| Course | FIN 620 Money and Capital Markets |
|---|---|
| Module | Module 2 |
| Paper type | graduate assignment on interest rate determination and the term structure |
| Length | About 1,080 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 620 Module 2
Building Wenonah Falls's Borrowing Rate From Its Parts
[Student Name]
Southern New Hampshire University
FIN 620: Money and Capital Markets
Module Two Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Building Wenonah Falls's Borrowing Rate From Its Parts
Introduction
Wenonah Falls will sell about $95 million of water revenue bonds maturing over thirty years. Its finance director wants to know what rate to expect at each maturity and why. Answering that requires explaining what sets interest rates in general and what makes this borrower's rates different. This paper builds the rate in layers, using assumed market levels for the fall of 2026 rounded for clarity; actual yields on the sale date will differ.
The Risk-Free Base
The starting point is the yield on Treasury securities of the same maturity, which carry no default risk. Assume the 10-year Treasury yields about 4.2 percent and the 30-year about 4.6 percent. The Fisher relation divides a nominal yield into a real return and expected inflation. The yield on 10-year inflation-protected Treasuries offers a market estimate of the real part, assumed here to be about 1.8 percent, leaving about 2.4 percent as the inflation investors expect, roughly the Federal Reserve's 2 percent goal plus a small cushion. The real rate reflects how much savers demand to postpone spending and how much borrowers wish to invest; expected inflation reflects confidence in the central bank.
The Shape of the Curve
Yields usually rise with maturity, and the assumed curve does. The expectations view holds that long rates average the short rates investors expect over the life of the bond, so an upward slope signals expected increases in short rates. The liquidity premium view adds that lenders want a bonus for committing funds over a longer stretch and accepting larger swings in price, so the curve slopes upward even when short rates are expected to stay flat. Fama (1984) found that forward rates do contain information about future short rates, but that term premiums vary over time, so both views have a place.
The curve has not always looked this way. From mid-2022 into the second half of 2024, the 2-year Treasury yielded more than the 10-year, the longest inversion in decades, after the Federal Reserve raised short rates rapidly to fight inflation. Estrella and Mishkin (1998) put a long list of market signals to the test, and the slope of the Treasury curve, long yield minus bill yield, gave the earliest dependable warning of downturns, often a year or more ahead. The 2022 to 2024 inversion was not followed promptly by a recession, a reminder that the signal is a probability, not a certainty.
The Tax Exemption
Interest on the city's water bonds will be exempt from federal income tax, so investors accept a lower stated yield. Assume top-grade, or triple-A, tax-exempt yields of about 2.9 percent at ten years and 4.1 percent at thirty. At ten years that is about 70 percent of the Treasury yield; at thirty, nearly 90 percent. The ratio rises with maturity because the long end of the municipal market depends more on institutional buyers such as insurers, whose tax benefit from exemption is smaller, while individuals in high brackets dominate shorter maturities.
For an investor in the 37 percent federal bracket, a 2.9 percent tax-exempt yield is worth about the same as a taxable 4.6 percent, calculated as 2.9 divided by 0.63, which exceeds the Treasury yield. Ang et al. (2010) studied municipal bonds whose tax treatment changes because of how they are priced and found that investors place a high value on the exemption, consistent with investors in high brackets setting prices at the margin. The tax-exempt curve is also steeper than the Treasury curve, which has a practical consequence: the city pays much less for short and intermediate maturities than for the longest ones.
The Credit Spread
The city's water revenue bonds will be repaid from water and sewer charges, not taxes, and the utility is rated double-A. Bonds of that quality typically yield a quarter to a third of a percentage point more than triple-A bonds, a spread that compensates investors for a small chance of default and for the lower liquidity of a single issuer's bonds. Expected losses on double-A municipal debt have historically been very small, so much of the spread pays for liquidity and uncertainty rather than expected default. The spread is not fixed: it widened sharply for many issuers in March 2020, when municipal funds faced heavy withdrawals.
Putting the Layers Together
Assumed rates for Wenonah Falls's water revenue bonds
| Maturity | Treasury yield | Triple-A tax-exempt yield | Double-A spread | Expected city rate |
|---|---|---|---|---|
| 5 years | 3.9% | 2.5% | 0.20% | About 2.7% |
| 10 years | 4.2% | 2.9% | 0.25% | About 3.15% |
| 20 years | 4.5% | 3.7% | 0.30% | About 4.0% |
| 30 years | 4.6% | 4.1% | 0.30% | About 4.4% |
These estimates combine the layers above and will change with markets before the sale. They show how much the rate depends on maturity: the city would pay about 2.7 percent on bonds due in five years but about 4.4 percent on those due in thirty.
What Could Move These Rates Before the Sale
Several months will pass between this analysis and the day the bonds are priced, and three forces could move the city's rates in that time. A change in the inflation outlook would move Treasury yields and carry tax-exempt yields with them. A wave of new municipal supply, common in the spring and early summer, can widen spreads and raise yields for all issuers, while heavy reinvestment of maturing bonds and coupons in June and July often pushes yields down. And a change in federal tax policy, even a proposal, can move the ratio between tax-exempt and Treasury yields quickly, because the value of the exemption depends on tax rates. The finance director should watch these and keep flexibility on the sale date.
What It Means for the City
A water plant lasts forty years or more, so financing it over thirty years matches costs to the customers who use it. But the steep tax-exempt curve means each extra year of maturity costs more. Serial bonds, a series of maturities from one to thirty years, let the city pay low rates on early maturities while spreading repayment over the plant's life. Milestone One will structure the issue on that basis.
Conclusion
Wenonah Falls's borrowing cost combines a Treasury base made of real return and expected inflation, a curve that rises with maturity, a large discount for the tax exemption and a modest spread for its double-A credit. Together these imply rates from under 3 percent for short maturities to about 4.4 percent at thirty years, which favors a serial structure that uses the cheaper short end.
References
Ang, A., Bhansali, V., & Xing, Y. (2010). Taxes on tax-exempt bonds. The Journal of Finance, 65(2), 565-601. https://doi.org/10.1111/j.1540-6261.2009.01545.x
Estrella, A., & Mishkin, F. S. (1998). Predicting U.S. recessions: Financial variables as leading indicators. The Review of Economics and Statistics, 80(1), 45-61. https://doi.org/10.1162/003465398557320
Fama, E. F. (1984). The information in the term structure. Journal of Financial Economics, 13(4), 509-528. https://doi.org/10.1016/0304-405X(84)90013-8
What the FIN 620 Module 2 instructions ask for
The Module Two assignment in FIN 620 commonly has you account for the level of rates and for why they differ from one maturity and one borrower to the next. Expect to discuss real rates and expected inflation, the theories of the term structure, such as expectations, liquidity premium and market segmentation, and the risk factors that create spreads, including default risk, liquidity and taxes. Many versions ask you to interpret the current yield curve or a historical episode. A strong submission applies these ideas to a specific borrower or security, uses dated figures, distinguishes what each theory predicts and explains what the analysis implies for a real decision such as choosing maturities.
How this FIN 620 Module 2 interest rates assignment example is built
The sample builds the rate Wenonah Falls will pay from assumed fall 2026 market levels. A 10-year Treasury yield near 4.2 percent reflects about 1.8 percent of real return and 2.4 percent of expected inflation. The top-grade tax-exempt curve sits near 70 percent of Treasury yields at ten years, about 2.9 percent, and rises to about 4.1 percent at thirty, steeper than the Treasury curve. A double-A water revenue credit adds roughly a quarter point. For an investor in the top federal bracket, a 2.9 percent tax-exempt yield equals about 4.6 percent taxable, which explains why tax-exempt rates are lower. The paper reads the curve's slope with the expectations and term premium views, recalls the 2022 to 2024 inversion and concludes that serial maturities spread across the curve suit the city.
Where the FIN 620 Module 2 rubric puts the points
Marks on this assignment usually follow its parts: the accuracy of the explanation of real rates, inflation and the Fisher relation, the treatment of term structure theories, the analysis of risk premiums including taxes and credit, the use of data with dates and the link to the borrower's decision. High-scoring papers build the rate in layers with numbers, explain why the tax-exempt curve differs from the Treasury curve, use the taxable-equivalent yield correctly and draw a practical conclusion. Papers lose points for describing theories without applying them, for quoting rates without dates or sources, for confusing nominal and real rates and for ignoring credit and tax effects.
FIN 620 Module 2 help: the mistakes that cost points
The easiest way to organize this paper is to build the rate one layer at a time. Start with the Treasury yield for the maturity you care about, split it into real return and expected inflation, then add or subtract what makes your borrower different: a credit spread for default risk, a liquidity premium for a thin market and, for municipal bonds, the effect of the tax exemption. Use numbers and dates for each layer, and say where they come from. When you discuss the yield curve, say what each theory predicts for its current shape and which you find more convincing. Finally, connect the analysis to a decision, such as how long to borrow.
Get FIN 620 Module 2 written to your instructions
Send the FIN 620 Module 2 directions and the borrower or security in your case. We build its rate from the risk-free curve, inflation, term and credit layers, explain the curve's shape with dates and data and say what the result means for the borrower. Usually two days; the first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 620 papers and related MS Finance samples
- FIN 620 Module 1 Discussion: How a City Reaches the Markets
- FIN 620 Module 3 Milestone One: Structuring a $95 Million Water Revenue Bond
- FIN 620 Module 4 Discussion: How Federal Reserve Policy Reaches a City's Borrowing Cost
- FIN 620 Module 5 Bond Valuation Assignment: Pricing a Callable Serial Bond
- FIN 620 Module 6 Milestone Two: Investing Idle Funds and Bond Proceeds
- FIN 620 Module 7 Discussion: Paying for a Second Credit Rating
- FIN 620 Module 8 Derivatives Assignment: A Swap Offered to Fix a Variable-Rate Bond
- FIN 620 Module 9 Milestone Three: Debt Affordability and a Refunding Test
- FIN 620 Module 10 Final Project: The Report to the City Council
- BMB 630 Module 2 Audience Segmentation Assignment: Sorting 48,000 Ticket Buyers
- QSO 690 Module 3 Automation Assignment: A Robotic Welding Cell and the Welders
- MGT 701 Module 6 Discussion: Biases in Choosing Among Alternatives
- MKT 665 Module 1 Discussion: Why Stories Persuade
FIN 620 Module 2 questions, answered
Where can I find a free FIN 620 Module 2 Interest Rates sample?
This page has the full FIN 620 Module 2 paper, building a city's borrowing rate from real rates, inflation, the term structure, the tax exemption and its credit spread.
What is the Fisher equation?
The relation that a nominal interest rate approximately equals the real interest rate plus expected inflation.
Why are municipal bond yields lower than Treasury yields?
Because interest on most municipal bonds is exempt from federal income tax, investors accept a lower stated yield, especially those in high tax brackets.
How do you calculate a taxable-equivalent yield?
Divide the tax-exempt yield by one minus the investor's marginal tax rate; at a 37 percent rate, a 2.9 percent tax-exempt yield equals about 4.6 percent taxable.
What does an inverted yield curve mean?
Short-term rates are above long-term rates, which usually reflects expectations that rates will fall, often because markets anticipate slower growth or recession.