| Course | FIN 620 Money and Capital Markets |
|---|---|
| Module | Module 3 |
| Paper type | graduate milestone structuring a municipal bond issue |
| Length | About 1,080 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 620 Module 3
Plan of Finance for the Wenonah Falls Water Treatment Plant Bonds
[Student Name]
Southern New Hampshire University
FIN 620: Money and Capital Markets
Milestone One
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Plan of Finance for the Wenonah Falls Water Treatment Plant Bonds
Introduction
Wenonah Falls's water utility must build a $95 million treatment plant to remove PFAS chemicals and meet federal drinking water limits. The plant will serve the city for forty years or more. This milestone designs the bonds that pay for it: how much to borrow, over what maturities, with which coupons and call features, backed by what security and sold by which method.
Security and Amount
The bonds will be water revenue bonds, secured by the net revenue of the water and sewer system after operating costs, not by the city's taxing power. Revenue bonds keep the plant's cost with the people who use the water and preserve the city's general obligation capacity for other needs. The issue will be about $95 million: about $88 million for construction, $5 million of capitalized interest during the two-year build so customers do not pay for a plant they cannot yet use, and about $2 million for issuance costs. The utility's existing parity bonds allow new bonds if net revenue covers maximum annual debt service on all bonds at least 1.25 times, and the city will not fund a debt service reserve because its rating and coverage make one unnecessary.
Maturities
The bonds will mature serially each year from 2029 to 2056, after two years of capitalized interest, with principal arranged so that total annual payments stay level at about $5.4 million. Level debt service matches the steady revenue of a utility. Module Two found the tax-exempt yield curve steep, rising from about 2.7 percent for five-year maturities to about 4.4 percent for thirty-year ones for a double-A credit, so a serial schedule captures the low short-end yields on the first maturities and still stretches principal across the decades the plant will run. A shorter final maturity would lower interest cost but raise annual payments and water rates; thirty years is a reasonable balance for an asset expected to last forty.
Coupons
Each maturity will carry a 5 percent coupon, well above market yields of 2.7 to 4.4 percent, so investors will pay more than face value. A ten-year bond with a 5 percent coupon priced to yield 3.15 percent sells for about $115.66 per $100 of face value. This convention puzzles students but has clear reasons. Under federal tax rules, a tax-exempt bond bought at a discount below a small threshold creates market discount that is taxed as ordinary income when the bond matures or is sold, which reduces the bond's value to buyers. Landoni (2018) found that this tax treatment distorts how municipal bonds are priced and pushes issuers toward premium coupons. Premium bonds also have shorter durations, falling less in price if rates rise, which institutional buyers value. The coupon is not the city's cost; the yield is.
The Call Feature
Bonds maturing after 2036 will be callable at par, meaning face value, from 2036 onward. If rates fall, the city can refinance them at lower cost. Investors know this and demand a higher yield for callable bonds, so the call is an option the city pays for through slightly higher yields. Because the bonds carry 5 percent coupons and sell at a premium, investors price them to the call date: a twenty-year 5 percent bond priced at about $108.11 yields about 4.0 percent to the 2036 call but about 4.4 percent if held to maturity. A ten-year par call is the market standard for tax-exempt bonds and gives the city flexibility without unusual cost.
Borrowing Cost
Weighting each maturity's expected yield by its principal and timing gives an estimated true interest cost of about 3.9 percent, the single rate that equates all debt service payments with the money the city receives. At that cost, level annual debt service on $95 million over thirty years is about $5.4 million.
Coverage
The water and sewer utility collects about $68 million a year and spends about $41 million on operations and maintenance, leaving net revenue of about $27 million. Existing parity debt service is about $12 million, so coverage today is about 2.25 times. Adding about $5.4 million of new debt service lifts total debt service to about $17.4 million and lowers coverage to about 1.55 times, still above the 1.25 times rate covenant. The city's own financial policy calls for at least 1.5 times to protect its double-A rating. Because operating costs for the new plant will add about $2 million a year once it opens, coverage would slip near 1.45 times without action, so the plan includes water rate increases of 3.5 percent in each of the next two years, raising net revenue enough to keep coverage near 1.6 times.
Method of Sale
In a competitive sale, underwriters submit bids on a set date and the lowest true interest cost wins. In a negotiated sale, the city selects an underwriter in advance, which markets the bonds to investors before pricing. Robbins and Simonsen (2007) found that competitive sales produced lower interest costs on average for Missouri issuers, but Simonsen et al. (2001) found the advantage depended on issuer size and frequency of borrowing. Wenonah Falls borrows only every few years, its revenue bonds are less familiar to investors than its general obligation bonds, and the PFAS project may need explaining. The plan therefore favors a negotiated sale with an independent municipal advisor checking the pricing against comparable trades, a safeguard against the underpricing Schultz found in Module One.
Disclosure and Investors
Investors in a new revenue bond will read the official statement closely, especially the sections on the PFAS rule, the plant's construction schedule and the rate increases. The city should describe the regulatory deadline plainly, give the engineer's cost estimate with its contingency, show coverage under the projected rates and commit to annual continuing disclosure filed on the Municipal Securities Rulemaking Board's EMMA system. Clear disclosure narrows the uncertainty investors price into the spread, which matters more for an infrequent issuer than for a city that borrows every year.
Conclusion
Wenonah Falls should sell about $95 million of thirty-year serial water revenue bonds with level debt service of about $5.4 million, 5 percent coupons sold at a premium and a ten-year par call, at an estimated true interest cost near 3.9 percent. Coverage stays above the covenant and, with two modest rate increases, above the city's own 1.5 times target. A negotiated sale with independent pricing oversight fits an infrequent issuer with a new project to explain.
References
Landoni, M. (2018). Tax distortions and bond issue pricing. Journal of Financial Economics, 129(2), 382-393. https://doi.org/10.1016/j.jfineco.2018.05.005
Robbins, M. D., & Simonsen, B. (2007). Competition and selection in municipal bond sales: Evidence from Missouri. Public Budgeting and Finance, 27(2), 88-103. https://doi.org/10.1111/j.1540-5850.2007.00876.x
Simonsen, B., Robbins, M. D., & Helgerson, L. (2001). The influence of jurisdiction size and sale type on municipal bond interest rates: An empirical analysis. Public Administration Review, 61(6), 709-717. https://doi.org/10.1111/0033-3352.00141
What the FIN 620 Module 3 instructions ask for
Milestone One in FIN 620 usually asks you to plan a security issue for the case client, often a bond. Expect to choose the amount, maturity structure, coupon and call provisions, the security pledged and the method of sale, and to estimate the borrowing cost and the issuer's ability to repay. Many versions ask you to explain market conventions, such as why certain coupons or calls are standard, and how ratings and investors will view the issue. A strong milestone ties each structural choice to the borrower's cash flows and to how the market prices bonds, shows debt service and coverage in numbers and explains the trade-offs among options.
How this FIN 620 Module 3 milestone one example is built
The sample proposes $95 million of water revenue bonds maturing serially over thirty years, with level annual debt service of about $5.4 million at an estimated true interest cost near 3.9 percent. Each maturity carries a 5 percent coupon and sells at a premium, which most institutional investors prefer because discounted tax-exempt bonds can create taxable gains for buyers. Bonds due after ten years can be called at par in year ten, preserving the option to refinance. Projected net revenue of about $27 million covers total debt service of about $17.4 million about 1.55 times, above the 1.25 times rate covenant, and a two-step rate increase protects the utility's own 1.5 times target. The paper favors a negotiated sale for an issue of this size and type.
Where the FIN 620 Module 3 rubric puts the points
Expect this milestone to be graded on the soundness of the issue's structure, the explanation of market conventions, the accuracy of debt service and coverage calculations, the assessment of credit and investor demand, the choice of sale method and the clarity of the plan. Higher scores go to papers that match the maturity structure to the asset's life, explain premium coupons and call provisions, test coverage against the bond covenants and the issuer's own policies, and support the sale method with evidence. Papers lose points for structures that ignore the yield curve, for coverage tested only at current revenue, for treating the coupon as the borrowing cost and for sale method choices made without reasons.
FIN 620 Module 3 help: the mistakes that cost points
Remember that a bond's coupon and its cost are different things. Municipal bonds commonly carry 5 percent coupons and sell above par, so the yield, not the coupon, is the cost; use true interest cost to compare structures. Match maturities to the life of the asset and use the yield curve to decide how much to place at each point. Explain the call feature as an option the issuer buys, since investors charge for it in a higher yield. Test coverage with revenue after operating costs against debt service on all parity bonds, then compare it with the covenant and the issuer's own target. Finally, give reasons for the sale method: issue size, credit strength and how unusual the bonds are.
Get FIN 620 Module 3 written to your instructions
Upload the FIN 620 Milestone One guidelines and the project and revenue figures in your case. We lay out maturities, coupons and calls, compute debt service and coverage, and weigh sale methods against market evidence. Back in about two days; no fee for your first milestone. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 620 papers and related MS Finance samples
- FIN 620 Module 1 Discussion: How a City Reaches the Markets
- FIN 620 Module 2 Interest Rates Assignment: What Sets the Rate Wenonah Falls Will Pay
- FIN 620 Module 4 Discussion: How Federal Reserve Policy Reaches a City's Borrowing Cost
- FIN 620 Module 5 Bond Valuation Assignment: Pricing a Callable Serial Bond
- FIN 620 Module 6 Milestone Two: Investing Idle Funds and Bond Proceeds
- FIN 620 Module 7 Discussion: Paying for a Second Credit Rating
- FIN 620 Module 8 Derivatives Assignment: A Swap Offered to Fix a Variable-Rate Bond
- FIN 620 Module 9 Milestone Three: Debt Affordability and a Refunding Test
- FIN 620 Module 10 Final Project: The Report to the City Council
- ACC 693 Module 5 Forensic Imaging Assignment: Acquiring the Laptop and the Phone
- BMB 630 Module 5 Media Mix Assignment: Owned, Earned and Paid Media for a Fall Season
- OL 500 Module 4 Milestone Two: Motivation and Reward System Analysis
- FIN 610 Module 8 Short-Term Financing Assignment: Revolver, Asset-Based Loan or Factoring
FIN 620 Module 3 questions, answered
Where can I find a free FIN 620 Module 3 Milestone One sample?
The complete FIN 620 Module 3 milestone is posted on this page, planning a $95 million water revenue bond with serial maturities, premium coupons, a call and coverage tests.
What are serial bonds?
A bond issue divided into many maturities, often one per year, so that principal is repaid gradually and each maturity is priced at its own point on the yield curve.
Why do municipal bonds often have 5 percent coupons?
Institutional buyers prefer premium bonds, partly because bonds bought at a discount can create taxable income and lose value faster when rates rise, so issuers set coupons above market yields and sell at a premium.
What is a rate covenant in a revenue bond?
A promise by the utility to set charges high enough that net revenue covers debt service by a stated margin, such as 1.25 times.
What is true interest cost?
The rate that discounts all of an issue's debt service payments back to the proceeds the issuer receives, the best single measure of borrowing cost.