| Course | ACC 640 Auditing |
|---|---|
| Module | Module 8 |
| Paper type | graduate audit sampling assignment using monetary unit sampling |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Accounting |
| Updated | October 2026 |
Free sample paper for ACC 640 Module 8
Monetary Unit Sample for Wholesale Accounts Receivable
[Student Name]
Southern New Hampshire University
ACC 640: Auditing
Module Eight Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Monetary Unit Sample for Wholesale Accounts Receivable
Objective and Population
The objective is to obtain evidence that wholesale accounts receivable at December 31 are not materially overstated, addressing existence and valuation. The population is the $46.0 million of balances due from 412 retail customers. The sampling unit is the individual dollar, so larger balances are more likely to be selected, which suits an overstatement test. Balances are tested by confirmation under AS 2310 and, where a customer does not reply, by matching January payments and proof of delivery to the open invoices. The sample is designed under AS 2315 (Public Company Accounting Oversight Board, 2016).
Why Monetary Unit Sampling
Monetary unit sampling fits this test for three reasons. The main risk is overstatement, from credits not posted or sales recorded without delivery, and selecting by dollar gives large balances more weight, which is where overstatement would matter. The population has a few large national retailers and hundreds of small independent outfitters, a skewed distribution that would require stratification under classical variables sampling. And few misstatements are expected, the condition under which the method produces efficient sample sizes. Its weakness is that it is poorly suited to finding understatements and zero balances, so completeness of receivables is covered separately by the cutoff tests and the revenue analytics.
Planning the Sample
Tolerable misstatement is $660,000, equal to performance materiality. Expected misstatement is $100,000, based on the predecessor's working papers, which showed small pricing differences each year. The risk of incorrect acceptance is 10 percent, a 90 percent confidence level, because the risk of material misstatement in wholesale receivables was assessed as moderate and other procedures, analytics and cutoff tests, also provide evidence. The firm's tables give a 2.31 reliability factor for zero misstatements at that confidence, with 1.5 as the expansion factor.
To size the sample, the book value is multiplied by the reliability factor and the result is divided by tolerable misstatement after subtracting expected misstatement scaled by the expansion factor: $46,000,000 times 2.31, or $106,260,000, divided by $660,000 less $150,000, or $510,000, which gives 208.4, rounded up to 209. The sampling interval is $46,000,000 divided by 209, $220,096. Starting from a random dollar, every 220,096th dollar after it is picked; three accounts larger than the interval are selected automatically and examined in full.
Results
Of 209 selections, 192 confirmations were returned; the 17 nonresponses were cleared with January cash receipts and shipping records, and none of those alternative tests found a difference. Three differences were found.
Misstatements found
| Account | Book value | Audited value | Misstatement | Tainting |
|---|---|---|---|---|
| Sporting goods chain, Midwest | $48,000 | $45,600 | $2,400 | 5 percent |
| Independent outfitter, Montana | $12,500 | $0 | $12,500 | 100 percent |
| National retailer, top stratum | $310,000 | $302,000 | $8,000 | Not projected |
The first difference is a pricing error: the customer was billed list price instead of its contract price. The second is more serious: the customer returned the whole order in November, the goods are back in the warehouse, but the credit memo was never posted. The third is a similar unposted credit on a large account examined in full, so its $8,000 is an actual misstatement, not projected.
Projection and Upper Limit
Misstatements in items smaller than the interval are projected by multiplying the tainting by the interval: $11,005 for the 5 percent tainting and $220,096 for the 100 percent tainting, $231,101 in total. Adding the actual $8,000 from the top stratum gives projected misstatement of $239,101.
Sampling risk is covered by adding basic precision and incremental allowances. Basic precision is the reliability factor for zero misstatements times the interval, 2.31 times $220,096, or $508,421. Incremental allowances apply to taintings ranked from largest to smallest: the increase in the factor from zero to one misstatement, 1.58, less one, times the interval and the 100 percent tainting gives $127,656; the increase from one to two, 1.44, less one, times the interval and the 5 percent tainting gives $4,842.
Upper misstatement limit
| Component | Amount |
|---|---|
| Projected misstatement, sampled items | $231,101 |
| Actual misstatement, top stratum | 8,000 |
| Basic precision | 508,421 |
| Incremental allowance | 132,498 |
| Upper misstatement limit | $880,020 |
| Tolerable misstatement | $660,000 |
Links to Other Accounts
An unposted return credit overstates receivables, but it also overstates revenue and understates inventory, since the returned goods are back in the warehouse but not in the inventory records. The two credits found total $20,500 at selling prices, with about $11,000 of cost. If the problem is widespread, it also affects the returns reserve, because management's reserve estimates returns not yet received, and returns already received but not credited fall between the two calculations. The inventory team will compare warehouse receiving logs for returned wholesale goods with the inventory records, and the revenue team will treat wholesale returns as part of the significant risk identified for the returns reserve rather than as a separate issue.
Conclusion and Response
The upper limit of $880,020 exceeds tolerable misstatement, so the sample does not support the conclusion that receivables are not materially overstated. AS 2315 requires the auditor to consider the nature and cause of misstatements, not only their amount. Two of the three differences are unposted return credits, which suggests a systematic problem rather than random error, and it connects to the returns risk identified in planning: when the customer service team approves a wholesale return, the credit memo depends on a manual request to accounting. Elder et al. (2013) note that evaluating the qualitative character of sample errors is one of the weaker areas of practice, which is why the cause deserves as much attention as the projection.
Expanding the sample would not address a systematic cause efficiently. Instead, we will ask management to compare all wholesale returns received at the warehouses since October with posted credit memos and correct any missing credits; we will test that analysis by selecting returns from warehouse receiving records and tracing them forward. If the corrected balance and our testing of the analysis bring the remaining likely misstatement well below tolerable misstatement, the account can be accepted. We will also report the missing control over wholesale return credits as a deficiency and consider whether it rises to a significant deficiency (Arens et al., 2020).
References
Arens, A. A., Elder, R. J., Beasley, M. S., & Hogan, C. E. (2020). Auditing and assurance services (17th ed.). Pearson.
Elder, R. J., Akresh, A. D., Glover, S. M., Higgs, J. L., & Liljegren, J. (2013). Audit sampling research: A synthesis and implications for future research. Auditing: A Journal of Practice & Theory, 32(Supplement 1), 99-129. https://doi.org/10.2308/ajpt-50394
Public Company Accounting Oversight Board. (2016). Audit sampling (AS 2315). Author.
What the ACC 640 Module 8 instructions ask for
The Module Eight assignment in ACC 640 usually asks you to design and evaluate an audit sample, most often monetary unit sampling for a balance such as receivables or inventory. Plan to state the objective, define the population and sampling unit, set tolerable and expected misstatement and the risk of incorrect acceptance, compute the sample size and interval, select items, and evaluate the results by projecting misstatements and computing an upper misstatement limit. Many versions then ask what the auditor should do if the limit exceeds tolerable misstatement. Show every formula and factor, and explain the qualitative nature of each misstatement, since the cause often matters as much as the amount. A clean table of misstatements makes the evaluation easy to check.
How this ACC 640 Module 8 audit sampling assignment example is built
The paper samples $46 million of wholesale receivables at 90 percent confidence, with tolerable misstatement of $660,000 and expected misstatement of $100,000, giving a sample of 209 and an interval of $220,096. Confirmations reveal a 5 percent pricing difference on one account, a $12,500 balance that should have been zero because a return credit was never posted, and an $8,000 difference on a large account examined in full. Projected misstatement is $239,101, and the upper limit, $880,020, exceeds tolerable misstatement. Because the zero balance points to a systematic problem with return credits, the paper asks management to analyze all open credits before any sample expansion, and it traces the finding back to the returns reserve and revenue.
Where the ACC 640 Module 8 rubric puts the points
Rubrics for the audit sampling assignment typically score the sampling plan, the sample size computation, selection, evaluation of misstatements, projection, the upper misstatement limit, the conclusion and consideration of qualitative factors. Top papers justify each input, handle items larger than the interval correctly, compute basic precision and incremental allowances in the right order and explain the cause and implications of misstatements. Graders also reward appropriate responses when the limit exceeds tolerable misstatement and links from the findings to other accounts. Common deductions include projecting top-stratum differences, ranking taintings incorrectly, accepting the population without comparing the limit with tolerable misstatement and ignoring what a misstatement's cause suggests.
ACC 640 Module 8 help: the mistakes that cost points
Sampling papers most often slip on the evaluation: misstatements in items at or above the interval are added at their actual amount, not projected, while smaller items are projected using their tainting percentage times the interval. A second weak spot is the incremental allowance, which applies the factor increments to taintings ranked from largest to smallest. If your assignment uses classical variables or attribute sampling instead, the logic of planning, selection and evaluation is the same with different formulas. Write out each tainting as a percentage before projecting; it makes the projection and the ranking easy to check. Then compare the limit with tolerable misstatement before drawing any conclusion.
Get ACC 640 Module 8 written to your instructions
Send the ACC 640 Module 8 assignment and the sampling data. The paper will design the sample, compute the size and interval, project the misstatements, calculate the upper limit and explain the conclusion with the standards behind each step. Plan on roughly two days; your first costs nothing. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More ACC 640 papers and related MS Accounting samples
- ACC 640 Module 1 Discussion: Who Audits the Auditors?
- ACC 640 Module 2 Client Acceptance Assignment: Taking Over After a Resignation
- ACC 640 Module 3 Milestone One: Materiality and the Risks That Matter
- ACC 640 Module 4 Discussion: Skepticism and the Returns Reserve
- ACC 640 Module 5 Internal Control Assignment: Controls Over Online Sales
- ACC 640 Module 6 Milestone Two: Inventory at Someone Else's Warehouse
- ACC 640 Module 7 Discussion: Testing Every Order With Data Analytics
- ACC 640 Module 9 Milestone Three: Completing the Audit
- ACC 640 Module 10 Final Project: The Audit Plan and Critical Audit Matters
- MGT 605 Module 9 Discussion: Low Bid or Construction Manager at Risk
- SPT 700 Module 6 Strategic Options Assignment: Four Ways to Keep Referees
- QSO 530 Module 10 Discussion: Reporting Numbers Honestly
- OL 665 Module 6 Discussion: Recruiting and Keeping Volunteers
ACC 640 Module 8 questions, answered
Where can I find a free ACC 640 Module 8 Audit Sampling sample?
This page includes a full ACC 640 Module 8 monetary unit sampling assignment for receivables with projection and upper limit.
How is the monetary unit sample size computed?
Multiply the population's book value by the reliability factor, then divide by the gap between tolerable misstatement and expected misstatement scaled up by an expansion factor.
What is tainting?
The misstatement in a sampled item as a percentage of its book value, used to project the misstatement to the sampling interval.
What is the upper misstatement limit?
The projected misstatement plus an allowance for sampling risk, made up of basic precision and incremental allowances; it is compared with tolerable misstatement.
What should an auditor do if the upper limit exceeds tolerable misstatement?
Investigate the cause, consider whether the misstatement is systematic, ask management to correct or analyze the population, expand testing or perform alternative procedures, and reassess the risk assessment.