Project One's five hypotheses: contracts whose instruments spent more than two weeks in repair ended early at 34.8 percent against 20.1 percent; invoice-paid contracts at 29.3 percent against 15.2 percent on autopay; French horn and oboe above a third; grade 5, not grade 6, had the highest rate; and small programs ran higher. Families who bought accessories in the first month ended early far less often. Neslin and colleagues, Wickham and Ghasemaghaei and colleagues inform the method and four recommendations follow.

Where the QSO 250 Module 7 rubric puts the points

Instructors grading QSO 250 Project Two tend to look for an accurate summary of data preparation, appropriate descriptive analysis addressing each question or hypothesis, correct and clear presentation of results, sound interpretation, actionable recommendations linked to findings and honest limitations. The strongest reports state each hypothesis, show the evidence, say whether it is supported and explain what the finding means for a decision. Instructors also check that the numbers in the summary match those in the tables. Credit drops when reports present tables without interpretation, claim causes from associations, ignore unsupported hypotheses, give recommendations unconnected to the data or omit limitations. Organization, readability for managers and APA citations complete the rubric.

QSO 250 Module 7 help: the mistakes that cost points

Open the report with the answer, the overall rate and the two or three strongest findings, then show how you got there. Summarize cleaning in a short table rather than repeating the full log. For each hypothesis, present the comparison, say whether it is supported and explain the size of the difference in business terms, such as how many contracts or dollars it represents. Report surprises and unsupported hypotheses; they are often the most useful findings. A common mistake is treating a difference in rates as proof of cause; another is a recommendation list that does not follow from the numbers. Keep charts and tables simple, label them fully and tell the reader what each one shows. End with limitations and the next analysis worth doing.

Get QSO 250 Module 7 written to your instructions

Upload the QSO 250 Project Two guidelines with your Project One and your cleaned data or cleaning notes. A writer summarizes the preparation, runs and reports the descriptive analysis, tests each hypothesis honestly, presents results in clear tables and turns findings into recommendations managers can act on. Your opening QSO 250 Project Two costs you nothing; most come back two days after the files arrive. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 250 papers and related BS Business Administration samples

QSO 250 Module 7 questions, answered

Where can I find a free QSO 250 Module 7 Project Two sample?

The complete QSO 250 Project Two is on this page: an invented instrument rental chain's cleaned data analyzed for early returns, with hypotheses tested and recommendations.

What goes in the QSO 250 Project Two report?

A summary of data preparation, descriptive analysis addressing the business question and hypotheses, interpretation, recommendations linked to findings and limitations.

What is descriptive analysis?

Summarizing and comparing data, such as rates, averages and counts by group, to show what happened and which characteristics are associated with an outcome.

Can descriptive analysis prove cause and effect?

No. It shows associations; other factors may explain a difference, so recommendations should be framed as tests or reasonable actions rather than proven fixes.

How should I present results to managers?

Lead with the answer, use simple labeled tables or charts, explain each finding in business terms and connect it to a decision the manager makes.