SPT 208 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This SPT 208 Module 4 Discussion sample evaluates potential sponsors for a new sport product by how well they fit it, what audience they want and what image would pass between sponsor and event, and chooses which to approach first. SNHU SPT 208 (SPT-208) treats sponsorship as a core part of the BS Sport Management marketing plan. The product is the Hoarfrost Fat Bike Series, an invented set of winter races planned by Ironwood Trail Co., a Duluth cycling apparel maker. Five possible sponsors are compared, and the one offering the most money is not the one the writer would call first.

CourseSPT 208 Sport Marketing
ModuleModule 4
Paper typeundergraduate discussion post evaluating potential sponsors for a new sport product by fit, audience and image transfer, and choosing which to approach first
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 208 Module 4

1

Module Four Discussion

The Biggest Check Is Not the Best Fit

The Hoarfrost Fat Bike Series needs about $95,000 in sponsorship in its first season. I listed five realistic candidates: a regional craft brewery with taprooms in Duluth and Marquette, a national energy drink brand that sponsors extreme sports, a regional health system with hospitals in all four host areas, a regional lodging chain with hotels near three of the venues and a regional bank.

What this page is doingThe candidates.
2

In the survey work of Speed and Thompson (2000), goodwill toward a sponsor rose with three things: a sensible match to the event, prior liking for the company and a belief that it backed the event for more than a sales pitch. Gwinner and Eaton (1999) showed that the image of an event transfers to its sponsor more strongly when the two are similar in function or image. Cornwell et al. (2005) trace sponsorship effects to the mental work spectators do in connecting a brand to an event, and a pairing that needs explaining is a pairing people forget.

By those tests, the energy drink brand offers the most money but the weakest fit. Its image is extreme and competitive; ours is welcoming and warm. Riders new to racing might read its banners as a sign that the series is not for them. The brewery fits the post-race gathering and our adult riders, but it complicates an event with a kids' ride and could limit some family sponsors. The bank fits loosely. The two best fits are the health system, whose community health and injury prevention work matches winter safety and active living, and the lodging chain, which directly solves the travel barrier our research found.

What this page is doingJudging fit.
3

I would approach the health system first, as a presenting sponsor, because its fit is natural and sincere: it could run a winter safety and cold injury clinic at each stop and staff the medical tent, which riders would value. The lodging chain comes second, as an official lodging partner with discounted rooms. The brewery could sponsor the post-race gathering in an adults-only area.

What this page is doingWhom I would call first.
4

Which sponsor for your product looks best on paper but fits worst in practice?

What this page is doingFor classmates.
5

References

Cornwell, T. B., Weeks, C. S., & Roy, D. P. (2005). Sponsorship-linked marketing: Opening the black box. Journal of Advertising, 34(2), 21-42. https://doi.org/10.1080/00913367.2005.10639194

Gwinner, K. P., & Eaton, J. (1999). Building brand image through event sponsorship: The role of image transfer. Journal of Advertising, 28(4), 47-57. https://doi.org/10.1080/00913367.1999.10673595

Speed, R., & Thompson, P. (2000). Determinants of sports sponsorship response. Journal of the Academy of Marketing Science, 28(2), 226-238. https://doi.org/10.1177/0092070300282004

What the SPT 208 Module 4 instructions ask for

The fourth SPT 208 discussion usually asks students to consider sponsorship for a sport product, often the one in their marketing plan. Expect to identify potential sponsors, explain what each might gain and evaluate how well they fit the product and its audience. Good posts compare several realistic sponsors rather than naming the largest brands they can think of, judge fit on audience, values and image rather than on money alone, consider what each sponsor would need to see to say yes and recognize risks, such as an image that clashes with the event or audience. They use research on how sponsorship affects consumers to explain their reasoning. Replies should suggest a sponsor a classmate may have missed or question a weak fit.

How this SPT 208 Module 4 discussion example is built

The post weighs five sponsors for the Hoarfrost Fat Bike Series, a fictional four-race winter series planned by Ironwood Trail Co., a Duluth, Minnesota apparel maker: a craft brewery, an energy drink brand, a regional health system, a lodging chain and a bank. Each is judged on fit with a friendly winter race for recreational riders and families, what it would want and the image that would transfer. The energy drink offers the most money but the weakest fit, the brewery fits the after-party but complicates a family event and the health system and lodging chain fit best, one through winter safety and the other by solving the travel barrier. Speed and Thompson, Gwinner and Eaton and Cornwell and colleagues are cited.

Where the SPT 208 Module 4 rubric puts the points

The fourth SPT 208 thread rewards realistic sponsor candidates, a comparison based on fit, audience and image rather than money alone, attention to what sponsors need in return, recognition of risks, a reasoned choice of whom to approach first and use of sponsorship research. Posts score well when the reasoning would convince a sponsor's marketing manager. They lose marks for listing famous brands with no connection to the product, for judging sponsors only by budget or for ignoring how a sponsor's image might clash with the event. Replies that suggest a better-fitting sponsor earn the most. APA citations and a focused post complete the grade.

SPT 208 Module 4 help: the mistakes that cost points

List four or five realistic sponsors, including local and regional companies, not only national brands. For each, ask who its customers are and whether they overlap with your audience, what the sponsor wants to be known for and whether your product helps, and what the sponsor would need in return. Think about image: what would people believe about the sponsor after seeing it at your event, and about your event after seeing the sponsor? Note any risks. Then choose whom to approach first and explain why. Posts often chase the biggest name; the best sponsors are often the ones whose customers are already standing at your start line.

Get SPT 208 Module 4 written to your instructions

Paste the SPT 208 Module 4 prompt and describe your sport product and possible sponsors. A writer compares them on fit, audience, image transfer and what each would want in return, recommends which to approach first and supports the choice with sponsorship research, then poses a question for classmates about their own partners. Your first SPT 208 post is free and generally back in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 208 papers and related BS Sport Management samples

SPT 208 Module 4 questions, answered

Where can I find a free SPT 208 Module 4 Discussion sample?

The complete SPT 208 Module 4 post is on this page, comparing sponsors for an invented winter fat-bike race series.

What is sponsor fit?

How naturally a sponsor matches an event or team in audience, values, products and image, which affects how consumers respond.

What is image transfer in sponsorship?

The process by which associations people hold about an event or team become linked to the sponsor, and sometimes the reverse.

What do sponsors want from a sport event?

Exposure to a target audience, associations that support their brand, opportunities to sell or sample and ways to engage employees or customers.

Can a sponsor hurt a sport event's image?

Yes. A sponsor whose image conflicts with the event's values or audience can weaken trust in the event.