| Course | MKT 335 Digital Advertising |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment auditing a business's digital advertising accounts and spending |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 335 Module 2
Half the Search Budget on Its Own Name: An Ad Account Audit for Brennan Creek Farm
[Student Name]
Southern New Hampshire University
MKT 335: Digital Advertising
Ad Account Audit Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Half the Search Budget on Its Own Name: An Ad Account Audit for Brennan Creek Farm
Introduction
Last fall the Brennan family put $38,000 into digital ads for its six-week season at the Shelbyville farm and drew about 41,000 visitors, 6 percent more than the year before. The owners want to know what the money did before they spend again, and they have set aside a similar budget for this fall on the condition that it can be judged afterward. This audit reviews every ad account from last season: where the money went, what it bought, how the accounts were set up and whether results were tracked. It ends with the changes that matter most.
Spending and Results by Channel
Last season by channel
| Channel | Spend | Impressions | Clicks | CPM | Click-through | Cost per click | Tracked online tickets | Cost per tracked ticket |
|---|---|---|---|---|---|---|---|---|
| Search | $9,000 | 210,000 | 11,300 | $42.86 | 5.4 percent | $0.80 | 2,950 | $3.05 |
| Social | $18,000 | 2,400,000 | 21,600 | $7.50 | 0.9 percent | $0.83 | 3,300 | $5.45 |
| Display | $8,000 | 3,900,000 | 9,400 | $2.05 | 0.24 percent | $0.85 | Not tracked | Not known |
| Video | $3,000 | 410,000 | 1,200 | $7.32 | 0.29 percent | $2.50 | Not tracked | Not known |
| Total | $38,000 | 6,920,000 | 43,500 | 6,250 |
Online ticket buyers came to about 15,600 visitors, 38 percent of attendance, but only 6,250 orders could be linked to an ad platform. Display and video results cannot be judged at all.
Search
Of the $9,000 in search, $4,300 bought clicks on the farm's own name, at about 55 cents a click. Many of those searchers would have found the farm anyway. The rest went to terms such as "corn maze near Louisville" and "pumpkin patch Kentucky," bid to the top position at up to $2.40 a click. Agarwal et al. (2011), using a field experiment with an online retailer's search campaign, found that click-through fell as ads moved down the page but conversion rose, so the top position was not necessarily the most profitable. Rutz and Bucklin (2011) found that generic search ads raised later searches for the brand by name, so the generic terms deserve credit for some branded clicks that followed. Together these suggest spending less on the farm's own name and judging generic terms by their total effect, not their cheapest position.
Social
Social ads took nearly half the budget and produced the most tracked tickets. The targeting was broad: adults 25 to 54 within 60 miles. Frequency, meaning how many times a typical person in the audience met the ads, climbed from 2 in the first week to 14 in the final week, when most ads were still showing September's "opening weekend" image. The last two weeks cost $6,200 and produced only 520 tracked tickets.
Display
Display banners reached 3.9 million impressions cheaply, but a placement report shows that 34 percent ran inside mobile game apps, often to children, and another 12 percent on sites with no family or local audience. Click-through was 0.24 percent, and no conversions were tracked. Hoban and Bucklin (2015), randomizing display ads in a field experiment at a financial services provider, found that display ads raised site visits for people at most stages of the purchase funnel, but not for those who had visited before without signing up. Display may help Brennan Creek, but only if it reaches the right people, and last year's placements make that doubtful.
Video
Video ads ran on one platform for two weeks, mostly as skippable pre-roll. Fewer than 30 percent of views passed five seconds, the point at which viewers can skip. With no tracking and no comparison group, the test taught nothing about whether video brings visitors.
Creative and Timing
The creative barely changed during the season. Social and display ads used the same two images, a pumpkin field at sunset and a child in the maze, from late September to early November, with the words "Opening weekend!" still on them in week five. Search ads used one headline. No ad mentioned the Friday flashlight maze, the farm's least crowded and most profitable night, and none promoted the $2 online discount that would have helped the owners plan staffing. Spending was also front-loaded by accident: the social budget ran evenly per day, so quiet Mondays and Tuesdays, when nobody can visit, received as much money as Thursdays and Fridays, when families plan their weekends.
Tracking
The ticketing site's tracking code was installed for search and social but not for display or video. Gate sales, 62 percent of attendance, were never linked to anything. Without changes, next season's audit will face the same blind spot. Two inexpensive fixes are available: a different promo code printed on each channel's ads, redeemable at the gate for a small discount, and a one-question survey on the gate staff's tablets asking where visitors heard about the farm. Neither is perfect, since some visitors will not mention an ad they saw, but both would turn the gate from a black box into a rough source of evidence.
Ranked Changes
Ranked changes
| Rank | Change | Expected effect |
|---|---|---|
| 1 | Install tracking on every platform and add a promo code or survey at the gate | Makes every later decision possible |
| 2 | Cut brand search to a small defensive budget | Frees about $3,500 |
| 3 | Cap social frequency at 3 a week and refresh creative weekly | Saves money in the final weeks; keeps ads relevant |
| 4 | Exclude game apps and irrelevant sites from display | Removes nearly half the display waste |
| 5 | Stop bidding for the top spot on every generic term | Lowers cost per ticket |
Limitations
The audit cannot show how many gate visitors saw an ad. Tracked tickets understate social and search results and say nothing about display and video. The 6 percent rise in attendance cannot be credited to ads without a comparison, such as counties or weeks in which ads did not run, which the next plan should build in from the start.
Conclusion
About a third of last season's ad money bought clicks from people already coming, impressions in the wrong places or the same ad shown too many times. The rest may have worked, but the farm cannot tell, and neither can anyone advising it. Fixing tracking first will let the next campaign be judged, not guessed.
References
Agarwal, A., Hosanagar, K., & Smith, M. D. (2011). Location, location, location: An analysis of profitability of position in online advertising markets. Journal of Marketing Research, 48(6), 1057-1073. https://doi.org/10.1509/jmr.08.0468
Hoban, P. R., & Bucklin, R. E. (2015). Effects of internet display advertising in the purchase funnel: Model-based insights from a randomized field experiment. Journal of Marketing Research, 52(3), 375-393. https://doi.org/10.1509/jmr.13.0277
Rutz, O. J., & Bucklin, R. E. (2011). From generic to branded: A model of spillover in paid search advertising. Journal of Marketing Research, 48(1), 87-102. https://doi.org/10.1509/jmkr.48.1.87
What the MKT 335 Module 2 instructions ask for
The audit assignment in MKT 335 commonly asks you to review an organization's current digital advertising, including channels, budgets, targeting, creative, key metrics such as impressions, click-through rate, cost per click, conversions and return, and how results are tracked. A strong audit works from actual account data or careful estimates, computes the same metrics for every channel so they can be compared, looks inside each account at keywords, placements, audiences and frequency, checks whether conversions are tracked at all and explains problems with research rather than rules of thumb. It closes on a few changes in order of value, not a wish list. Placement and search-term reports often reveal the biggest waste.
How this MKT 335 Module 2 ad account audit assignment example is built
The sample audits Brennan Creek Farm's ad accounts from last fall. Of $38,000, search took $9,000, almost half on the farm's own name; social took $18,000, with frequency rising to 14 impressions per person in the final week; display took $8,000, a third of it on mobile game apps; and video took $3,000. Only two of four platforms tracked online ticket sales. The paper computes CPM, click-through, cost per click and cost per tracked ticket by channel, then explains the waste with Agarwal, Hosanagar and Smith on search position, Rutz and Bucklin on generic-to-branded spillover and Hoban and Bucklin on display effects by funnel stage, ending with five ranked changes.
Where the MKT 335 Module 2 rubric puts the points
Ad account audits are usually graded on the completeness of the channel review, the accuracy and comparability of metrics, the depth of the look inside each account, the treatment of tracking and the quality of prioritized recommendations, plus writing. Strong audits put every channel's numbers in one table, find specific waste such as irrelevant placements or excessive frequency, check tracking and explain why each problem matters. Marks drop for audits that repeat platform summaries, for metrics compared across channels without the same definitions, for missing tracking problems and for recommendations the data cannot back. Graders also value audits that acknowledge what the data cannot show, such as gate sales.
MKT 335 Module 2 help: the mistakes that cost points
Export last season's data from every ad platform and put spend, impressions, clicks and conversions for each in one table. Compute the same metrics for all: cost per thousand impressions, click-through rate, cost per click and cost per tracked sale. Then open each account: which keywords, placements and audiences took the money, and how often did the same people see the ads? Check whether conversions were tracked on every platform. Use research to explain the biggest problems. Rank three to five changes by expected savings or gains. Be honest about what the accounts cannot show. Keep a short list of anything you could not measure, since it shapes the next plan.
Get MKT 335 Module 2 written to your instructions
Send the MKT 335 Module 2 directions and exports or screenshots from the ad accounts you are auditing. We trace the spending by channel, compute the metrics that matter, find wasted placements, keywords and frequency and rank fixes with research behind them. Your first audit is free and normally done in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 335 papers and related BS Marketing samples
- MKT 335 Module 1 Discussion: Ads for a Six-Week Season
- MKT 335 Module 3 Milestone One: Objectives, Audiences and the Funnel Budget
- MKT 335 Module 4 Discussion: Personal, Loud or Neither
- MKT 335 Module 5 Milestone Two: The Media Plan, Targeting and Bidding
- MKT 335 Module 6 Ad Testing Plan Assignment: Proving What the Ads Did
- MKT 335 Module 7 Final Project: The Digital Advertising Campaign Plan
- MKT 335 Module 8 Discussion: What the Holdout County Showed
- ACC 345 Module 2 Ratio Analysis Assignment: Three Years of Liquidity, Solvency and Profitability
- BUS 496 Module 8 Final Reflection: What a Semester of Client Work Taught
- ACC 425 Module 6 Discussion: The Ethics of Persuasion in an Interview
- INT 221 Module 2 Exchange Rate Regimes Assignment: Four Partners, Four Currency Regimes
MKT 335 Module 2 questions, answered
Where can I find a free MKT 335 Module 2 Ad Account Audit Assignment sample?
A complete MKT 335 Module 2 ad account audit appears on this page, tracing a corn maze's $38,000 across search, social, display and video.
What metrics should a digital ad audit include?
Spend, impressions, cost per thousand impressions, click-through rate, cost per click, conversions, cost per conversion and frequency, computed the same way for each channel.
Is the top search ad position always best?
No; a field experiment found click-through fell with lower positions but conversion rose, so the top position was not necessarily the most profitable.
Do generic search ads help branded searches?
Research found generic search ads can lead people to search later for the brand by name, so judging generic keywords alone understates their value.
What is ad frequency?
The average number of times each person in the audience sees an ad over a period; very high frequency often wastes money and annoys people.