| Course | FIN 485 Financial Plan Development |
|---|---|
| Module | Module 6 |
| Paper type | undergraduate assignment on insurance planning and education funding |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Finance |
| Updated | October 2026 |
Free sample paper for FIN 485 Module 6
Insurance and Education Funding Plan for Danielle Brooks
[Student Name]
Southern New Hampshire University
FIN 485: Financial Plan Development
Module Six Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Insurance and Education Funding Plan for Danielle Brooks
Introduction
Danielle is the only earner in her home. If her income stopped, through death or disability, every other part of her plan would fail. This assignment first makes sure her income is protected and then turns to the goal she cares about most, helping Marcus and Jada pay for college, sized to what her cash flow can support.
Life Insurance Need
If Danielle died, the children would live with their father, who would continue child support obligations in a different form, and her estate would pass to their trust. The trust's job would be to replace what Danielle provides: a share of living costs, college help and the home equity that is their main inheritance.
Life insurance needs analysis
| Need | Amount |
|---|---|
| Support for the children until Jada is 22, about $1,500 a month for ten years | $180,000 |
| College help, half of in-state costs for both children | $108,000 |
| Pay off mortgage so the home can be kept or sold without pressure | $255,000 |
| Final expenses and estate costs | $25,000 |
| Emergency reserve for the trust | $30,000 |
| Total need | $598,000 |
| Less group life insurance | $92,000 |
| Remaining need before the former husband's policy | $506,000 |
The decree requires her former husband to carry $250,000 of coverage for the children, which would reduce the need if it exists. Because that coverage is not yet confirmed and is outside Danielle's control, the plan does not rely on it. Studying older American households, Bernheim et al. (2003) saw that the amount of coverage people carry tracks poorly with how much their survivors would actually lose; Danielle's current $92,000 leaves her children badly exposed.
Recommendation: a $500,000 twenty-year level term policy, which would expire as Jada reaches her early thirties. A healthy 44-year-old nonsmoking woman can expect premiums near $30 a month for this coverage. Term insurance is the right tool here because the need is temporary: once both kids are adults and the home loan has shrunk, the trust would need far less, and a permanent policy costing ten times as much would crowd out the retirement and college saving the plan depends on. If her health allows a better rating class, the premium may be lower still. The trust should own and be named beneficiary of the policy.
Disability Insurance
At open enrollment, Danielle declined her employer's voluntary long-term disability plan, which would pay 60 percent of salary, about $4,600 a month, after a 90-day waiting period, to age 65, for about $38 a month. Disability benefits from a plan she pays for with after-tax dollars would be tax free. Without it, a serious illness would leave her with only short-term sick pay and, after five months, an uncertain chance at Social Security disability. The plan recommends enrolling at the next open enrollment, accepting any health questions required for a late enrollee.
Property and Liability
Marcus will get his license next year. Adding a teenage driver will raise her auto premium substantially, likely by $100 or more a month, and adds liability risk. Her auto liability limits of 50/100/50 are low for a homeowner. The plan recommends raising them to 250/500/100, adding a $1 million umbrella policy at roughly $25 a month and raising collision and comprehensive deductibles to $1,000 once her emergency fund passes $5,000, to offset part of the cost. Her homeowners policy was reviewed and its dwelling limit matches a recent rebuilding estimate.
College Costs and Savings
An in-state University of North Carolina System campus with on-campus housing costs roughly $27,000 a year in today's dollars, including tuition, fees, housing and food. Danielle's goal is to cover half, about $13,500 a year or $54,000 per child.
Marcus starts in 2029. His 529 holds $14,000 and receives $100 a month; at 5 percent growth it will hold about $20,000 by fall 2029, leaving a gap of about $34,000 against the half-share goal. Jada starts in 2032. Her 529 holds $9,000; if contributions rise to $250 a month once the card is paid off in early 2028, it would hold about $29,000 by 2032, a little over half of her half-share, with six years for the rest of the plan to help.
Dynarski (2003) found that each $1,000 of grant aid raised college attendance by roughly four percentage points, a reminder that Marcus should file the FAFSA every year, since any aid he qualifies for is worth more to this family than the modest tax advantages of a 529.
Filling Marcus's Gap
The plan does not try to close Marcus's gap by saving more in three years, since that would compete with paying off the card and building the emergency fund. Instead it combines lower costs with other sources.
Lower cost. Marcus can begin at Wake Technical Community College, where tuition for a full-time North Carolina resident is a small fraction of a university's, and transfer under the Comprehensive Articulation Agreement, which lets a student who completes an approved associate degree enter a University of North Carolina System campus with junior standing. Two years at home cuts the four-year cost by roughly a third.
Credits. Milestone Two's deferral strategy keeps Danielle eligible for the American opportunity credit, which can return as much as $2,500 per student each year.
Loans and work. Federal Direct loans in Marcus's name, which begin at $5,500 in the first year, and summer work can cover the remainder. Avery and Turner (2012) argue that for many students, moderate borrowing for a degree with a good expected return is reasonable, while the real danger lies in borrowing without finishing.
Shared costs. If the decree assigns part of college costs to Marcus's father, that share reduces the gap further.
Conclusion
Danielle should buy a $500,000 term policy, enroll in her employer's disability plan, raise her liability coverage before Marcus drives and add an umbrella. Together these add about $95 a month. For college, she should keep saving modestly for Marcus, raise Jada's contributions after the card is gone and plan on community college, education credits and some borrowing for Marcus rather than strain her budget to close the gap in three years.
References
Avery, C., & Turner, S. (2012). Student loans: Do college students borrow too much, or not enough? Journal of Economic Perspectives, 26(1), 165-192. https://doi.org/10.1257/jep.26.1.165
Bernheim, B. D., Forni, L., Gokhale, J., & Kotlikoff, L. J. (2003). The mismatch between life insurance holdings and financial vulnerabilities: Evidence from the Health and Retirement Study. American Economic Review, 93(1), 354-365. https://doi.org/10.1257/000282803321455340
Dynarski, S. M. (2003). Does aid matter? Measuring the effect of student aid on college attendance and completion. American Economic Review, 93(1), 279-288. https://doi.org/10.1257/000282803321455287
What the FIN 485 Module 6 instructions ask for
The Module Six assignment in FIN 485 typically asks you to evaluate the client's insurance coverage and plan for education costs. For insurance, expect to calculate life insurance needs, assess disability, health, property and liability coverage and recommend specific policies or changes. For education, expect to estimate future costs, project current savings, compare funding tools such as 529 plans, education credits, financial aid and loans and recommend a strategy. A strong submission sizes every need in dollars, checks each premium against the cash flow from Milestone One and treats insurance and college as linked, since the same income that pays tuition must be protected first.
How this FIN 485 Module 6 insurance and education assignment example is built
The sample finds that if Danielle died, her children would need about $600,000: income replacement until Jada finishes college, the mortgage and college help, less the $250,000 policy her former husband must carry and her group coverage. It recommends a $500,000 twenty-year term policy at about $30 a month and the employer's long-term disability coverage, which replaces 60 percent of pay after 90 days, at about $38 a month. With Marcus driving next year, it raises auto liability limits and adds a $1 million umbrella. For college, Marcus's 529 will hold about $20,000 by 2029 against a $54,000 half-share, so the plan uses two years at Wake Technical Community College, the state's transfer agreement, education credits and modest federal loans, while Jada's account keeps growing.
Where the FIN 485 Module 6 rubric puts the points
Instructors marking this assignment usually look at the accuracy of insurance needs calculations, the appropriateness of recommended coverage and its cost, the identification of gaps in disability and liability protection, the realism of college cost projections and funding strategies, and the fit with the client's cash flow and earlier sections. Strong papers show the needs calculation line by line, account for existing and court-ordered coverage, price each recommendation and present a college plan that the client can afford alongside debt payoff and retirement saving. Papers lose credit for recommending large whole life policies to a client with tight cash flow, for ignoring disability, and for college plans that assume savings the budget cannot supply.
FIN 485 Module 6 help: the mistakes that cost points
The most common gap in this section is disability insurance. For a single earner, losing the ability to work is more likely before 65 than dying, and it stops income while expenses continue, so check what the employer offers and why the client declined it. For life insurance, build the need from the family's actual expenses and the years until the youngest child is independent, then subtract existing coverage, including any policy a former spouse must carry. For college, project what the 529 will actually hold and compare it with a realistic cost, then list the other sources: community college, in-state schools, credits, aid, the student's own work and federal loans. A plan with a stated gap is more useful than a plan that assumes the gap away.
Get FIN 485 Module 6 written to your instructions
Send the FIN 485 Module 6 directions with the client's policies, benefits summary and 529 balances. We size life and disability needs, check auto and liability limits and build a college plan that fits her cash flow rather than an ideal number. Turnaround is about two days, free the first time. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 485 papers and related BS Finance samples
- FIN 485 Module 1 Discussion: The Planning Process and a Planner's Duty
- FIN 485 Module 2 Engagement and Data Gathering Assignment: Scope, Goals and the Missing Facts
- FIN 485 Module 3 Milestone One: Danielle's Net Worth, Cash Flow and Ratios
- FIN 485 Module 4 Retirement and Investment Assignment: From 6 Percent to the Full Match and Beyond
- FIN 485 Module 5 Milestone Two: Taxes and an Estate Plan After Divorce
- FIN 485 Module 7 Final Project: Danielle's Financial Plan
- FIN 485 Module 8 Discussion: Implementation and the First Review
- MKT 410 Module 5 Milestone Two: Customer Segmentation and Retention Analysis
- HRM 400 Module 8 Discussion: Did Ownership Take Hold?
- ACC 345 Module 5 Forecasting Assignment: Pro Forma Statements for Next Year
- MKT 335 Module 4 Discussion: Personal, Loud or Neither
FIN 485 Module 6 questions, answered
Where can I find a free FIN 485 Module 6 Insurance and Education sample?
This page has the full FIN 485 Module 6 paper, sizing a single parent's life and disability needs and building a realistic college plan for two children.
How much life insurance does a single parent need?
Enough to replace the support her children would lose until they are independent, plus debts and college help, minus existing coverage and any policy a former spouse must keep.
Why is disability insurance important for a single parent?
Because a disabling illness or injury is more likely than death during working years and would stop the only income while household costs continue.
Should I pay off debt or save for my child's college?
High-rate debt and an emergency fund usually come first, since students can borrow for college at moderate rates but parents cannot borrow cheaply for emergencies or retirement.
What is the North Carolina transfer agreement for community college?
A statewide agreement that lets students who complete an approved associate degree at a North Carolina community college transfer to a University of North Carolina System campus with junior standing.