| Course | QSO 500 Business Research |
|---|---|
| Module | Module 7 |
| Paper type | graduate discussion post on writing survey questions about sensitive topics and reducing bias in answers |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 500 Module 7
Module Seven Discussion
Not "Was Your Credit Bad?"
The first draft of our Harlan Valley survey had a question I am glad nobody saw: "Did you stop the application because you were worried your credit history would not qualify?" It assumes a reason, it suggests the respondent's credit is poor and it asks people to admit something embarrassing to the store that hopes to sell them a sofa.
Tourangeau and Yan (2007) review evidence that respondents misreport on sensitive topics, mostly by underreporting things that might make them look bad, and that misreporting is reduced when questions are self-administered rather than asked by an interviewer and when people trust that their answers are confidential. Krosnick (1999) shows how wording, response options and question order shape answers, often more than researchers expect. Our survey touches three sensitive areas: credit, income and why people left a form that asked for their Social Security number.
The credit question became two questions about beliefs rather than history: "Before starting the application, what did you think applying would do to your credit score?" with options from "lower it a lot" to "not affect it" and "not sure," and "How confident were you that you would be approved?" Income moved to the end, asked in broad bands with a "prefer not to say" option. A draft item, "The application was quick and easy," became two items, one about time and one about difficulty, because a form can be quick but confusing. Questions about the lender gained a "not sure" option, since many customers did not notice the lender's name. Podsakoff et al. (2003) warn that when predictors and outcome all come from the same questionnaire, shared method alone can make them look more closely linked than they are, which is one more reason the study takes abandonment itself from the session data, not from what respondents say.
Six recent applicants, three who finished and three who did not, will answer the draft aloud in cognitive interviews, explaining what each question means to them.
Which of your survey questions might people answer to look good rather than to be accurate?
References
Krosnick, J. A. (1999). Survey research. Annual Review of Psychology, 50, 537-567. https://doi.org/10.1146/annurev.psych.50.1.537
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003). Common method biases in behavioral research: A critical review of the literature and recommended remedies. Journal of Applied Psychology, 88(5), 879-903. https://doi.org/10.1037/0021-9010.88.5.879
Tourangeau, R., & Yan, T. (2007). Sensitive questions in surveys. Psychological Bulletin, 133(5), 859-883. https://doi.org/10.1037/0033-2909.133.5.859
What the QSO 500 Module 7 instructions ask for
The QSO 500 Module 7 discussion usually concerns survey and questionnaire design: writing clear questions, choosing response formats, ordering questions, handling sensitive topics and pretesting. Students are asked to present and critique questions for their study. Strong posts identify specific problems in draft questions, such as leading wording, double-barreled items, vague terms or sensitive content, rewrite them, explain how mode and order affect honesty, plan pretesting such as cognitive interviews and draw on survey research. A helpful reply asks a classmate which of their questions respondents might answer to look good rather than to be accurate.
How this QSO 500 Module 7 discussion example is built
The post rewrites survey questions for a study at Harlan Valley Home Furnishings, a fictional furniture chain whose customers abandon most online financing applications. A draft question asking whether the respondent left because of a poor credit history is replaced with questions about what they believed applying would do to their credit score. Income is asked in broad bands at the end. A question combining time and difficulty is split in two. A not sure option is added for questions about the lender. The survey is self-administered online, and six customers will take part in cognitive interviews before launch. Tourangeau and Yan on sensitive questions, Krosnick on question design and Podsakoff and colleagues on common method bias guide the changes.
Where the QSO 500 Module 7 rubric puts the points
Grading in the QSO 500 Module 7 thread rewards draft questions critiqued for specific problems, rewrites that fix them, thoughtful choices of response format, order and mode, a pretesting plan, survey research that supports each change and replies that point out a classmate's question most likely to draw flattering rather than honest answers. Strong posts show a before and after for each change and explain what the respondent would have felt reading the original. Posts lose marks for general advice about clear questions, rewrites that keep the same problem, ignoring sensitivity, skipping the pretest or replying with agreement only. Grammar and APA citations count too.
QSO 500 Module 7 help: the mistakes that cost points
Start by writing out a few of your draft questions and reading each as a respondent would. Ask whether it could embarrass someone, suggests the right answer, asks two things at once, uses a term people might read differently or asks for something people cannot remember. Rewrite each problem question, and choose response options that cover all answers, including not sure where appropriate. Put sensitive questions later and ask them in broad categories. Choose a mode that lets people answer privately. Then plan a pretest in which a few people answer while saying aloud what they think each question means. A common mistake is asking people why they did something in a way that blames them; another is skipping the pretest. Close by asking classmates which question invites flattering answers.
Get QSO 500 Module 7 written to your instructions
Paste the QSO 500 Module 7 prompt and share your draft survey questions. A writer identifies questions that are sensitive, leading, double-barreled or hard to answer, rewrites them, chooses response formats and mode, plans pretesting such as cognitive interviews and explains each change with survey research, then asks QSO 500 classmates a question. Your first QSO 500 post is free, sent in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 500 papers and related MS Operations Management samples
- QSO 500 Module 1 Discussion: Turning a Dashboard Number Into a Research Problem
- QSO 500 Module 2 Problem Statement Assignment: Why Customers Abandon the Financing Application
- QSO 500 Module 3 Discussion: Finding and Judging Sources
- QSO 500 Module 4 Literature Review: What Research Says About Abandonment, Effort and Trust
- QSO 500 Module 5 Discussion: Numbers, Interviews or Both?
- QSO 500 Module 6 Research Design Assignment: Design, Sample and Power
- QSO 500 Module 8 Measurement and Analysis Plan: Scales, Reliability and the Models to Run
- QSO 500 Module 9 Final Project: The Research Proposal
- QSO 500 Module 10 Discussion: The Ethics of Studying Customers' Finances
- MBA 580 Module 2 Innovation Types Presentation: Incremental versus discontinuous at an automaker
- QSO 625 Module 5 Advanced Analysis Assignment: Modeling Which Picks Go Wrong
- FIN 685 Module 1 Discussion: Why a Roaster Should Hedge at All
- SPT 565 Module 1 Discussion: What Going International Means for a Small Club
QSO 500 Module 7 questions, answered
Where can I find a free QSO 500 Module 7 Discussion sample?
This page holds the full QSO 500 Module 7 post: writing survey questions about credit and privacy for an invented furniture retailer's study.
What is a double-barreled question?
A survey item that combines two issues, such as speed and difficulty, in one sentence, so a single rating cannot reveal which of them the respondent was judging.
How should sensitive questions be asked in surveys?
Privately, usually self-administered, later in the questionnaire, in broad categories and with wording that does not imply judgment of the respondent.
What is social desirability bias?
The tendency of respondents to answer in ways that present themselves favorably, such as underreporting financial trouble, rather than accurately.
What is a cognitive interview?
A pretest in which respondents answer draft questions while explaining how they understood them, revealing confusing wording before the survey is fielded.