| Course | QSO 440 Topics in Project Management |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment selecting and sequencing a project portfolio with a weighted scoring model, mandatory projects and capital and resource constraints |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 440 Module 2
Seventy-Nine, Seventy-Three, Seventy-Two: Selecting the Coldwater Valley Project Portfolio
[Student Name]
Southern New Hampshire University
QSO 440: Topics in Project Management
Portfolio Selection Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Seventy-Nine, Seventy-Three, Seventy-Two: Selecting the Coldwater Valley Project Portfolio
Introduction
Coldwater Valley Electric Cooperative has eight capital projects asking for funding over the next three years. The board has set a capital limit of about $38 million a year, based on what the cooperative can borrow from its lender without raising rates beyond its plan, and the cooperative has 24 line crews and eight engineers. Until now each project was approved on its own case, which is how the total came to exceed the limit. This assignment scores the projects against common criteria, separates mandatory work, fits the portfolio to money and people and explains what waits.
Candidate Projects
Candidate projects
| Project | Total cost | Year-one cost, net of grants | Main benefit |
|---|---|---|---|
| Fiber broadband, three phases | $96.0 million over 5 years | $10.8 million | Broadband for 20,400 rural homes; grant covers about $41 million |
| Smart meter replacement | $14.0 million over 2 years | $7.0 million | About $1.9 million a year in savings; outage detection |
| Three substation rebuilds | $22.0 million over 3 years | $7.3 million | Reliability for about 9,000 members |
| Storm hardening program | $9.0 million a year | $9.0 million | Fewer and shorter outages |
| Billing and customer system | $4.5 million over 18 months | $3.0 million | Replaces a system losing vendor support in 2028 |
| Community solar | $3.0 million | $3.0 million | Member demand; small energy savings |
| Electric vehicle chargers | $0.8 million | $0.16 million | Grant covers 80%; member convenience |
| Warehouse and yard | $6.0 million over 3 years | $2.0 million | Replaces leased storage |
| Total | $42.3 million |
In year one the projects need about $42.3 million net of grants, about $4.3 million more than the limit.
Criteria and Weights
The cooperative's strategic plan names four goals: reliable service, affordable rates, economic development in the territory and member engagement. The criteria and weights below were agreed with the general manager and approved by the board's finance committee before scoring began, which kept anyone from tuning the weights to suit a favorite project.
Criteria and weights
| Criterion | Weight | Meaning of a high score |
|---|---|---|
| Strategic alignment | 25% | Directly advances a plan goal |
| Member benefit | 25% | Large, visible benefit to many members |
| Financial return | 20% | Savings or revenue that pay back the cost |
| Reliability and risk reduction | 20% | Fewer or shorter outages, lower safety or regulatory risk |
| Feasibility | 10% | Skills, vendors and capacity available |
Cooper et al. (1999) found that companies combining several portfolio methods, rather than relying only on financial measures, and applying them consistently tended to achieve better portfolio results. The model above mixes financial and strategic criteria for that reason.
Scores
Weighted scores, 1 to 5 on each criterion
| Project | Strategy | Members | Return | Reliability | Feasibility | Score out of 100 |
|---|---|---|---|---|---|---|
| Smart meters | 4 | 3 | 5 | 4 | 4 | 79 |
| Storm hardening | 3 | 4 | 2 | 5 | 5 | 73 |
| Fiber broadband | 5 | 5 | 2 | 2 | 3 | 72 |
| Substation rebuilds | 3 | 4 | 2 | 5 | 4 | 71 |
| Billing system | 3 | 3 | 3 | 4 | 3 | 64 |
| Community solar | 3 | 3 | 2 | 1 | 4 | 50 |
| Chargers | 3 | 2 | 2 | 1 | 5 | 47 |
| Warehouse | 1 | 1 | 3 | 2 | 4 | 38 |
Smart meters score highest because they pay back through savings on meter reading and truck rolls and also detect outages. Fiber broadband scores highest on strategy and member benefit but lower on return, because even with the grant it takes many years to pay back, and on feasibility, because the cooperative has never run a telecommunications build. Storm hardening and the substations score on reliability. The warehouse would save lease costs but advances no plan goal, and the leased storage it would replace is adequate for at least three more years.
A sensitivity check moved ten points of weight from member benefit to financial return. The top four stayed the top four, though fiber dropped from third to fourth, which suggests the ranking does not hinge on the weights.
Mandatory Work
The billing system scores only 64, but its vendor will end support in 2028, after which the cooperative could not bill members reliably. It is mandatory and is funded first, outside the competition. Storm hardening was also considered for mandatory status, since the board approved it after two winters of long outages, but it is discretionary in pace: the program can be scaled from $9 million to $7 million in a year without breaking a commitment.
Fitting the Constraints
Teller et al. (2012) found that formalizing portfolio management, with clear processes and criteria, was associated with better portfolio results, particularly in portfolios with many interdependent projects. Applying the limit formally, starting from the mandatory billing system and moving down the ranking, the cooperative funds the billing system, smart meters, storm hardening, fiber and the substations, which together need about $37.1 million in year one. Adding the chargers, with their small net cost, brings the total to about $37.3 million. Community solar, at $3 million, would break the limit and moves to year three, when smart meter spending ends. The warehouse is deferred and will be reconsidered in two years.
Money is not the only limit. Engwall and Jerbrant (2003) describe a resource allocation syndrome in multi-project organizations, in which projects compete constantly for the same scarce people and managers spend their time reallocating them. The cooperative's eight engineers cannot design smart meter communications, two substation rebuilds and fiber make-ready at the same time. The second substation rebuild therefore starts in month 13 instead of month 1, after meter design is complete, and fiber make-ready engineering is contracted out for its first phase.
Recommended Portfolio
Portfolio by year, net capital in millions
| Project | Year 1 | Year 2 | Year 3 |
|---|---|---|---|
| Billing system, mandatory | 3.0 | 1.5 | |
| Smart meters | 7.0 | 7.0 | |
| Storm hardening | 9.0 | 9.0 | 9.0 |
| Fiber broadband | 10.8 | 11.2 | 11.6 |
| Substation rebuilds | 7.3 | 7.3 | 7.4 |
| Chargers | 0.2 | ||
| Community solar | 3.0 | ||
| Total | 37.3 | 36.0 | 31.0 |
The portfolio stays within the limit in every year, leaving room in year three for the warehouse if the board wishes to reconsider it.
Conclusion
Scoring all eight projects against the same criteria, funding the billing system as mandatory and applying both the capital limit and the engineers' capacity produces a portfolio that fits: smart meters, storm hardening, fiber, the substations and chargers now, community solar in year three and the warehouse deferred.
References
Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (1999). New product portfolio management: Practices and performance. Journal of Product Innovation Management, 16(4), 333-351. https://doi.org/10.1111/1540-5885.1640333
Engwall, M., & Jerbrant, A. (2003). The resource allocation syndrome: The prime challenge of multi-project management? International Journal of Project Management, 21(6), 403-409. https://doi.org/10.1016/S0263-7863(02)00113-8
Teller, J., Unger, B. N., Kock, A., & Gemünden, H. G. (2012). Formalization of project portfolio management: The moderating role of project portfolio complexity. International Journal of Project Management, 30(5), 596-607. https://doi.org/10.1016/j.ijproman.2012.01.020
What the QSO 440 Module 2 instructions ask for
The QSO 440 Module 2 assignment usually asks students to select a portfolio of projects for an organization. Expect to identify candidate projects with their costs and benefits, define selection criteria and weights tied to strategy, score each project, rank them, apply constraints such as budget, people and capacity, identify mandatory or regulatory projects, recommend the portfolio and explain the sequencing and what is deferred or rejected. Strong assignments base criteria on the organization's goals, explain every score, treat mandatory work separately rather than forcing it through the scoring model, check resource constraints as well as money and show the effect of the choices on the years ahead.
How this QSO 440 Module 2 portfolio selection assignment example is built
The assignment selects the portfolio for Coldwater Valley Electric Cooperative, a fictional member-owned utility in Missouri. Eight projects are scored on strategic alignment, member benefit, financial return, reliability and feasibility. Smart meters rank first at 79, storm hardening 73, fiber broadband 72 and substation rebuilds 71; the billing system scores 64 but is mandatory because vendor support ends in 2028. Net of grants, the eight need about $42.3 million in year one against a $38 million limit. The warehouse is deferred, community solar moves to year three and the second substation rebuild is staggered so engineers are not double-booked. Cooper and colleagues, Teller and colleagues and Engwall and Jerbrant inform the method.
Where the QSO 440 Module 2 rubric puts the points
The QSO 440 portfolio selection assignment is commonly marked on candidate projects described with costs and benefits, criteria and weights tied to strategy, scores explained project by project, mandatory work handled separately, capital and resource constraints applied, a recommended portfolio with sequencing and a clear account of what is deferred. The strongest assignments show that the chosen portfolio fits people as well as money and test whether different weights would change the result. Credit drops when scores are unexplained, mandatory projects are scored like discretionary ones, only the budget is checked or deferred projects simply disappear. Tables, clear writing and APA citations complete the grade.
QSO 440 Module 2 help: the mistakes that cost points
Start by listing every candidate project with its cost by year, its main benefits and the people or equipment it needs. Choose four to six criteria drawn from the organization's strategy, weight them and define what a low and a high score mean. Score each project and explain each score in a sentence. Before ranking, pull out mandatory work, such as regulatory requirements or systems losing support, because it must be funded whatever it scores. Then fit the remaining projects to the money and people available, starting from the top of the ranking, and sequence them so that shared staff are not double-booked. Say what is deferred and when it will be reconsidered. A common mistake is checking only the budget; another is a scoring model that makes the favorite project win.
Get QSO 440 Module 2 written to your instructions
Share the QSO 440 Module 2 instructions and your organization's candidate projects. A writer builds a weighted scoring model, scores each project with reasons, separates mandatory work, applies capital and resource limits, sequences what fits and explains what is deferred and why, citing research on portfolio selection. Your first QSO 440 paper is free, done in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 440 papers and related BS Operations Management samples
- QSO 440 Module 1 Discussion: Why a Co-op Now Needs Portfolio Management
- QSO 440 Module 3 Project One: Designing the Project Management Office
- QSO 440 Module 4 Discussion: Fiber Broadband as a Program, Not a Project
- QSO 440 Module 5 Benefits Realization Assignment: What the Fiber Build Is Supposed to Deliver
- QSO 440 Module 6 Discussion: An Ice Storm Takes Every Line Crew
- QSO 440 Module 7 Project Two: Portfolio Governance and Sponsorship
- QSO 440 Module 8 Discussion: Sustainability as Members See It
- ACC 423 Module 4 Project One: A Beneish M-Score and Red Flag Analysis
- MKT 400 Module 7 Final Project: Strategic Brand Management Plan
- FIN 460 Module 7 Final Project: The Lindqvists' Estate Plan
- FIN 450 Module 8 Discussion: What Would Make the Vances Quit the Plan?
QSO 440 Module 2 questions, answered
Where can I find a free QSO 440 Module 2 Portfolio Selection Assignment sample?
The complete QSO 440 Module 2 assignment is on this page: scoring and selecting an invented electric cooperative's project portfolio.
What is a weighted scoring model?
A way of ranking projects by rating each against agreed criteria, giving the criteria different importance and adding the weighted ratings into one comparable total.
How should mandatory projects be handled in portfolio selection?
They should be identified first and funded outside the competitive scoring, since regulatory, safety or end-of-support work must be done regardless of its score.
What constraints apply in portfolio selection?
Budgets, people with specific skills, equipment, management attention, regulatory windows and dependencies between projects.
Why sequence projects in a portfolio?
So that shared resources are not overloaded, dependencies are respected and the organization's cash and capacity are spread across years.