MKT 335 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 335 Module 4 Discussion sample asks how targeting, personalization and attention-grabbing formats interact in digital ad creative, and whether more of each is always better. SNHU MKT 335 (MKT-335) takes up creative strategy and targeting in this module of its BS Marketing course. The post follows Brennan Creek Farm, a composite Kentucky corn maze, whose agency proposes full-screen autoplay video ads, retargeted to ticket-page visitors and naming the date each one viewed. Using field experiments on targeting and obtrusiveness, on personalized retargeting over time and on generic versus specific reminders, the post argues for a quieter test and asks classmates where the line is.

CourseMKT 335 Digital Advertising
ModuleModule 4
Paper typeundergraduate discussion post on ad creative, targeting, personalization and obtrusiveness
LengthAbout 350 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 335 Module 4

1

Module Four Discussion

Your Saturday Is Waiting, and So Is Your Privacy

The agency Brennan Creek Farm hired this year, for the composite Kentucky corn maze I am following, proposed a bold retargeting ad. Anyone who visits the ticket page without buying would see a full-screen video that plays automatically and opens with the date they looked at: "Your Saturday, October 18, is waiting." The agency says personal and loud is what cuts through. It has shown the family a case study from a theme park, and the owners like the idea of reminding hesitant buyers before the weekend sells out.

What this page is doingThe proposal.
2

The idea combines three things: retargeting, which aims at people who already showed interest; personalization, naming their date; and an obtrusive format, autoplay and full screen. Goldfarb and Tucker (2011), in a field experiment with thousands of ad campaigns, found that ads matched to the content people were viewing and ads that were visually obtrusive each raised purchase intent, but ads that were both did worse than ads that were either, and the drop was largest among people most concerned about privacy. Bleier and Eisenbeiss (2015), using field and lab experiments, found that highly personalized banners worked best right after a site visit but lost effectiveness quickly, a pattern they called overpersonalization, while moderately personalized banners started weaker and lasted longer. Lambrecht and Tucker (2013) found that showing the exact product a person had viewed often did worse than a generic brand reminder, unless the person had already narrowed the choice.

What this page is doingThree parts that may not mix.
3

I would test two quieter versions on ticket-page visitors for two weeks: a generic reminder, a short silent clip of families in the maze with "Fall weekends at Brennan Creek. $2 off online," and a moderately personal one, "Still thinking about a Saturday in October? Tickets are $14 online." Neither would autoplay with sound or fill the screen. Whichever sells more tickets per thousand impressions wins.

What this page is doingWhat I would do instead.
4

If you visited a corn maze's ticket page once and then saw your exact date in a full-screen ad that evening, would it make you buy, or make you wonder what else the farm knows?

What this page is doingQuestion.
5

References

Bleier, A., & Eisenbeiss, M. (2015). Personalized online advertising effectiveness: The interplay of what, when, and where. Marketing Science, 34(5), 669-688. https://doi.org/10.1287/mksc.2015.0930

Goldfarb, A., & Tucker, C. (2011). Online display advertising: Targeting and obtrusiveness. Marketing Science, 30(3), 389-404. https://doi.org/10.1287/mksc.1100.0583

Lambrecht, A., & Tucker, C. (2013). When does retargeting work? Information specificity in online advertising. Journal of Marketing Research, 50(5), 561-576. https://doi.org/10.1509/jmr.11.0503

What the MKT 335 Module 4 instructions ask for

The Module 4 discussion in MKT 335 generally asks how creative and targeting choices shape digital ad effectiveness, including personalization, retargeting, ad formats and the line between relevant and intrusive. You may be given a scenario or asked to evaluate a real campaign. A strong post judges a specific ad idea, separates its parts, the format, the targeting and the message, explains with field evidence how those parts combine and proposes a test rather than a guess. It recognizes that a technique can work alone and fail in combination, and it treats the viewer's sense of privacy as a factor in effectiveness, not only an ethical concern. A short note on how the viewer would feel receiving the ad adds a useful perspective.

How this MKT 335 Module 4 discussion example is built

In the sample, Brennan Creek Farm's agency proposes full-screen autoplay video ads, retargeted to people who viewed the ticket page and opening with the date each viewed: "Your Saturday, October 18, is waiting." The post separates the format, the targeting and the personalization. It cites Goldfarb and Tucker's field experiment, in which ads that were both matched to content and visually obtrusive did worse than ads that were one or the other, Bleier and Eisenbeiss's finding that highly personalized banners work right after a visit but fade fast and Lambrecht and Tucker's evidence that generic reminders often beat specific ones. It proposes testing a quiet generic reminder against a quiet date reminder.

Where the MKT 335 Module 4 rubric puts the points

Creative and targeting discussions are commonly graded on accurate understanding of personalization, retargeting and formats, application to a specific ad, use of experimental evidence, a practical recommendation and replies. Strong posts break an idea into its parts, explain interactions between them with research, consider how viewers experience the ad and propose a test. Points drop for assuming that more targeting is always better, for ignoring privacy, for citing research without findings and for replies that just agree. Writing out the proposed ad copy helps classmates judge it themselves. A clear test design, even a simple one, shows the measurement thinking the course values. Separating format, targeting and message, rather than judging the ad as a whole, shows analytical skill.

MKT 335 Module 4 help: the mistakes that cost points

Write the ad idea out fully: the format, who sees it and what it says. Then separate those parts and ask which ones help and which might clash. Look for field experiments on targeting, obtrusiveness and personalization and say what they found. Imagine receiving the ad on your phone after visiting a ticket page once. Recommend a version, or better, two versions to test against each other, and say how you would measure the result. Finish by inviting classmates to say when a relevant ad starts to feel like surveillance, a question that brings out different experiences. Brevity helps; classmates should be able to weigh the ad copy in a single reading.

Get MKT 335 Module 4 written to your instructions

Paste the MKT 335 Module 4 prompt and the ad idea you are judging. We weigh its format, targeting and personalization against field experiments, propose a cleaner test and end with a question that divides the class productively. A first post is free and usually ready by the second day. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 335 papers and related BS Marketing samples

MKT 335 Module 4 questions, answered

Where can I find a free MKT 335 Module 4 Discussion sample?

This page has the complete MKT 335 Module 4 post, weighing a personalized, full-screen retargeting ad for a corn maze.

Is a more targeted ad always more effective?

No; a large field experiment found targeted ads and attention-grabbing ads each worked, but ads that were both did worse, especially where privacy mattered.

How long does personalized retargeting stay effective?

Field experiments found highly personalized banners worked best right after a site visit but lost effectiveness quickly, while moderately personalized ones lasted longer.

Should retargeting ads show the exact product a person viewed?

Not usually; a travel firm's experiment found generic brand reminders often did better, except for people who had already narrowed their choice.

How should a business test ad creative?

Run two versions to comparable audiences at the same time, judge them on sales or conversions, and change only one element at a time.