FIN 450 Module 5 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This FIN 450 Module 5 Milestone Two sample builds the fixed income part of a client's portfolio and tests how it would react to changing interest rates. SNHU FIN 450 (FIN-450) assigns this second milestone in Module Five of its BS Finance course on investment portfolio analysis. For the composite Vances of Greenville, the paper fills a $243,200 bond allocation from the funds in a 401(k) menu, comparing yield, duration, credit quality and cost. It estimates the loss from a one-point rise in rates, explains why the long horizon turns that loss into a later gain, rejects a high-yield fund and sets up a short Treasury ladder for tuition.

CourseFIN 450 Investment Portfolio Analysis
ModuleModule 5
Paper typeundergraduate milestone on fixed income portfolio construction
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Finance
UpdatedOctober 2026

Free sample paper for FIN 450 Module 5

1

Fixed Income Strategy for the Vance Portfolio

[Student Name]

Southern New Hampshire University

FIN 450: Investment Portfolio Analysis

Milestone Two

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingFund yields and durations are illustrative figures for the case period; the clients are composites.
2

Fixed Income Strategy for the Vance Portfolio

Introduction

Milestone One assigned 38 percent of the Vances' money to fixed income, $243,200 split between nominal and inflation-linked bonds, to be held in Teresa's 401(k) for tax reasons. Bonds in this portfolio have one main job: to hold their value, or rise, when stocks fall, so that the Vances can stay invested and rebalance into stocks after a decline. A second job is to protect against inflation. Yield matters, but it comes third.

What this page is doingThe bond sleeve's job.
3

The Options in the 401(k) Menu

Bond choices in Teresa's 401(k)

FundYieldDurationCredit qualityExpense ratio
Total bond index4.4%6.0 yearsMostly Treasury, agency and investment grade0.03%
Stable value3.3% crediting rateNot priced dailyInsurance contracts0.30%
Inflation-protected bond index1.9% real, plus inflation6.5 yearsU.S. Treasury0.05%
High-yield bond fund (active)7.1%3.2 yearsBelow investment grade0.72%

Litterman and Scheinkman (1991) found that a single factor, a parallel rise or fall of the whole curve, accounts for the bulk of what Treasury holders earn or lose, with smaller effects from changes in the slope and curvature of the yield curve. For a broad bond fund, duration therefore captures most of the interest rate risk.

What this page is doingFour funds, four different risks.
4

Core Bonds

For 0.03 percent a year, the index fund spreads the money across several thousand government, mortgage-backed and high-grade company issues. Its yield of about 4.4 percent is higher than the stable value fund's crediting rate, and its prices move daily, which is what lets it rise when stocks crash and investors seek safety. The stable value fund offers a smooth ride and suits money that may be needed soon, but its 0.30 percent fee and lower rate make it a weaker long-term holding for money that will not be touched until 2041. The policy allows the sleeve to hold some stable value later, as retirement approaches.

What this page is doingWhy the index fund wins.
5

Inflation-Protected Bonds

The inflation-protected fund holds Treasury securities whose principal rises with the consumer price index. Its real yield of about 1.9 percent means it should earn that much above inflation if held to maturity. For the Vances, whose retirement goal is set in today's dollars, the fund protects the part of the plan that ordinary bonds cannot. It does carry rate risk, through a duration of about 6.5 years, but its value moves with real rates rather than with inflation surprises.

What this page is doingThe second layer.
6

Rate Risk in Dollars

The sleeve's weighted duration is about 6.1 years: $192,000 at 6.0 years and $51,200 at 6.5 years. If rates rose by one percentage point across the curve, the approximate loss would be:

$243,200 x 6.1 x 0.01 = about $14,800.

That loss is real but temporary for a long-horizon investor. Fisher and Weil (1971) showed that when an investor's horizon equals the duration of a bond portfolio, the gains from reinvesting coupons at higher rates offset the price loss, so the value at the horizon is protected. The Vances' horizon of fifteen years is more than twice the sleeve's duration, so a rise in rates would, after about six years, leave them with more money at retirement than if rates had stayed put. Falling rates would do the reverse: an immediate gain, then lower income.

What this page is doingWhat a one-point rise would do.
7

The High-Yield Question

The high-yield fund's 7.1 percent yield is tempting. But high-yield bonds are partly a claim on the issuing companies' success, and Fama and French (1993) found that corporate bond returns share a default factor that is tied to the same economic forces that drive stocks. In practice, high-yield bonds fell by about a quarter in 2008, when the core bond index rose. Holding them would weaken the main job of the sleeve, protection during a stock market crash, and the fund's 0.72 percent fee would consume a tenth of its yield. If the Vances want more return, the cleaner way is a slightly higher stock weight, which the policy statement does not currently allow.

What this page is doingWhy it is left out.
8

Matching the Tuition Bills

The policy statement noted that up to $25,000 in the brokerage account would be set aside for college costs not covered by the 529 plan. A bond fund is not the right tool for a bill due on a known date, because its price on that date is unknown. Instead, the paper recommends four Treasury notes or bills of about $6,250 each, maturing in July 2029, 2030, 2031 and 2032, just before each fall term. Interest on Treasury securities is free of South Carolina income tax. The ladder will be bought in 2028, when the money is moved from the screened stock ETF, so the shift happens gradually and in a year chosen to manage capital gains.

What this page is doingA ladder outside the 401(k).
9

The Bond Sleeve

Recommended fixed income holdings

AccountHoldingAmountPurpose
Teresa's 401(k)Total bond index fund$192,000Core ballast against stock declines
Teresa's 401(k)Inflation-protected bond index fund$51,200Protection of real purchasing power
Joint brokerage, from 2028Treasury ladder, 2029 to 2032About $25,000Tuition gap, matched to due dates
What this page is doingFinal holdings.
10

How the Sleeve Will Change Over Time

The bond sleeve described here fits an investor fifteen years from spending the money. It will not fit the Vances in 2040. As retirement approaches, the policy statement will be revised to hold a larger bond share and a shorter duration, because the first years of withdrawals will come partly from bonds and a large price drop just before them would force sales at a loss. A reasonable path is to begin moving part of the core bond fund into the stable value fund around 2036, about five years out, until roughly two years of planned withdrawals sit there. The inflation-protected share may also grow, since retirees spend in real terms. Writing these shifts into the plan now means the change happens on a schedule rather than in reaction to a bad year in the bond market.

What this page is doingPlanned shifts before retirement.
11

Conclusion

The bond sleeve uses two low-cost index funds with a combined duration near six years, inside a horizon that turns rate rises into long-run gains. It leaves out high-yield bonds because they fail when protection is needed most, and it handles the one known near-term bill with bonds that mature on time. Milestone Three will test the whole portfolio against a market shock.

What this page is doingWhat Milestone Two settles.
12

References

Fama, E. F., & French, K. R. (1993). Common risk factors in the returns on stocks and bonds. Journal of Financial Economics, 33(1), 3-56. https://doi.org/10.1016/0304-405X(93)90023-5

Fisher, L., & Weil, R. L. (1971). Coping with the risk of interest-rate fluctuations: Returns to bondholders from naive and optimal strategies. The Journal of Business, 44(4), 408-431. https://doi.org/10.1086/295402

Litterman, R., & Scheinkman, J. (1991). Common factors affecting bond returns. The Journal of Fixed Income, 1(1), 54-61. https://doi.org/10.3905/jfi.1991.692347

What the FIN 450 Module 5 instructions ask for

Milestone Two in FIN 450 usually turns to fixed income. Expect to explain the role bonds play in the client's portfolio, to compare bond funds or individual bonds on yield, duration, credit quality and cost, and to show how the bond holdings would respond to a change in interest rates. Many versions also ask how the bond sleeve handles a known future cash need, through a ladder or by matching duration to the date of the need, and whether riskier bonds such as high yield belong in the mix. A strong milestone uses the bond choices available to the client, calculates the price effect of a rate change in dollars and explains how the bond sleeve supports the risk objective in the policy statement.

How this FIN 450 Module 5 milestone two example is built

The sample places the Vances' $192,000 of core bonds and $51,200 of inflation-protected bonds in Teresa's 401(k), which offers four bond options. It chooses the total bond index fund, with a duration of about 6.0 years and a yield of about 4.4 percent, and the plan's inflation-protected fund, giving the sleeve a duration of about 6.1 years. A one-point rise in rates would cut its value by about $14,800, but the paper explains that reinvesting at higher yields would recover that loss within about six years, well inside the Vances' fifteen-year horizon. The high-yield fund is rejected because it fell with stocks in 2008. Finally, a four-rung Treasury ladder in the brokerage account covers the 2029 to 2032 tuition gap.

Where the FIN 450 Module 5 rubric puts the points

Fixed income milestones in this course are generally marked on the explanation of the bond sleeve's role, the comparison of options on yield, duration, credit and cost, the accuracy of the interest rate sensitivity analysis, the handling of any known cash need and the fit with the policy statement and Milestone One. Students score well when they compute the dollar effect of a rate change, explain why duration matters relative to the investor's horizon and judge riskier bonds by how they behave in a stock market crash. Points are lost for choosing bonds by yield alone, for confusing maturity with duration, for ignoring inflation risk and for leaving a near-term liability exposed to price swings.

FIN 450 Module 5 help: the mistakes that cost points

The most frequent error here is treating the highest yield as the best choice. A higher yield is payment for some risk, whether longer duration, weaker credit or both, so name the risk before accepting the yield. Use duration to put a number on rate risk: duration times the change in rates gives the approximate percentage price change, and multiplying by the dollar amount makes it concrete. Then compare duration with the client's horizon, because a long-horizon investor benefits from higher reinvestment rates after an initial loss. For riskier bonds, check how they did in 2008 or 2020, when diversification is tested. If a bill is due on a known date, buy bonds that mature then rather than a fund whose price can move.

Get FIN 450 Module 5 written to your instructions

Send the FIN 450 Milestone Two guidelines, the bond options in your case and your Milestone One feedback. We compare yield, duration and credit risk, run a rate-shock test in dollars and match any near-term bill to bonds that mature on time. Ready in about two days, and a new student's first milestone is not charged. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 450 papers and related BS Finance samples

FIN 450 Module 5 questions, answered

Where can I find a free FIN 450 Module 5 Milestone Two sample?

This page contains the full FIN 450 Module 5 milestone: a bond sleeve chosen from a 401(k) menu, a rate-shock test in dollars and a Treasury ladder for tuition.

What is bond duration?

A measure of a bond's sensitivity to interest rates, roughly the percentage price change for a one-point change in yield; a duration of six means about a 6 percent loss if rates rise one point.

Do rising interest rates hurt long-term bond investors?

In the short run prices fall, but income is reinvested at higher yields; an investor whose horizon exceeds the bond sleeve's duration usually ends up ahead.

What is a bond ladder?

Several bonds bought together that come due one after another, often a year apart, so cash appears when each bill arrives and nothing has to be sold at whatever price the market offers.

Should a balanced portfolio hold high-yield bonds?

Often only a little, because high-yield bonds tend to fall when stocks fall, which weakens the protection bonds are meant to provide.