| Course | SPT 111 Introduction to Sport Management |
|---|---|
| Module | Module 6 |
| Paper type | undergraduate assignment building a program budget with fixed and variable costs, pricing and a break-even analysis, testing it against capacity and risks and recommending whether to launch |
| Length | About 1,070 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 111 Module 6
Twenty-Three Teams to Break Even: A Budget for Cedar Hollow's Winter Futsal League
[Student Name]
Southern New Hampshire University
SPT 111: Introduction to Sport Management
Budget Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Twenty-Three Teams to Break Even: A Budget for Cedar Hollow's Winter Futsal League
Introduction
Milestone Two found that Cedar Hollow Sportsplex's fieldhouse is busy on weekends and evenings but often idle at other times. One of those times is Sunday evening in winter: tournaments end by 4 p.m., and the courts sit empty from 4 to 9 p.m. from January through March. The director of leagues and camps has proposed a winter futsal league for youth club and recreation teams, played on the basketball courts with a smaller ball and smaller goals. This paper builds a budget for the league, finds the number of teams it needs to break even, checks capacity, tests the budget against risks and recommends whether to launch.
Assumptions
The league would run for ten Sundays from mid-January to late March. Each team would play nine games of about 50 minutes, with one Sunday kept as a makeup date for snow. Four courts would be used from 4 to 9 p.m., giving five game slots per court each Sunday. The fee of $650 per team is based on what two nearby indoor soccer facilities charge for similar leagues, $700 and $725, set slightly lower to attract teams in the first season. Cost estimates come from Cedar Hollow's current referee and scorekeeper rates, its utility bills for Sunday evenings and quotes for trophies and insurance.
Costs
Variable costs per team
| Item | Cost | |
|---|---|---|
| Marketing: flyers, social media ads, club emails | $1,200 | |
| League coordinator stipend | $3,000 | |
| Trophies and medals | $900 | |
| Insurance rider for the league | $1,700 | |
| Total fixed costs | $6,800 | |
| Item | Calculation | Cost per team |
| Referees | 4.5 games per team (each game has two teams) x $40 per game | $180 |
| Scorekeepers | 4.5 games x $14 per game hour | $63 |
| Utilities and court costs | 4.5 games x $22 per court hour | $99 |
| Total variable cost per team | $342 |
Because each game involves two teams, each team's share of game costs is half of nine games, or 4.5 games' worth.
Contribution and Break-Even
Each team pays $650 and costs $342 in variable costs, so each team contributes $308 toward fixed costs. Dividing the fixed costs of $6,800 by $308 gives about 22.1, so the league needs 23 teams to break even.
Results at different enrollments
| Teams | Revenue | Variable costs | Fixed costs | Profit or loss |
|---|---|---|---|---|
| 20 | $13,000 | $6,840 | $6,800 | -$640 |
| 23 | $14,950 | $7,866 | $6,800 | $284 |
| 32 (expected) | $20,800 | $10,944 | $6,800 | $3,056 |
| 40 | $26,000 | $13,680 | $6,800 | $5,520 |
The expected enrollment of 32 teams comes from a quick survey of 14 club directors and the league director's estimate of recreation teams, and it would produce about $3,056 of profit. Concession sales on Sunday evenings would add perhaps $1,500 more in margin, but the budget does not count them, so the decision does not depend on them.
Capacity
Four courts with five slots on each of nine playing Sundays give 180 game slots. Each game uses one slot and serves two teams, so the courts can host 360 team-games. With each team playing nine games, capacity is 40 teams on nine Sundays, or about 44 if the makeup Sunday is also used for regular games. Thirty-two teams fit comfortably, leaving room for growth and makeups. Staffing is also feasible: the referee assignor confirmed that Sunday evening is easier to cover than Saturday morning, and scorekeepers can be drawn from current part-time staff who want winter hours.
Sensitivity
Profit under different assumptions, 32 teams unless noted
| Scenario | Change | Profit |
|---|---|---|
| Base case | none | $3,056 |
| Fewer teams | 26 teams | $1,208 |
| Higher referee pay | $50 per game instead of $40 | $1,616 |
| Snow costs one extra week | Makeup games on a weeknight with overtime staff, about $900 | $2,156 |
| Combined bad case | 26 teams, $50 referees, extra week | about -$862 |
The league stays profitable under any single setback and loses a little under a combination of them. The biggest risk is enrollment, which is why the recommendation sets a minimum. Wicker and Breuer (2011) found that sport clubs facing shortages of money, volunteers or facilities at the same time were most likely to struggle, and Cedar Hollow's risk is similar on a small scale: if snow, staffing and enrollment problems arrive together, the league would lose money.
Cash Timing
A budget can balance over a season and still cause trouble if money goes out before it comes in. For the futsal league, marketing costs of $1,200 and the insurance rider of $1,700 must be paid in November and December, before most fees arrive. Team fees are due at registration in December, so by January the league would hold most of its revenue before paying referees, scorekeepers and utilities week by week. Trophies are paid in March. The only period of risk is the six weeks before the deadline, when about $2,900 is spent on a league that might not launch. That amount is the real cost of trying, and it is small enough for Cedar Hollow to absorb if registrations fall short.
Comparing Alternatives
Wicker et al. (2013) found that the availability of suitable sport facilities near people's homes was linked to participation in several sports, which supports the idea that idle courts can create new participation if programs are offered. The futsal league is one way to use winter Sunday evenings; another is extending adult volleyball, which earns less per court hour but needs fewer staff. The weekday multi-sport program for young children proposed in Milestone Two uses different hours and different staff, so it does not compete with the league for space. The futsal league is the stronger choice for Sunday evenings because club teams want winter touches on the ball, and small events like this one fit what Gibson et al. (2012) describe as events that use existing facilities without new investment.
Recommendation
The futsal league should be launched for this winter if at least 24 teams register by the December 15 deadline, one more than break-even to allow for a dropout. If registrations fall short, the league should be postponed, the marketing costs written off and the courts offered for adult volleyball. The coordinator stipend should not be committed until the minimum is reached.
Conclusion
The winter futsal league needs 23 teams to break even at $650 per team, can hold about 44 and is expected to draw 32, earning about $3,000 before concessions. It stays profitable through any single setback and loses a little in a combined bad case. Launching with a 24-team minimum by the registration deadline turns idle Sunday courts into a program that pays its own way.
References
Gibson, H. J., Kaplanidou, K., & Kang, S. J. (2012). Small-scale event sport tourism: A case study in sustainable tourism. Sport Management Review, 15(2), 160-170. https://doi.org/10.1016/j.smr.2011.08.013
Wicker, P., & Breuer, C. (2011). Scarcity of resources in German non-profit sport clubs. Sport Management Review, 14(2), 188-201. https://doi.org/10.1016/j.smr.2010.09.001
Wicker, P., Hallmann, K., & Breuer, C. (2013). Analyzing the impact of sport infrastructure on sport participation using geo-coded data: Evidence from multi-level models. Sport Management Review, 16(1), 54-67. https://doi.org/10.1016/j.smr.2012.05.001
What the SPT 111 Module 6 instructions ask for
The SPT 111 Module 6 assignment typically asks students to apply basic financial management to a sport organization, often by preparing a budget for a program, event or department. Expect to estimate revenues and expenses, separate fixed costs from variable costs, set prices, calculate profit or loss and explain the assumptions behind the numbers. Strong papers show every calculation, find the break-even point, check whether the facility and staff can actually handle the volume, test what happens if key assumptions change, compare the program with other uses of the same resources and end with a clear recommendation and conditions for going ahead. Explaining where each figure came from matters as much as the arithmetic.
How this SPT 111 Module 6 budget assignment example is built
The assignment budgets a proposed Sunday-evening winter futsal league at Cedar Hollow Sportsplex, a fictional youth complex outside Dayton, Ohio. At $650 per team for nine games, fixed costs of about $6,800 and variable costs of about $342 per team give a contribution of about $308 and a break-even of 23 teams. Four courts over ten Sundays allow about 44 teams, and the expected 32 teams would earn about $3,056 plus concessions. The budget is tested against fewer teams, higher referee pay and snow-canceled weeks, compared with the weekday multi-sport program from Milestone Two and recommended with a 24-team minimum at the registration deadline. Wicker and colleagues, Wicker and Breuer and Gibson and colleagues are cited.
Where the SPT 111 Module 6 rubric puts the points
Grading in the SPT 111 budget assignment usually rewards realistic revenue and cost estimates with sources, a correct split of fixed and variable costs, accurate contribution and break-even calculations, a capacity check, sensitivity to key assumptions, comparison with alternative uses of the resources, a clear recommendation and readable presentation. Papers stand out when the numbers tell a manager exactly what must be true for the program to succeed. They lose credit for arithmetic errors, for budgets that list costs without separating fixed and variable, for ignoring capacity or for recommending launch without conditions. Budget tables, APA references and clear explanations complete the grade.
SPT 111 Module 6 help: the mistakes that cost points
List every cost and ask whether it changes with the number of participants: referees and supplies usually do, marketing and stipends usually do not. Set a price and find the contribution, price minus variable cost per unit. Divide fixed costs by contribution to get break-even. Then check capacity: can your facility and staff handle the number you need? Change your key assumptions, such as enrollment or a cost rate, and see what happens. Compare the program with another use of the same space or staff. Recommend a decision with a condition, such as a minimum enrollment by a date. Papers often show a profit at the expected number and stop; managers need to know how far that number can fall.
Get SPT 111 Module 6 written to your instructions
Share the SPT 111 Module 6 instructions and the program or event you are budgeting. A writer separates fixed and variable costs, sets a price, calculates contribution and break-even, checks capacity, tests the budget against realistic risks, compares alternatives and recommends whether to proceed, with sport management research behind it. Your first SPT 111 assignment comes free and is normally back in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 111 papers and related BS Sport Management samples
- SPT 111 Module 1 Discussion: Why a Youth Complex Is a Sport Business
- SPT 111 Module 2 Industry Segment Assignment: Where Cedar Hollow Competes
- SPT 111 Module 3 Milestone One: Mission, Structure and People
- SPT 111 Module 4 Discussion: Parents on the Sideline
- SPT 111 Module 5 Milestone Two: Programs, Marketing and Livestreams
- QSO 420 Module 1 Discussion: Why Cost and Schedule Must Be Controlled Together
- FIN 350 Module 2 Client Spotlight Reflection: One Month of the Kesslers' Statements
- INT 113 Module 3 Milestone One: Trade Rules Between Bozeman and Tokyo
- HRM 310 Module 3 Milestone One: An Organizing Drive and a Lawful Response
SPT 111 Module 6 questions, answered
Where can I find a free SPT 111 Module 6 budget sample?
This page holds the complete SPT 111 Module 6 assignment: a break-even budget for an invented sports complex's winter futsal league.
What is a break-even point?
The number of units, such as teams or tickets, at which total revenue equals total costs, so the program neither earns nor loses money.
How do fixed and variable costs differ?
Fixed costs stay the same regardless of volume, such as a coordinator stipend; variable costs rise with each unit, such as referee fees per game.
What is contribution margin?
The price per unit minus the variable cost per unit, which is the amount each unit contributes to covering fixed costs.
What is a sensitivity analysis in a budget?
Rerunning the numbers with a worse enrollment, a pricier referee or a lost week to see how far profit can slip before it turns into a loss.