QSO 690 Module 3 Automation Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 690 Module 3 Automation Assignment sample evaluates an automation investment on capacity, cost, quality and payback, places it within the wider pattern of Industry 4.0 adoption and plans its effects on the workforce and the skills the plant will need. SNHU QSO 690 (QSO-690) covers automation and Industry 4.0 in Module 3 of its MS Operations Management topics course. The company is Rimefield Plow & Spreader, an invented Minnesota snowplow maker that cannot hire enough welders for its busy season. Two robotic cells pay back in a few years, but the analysis is not finished until it says what happens to the people already holding the torches.

CourseQSO 690 Topics in Operations Management
ModuleModule 3
Paper typegraduate assignment evaluating an automation investment on capacity, cost, quality and payback, placing it within Industry 4.0 adoption, and planning its effects on the workforce and skills
LengthAbout 1,060 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 690 Module 3

1

Twelve Empty Welding Booths: The Case and the Workforce Plan for Rimefield's Robotic Cells

[Student Name]

Southern New Hampshire University

QSO 690: Topics in Operations Management

Automation Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingRimefield Plow & Spreader, its welding data, costs and plans in this QSO 690 assignment are invented.
2

Twelve Empty Welding Booths: The Case and the Workforce Plan for Rimefield's Robotic Cells

Introduction

Rimefield Plow & Spreader's welding department builds the moldboards, the curved steel faces that push snow, and the A-frames and push frames that attach plows to trucks. It employs 34 welders on two shifts and adds seasonal welders from August to December. For three seasons it has failed to fill about 12 of those seasonal positions, because skilled welders in central Minnesota have other choices. The gap is covered by overtime, about 21,000 hours in the last busy season, and by late shipments when overtime runs out. Rework on welds runs about 4.1 percent of moldboards and frames, mostly from fatigue late in long shifts. This paper evaluates two robotic welding cells, places them in the context of Industry 4.0 adoption and sets a plan for the welders.

What this page is doingStates the operational problem.
3

The Proposal

Each proposed cell has two robot arms on a positioner, so that an operator loads one fixture while the robots weld the other. The cells would handle the long, repetitive seams on moldboards and frames for the 14 highest-volume plow models, about 60 percent of welding hours on those parts. Short-run models, repair work and complex joints would remain manual. Each robot records current, voltage, wire feed and travel speed for every weld, linked to the part's serial number, so that a field failure can be traced to the weld that produced it.

What this page is doingDescribes the cells.
4

Capacity, Cost and Quality

Investment and payback

ItemCurrentWith cells
Seasonal overtime hoursabout 21,000about 7,000
Unfilled seasonal welding positions120, with 6 fewer seasonal hires needed
Weld rework, share of moldboards and frames4.1%about 1.5%
Busy-season late shipments due to weldingabout 310 unitsunder 50 units
ItemAmount
Two cells, fixtures, installation and training$1.9 million
Annual overtime premium savedabout $340,000
Rework and scrap savedabout $120,000
Margin on shipments no longer late or lostabout $160,000
Added maintenance, programming time and powerabout $60,000
Net annual benefitabout $560,000
Simple paybackabout 3.4 years

The savings were built from Rimefield's payroll and quality records, not the vendor's brochure, whose payback of under two years assumed year-round three-shift use. Off-season utilization is the weakest point. From January to June, the cells will run one shift on moldboard and frame stock for the coming season and on custom parts for two agricultural equipment customers, keeping utilization near 55 percent.

What this page is doingBuilds the case from plant data.
5

Where This Fits in Industry 4.0

Frank et al. (2019) found in a survey of 92 manufacturers that firms adopting Industry 4.0 technologies tended to begin with smart manufacturing technologies on the plant floor and that analytics and big data remained at low levels of adoption. Dalenogare et al. (2018) found that managers expected some Industry 4.0 technologies to contribute far more to industrial performance than others. Rimefield's cells fit that pattern: a floor technology aimed at a measured problem, with sensors that create the first useful production data the plant has had. The weld records are the first step toward the predictive maintenance and quality analytics the company might adopt later; they are not presented as a digital transformation.

What this page is doingPlaces the investment on an adoption path.
6

Tasks and Jobs

Autor (2015) argues that automation substitutes for workers in routine, codifiable tasks while complementing them in tasks requiring problem solving, adaptability and judgment, which is why automation has historically raised demand for many kinds of work rather than simply eliminating it. The welding cells follow this pattern. They take over long, repetitive seams on high-volume parts, the work that causes fatigue and rework. They do not take over fitting irregular parts, welding short runs, repairing returned plows or the judgment needed when a frame is out of square. They create new tasks: programming robot paths, setting up fixtures, inspecting welds against the robot's data and maintaining the arms.

What this page is doingAnalyzes what changes for the welders.
7

Workforce Plan

The plan commits to no layoffs of permanent welders as a result of the cells. Eight volunteers from the current welders will be trained as cell operators and programmers through a twelve-week program run with a local technical college, with a pay step on completion. The remaining welders will move toward complex, low-volume and repair work, where their skill is most valuable and where rework has been lowest. Seasonal hiring will fall by about six positions, which Rimefield has not been able to fill anyway. Welders were briefed before the purchase was approved, and two of the most experienced will help design the fixtures, since they know which seams fail.

What this page is doingSets out what happens to people.
8

Implementation

The cells will be installed in March and April, after the busy season ends and before stock building for the next season begins. The first cell will be commissioned on the two highest-volume moldboards and run beside manual welding for four weeks, so that weld quality can be compared part by part before the manual line is reduced. The second cell follows in May. Programming for the remaining models will be done by the newly trained operators with the vendor's applications engineer, which builds their skill on real parts rather than in a classroom alone. Weld data from the robots will be reviewed weekly by the quality engineer, and any seam whose current or travel speed drifts outside its limits will be flagged before the part leaves the cell. By August, the cells should be welding all 14 target models, with manual welders on short runs, repairs and the complex joints the robots cannot reach.

What this page is doingSequences the installation.
9

Risks

The main risks are lower than planned utilization in the off-season, a slower learning curve on programming, robot downtime during the busy months and resentment if the commitment to no layoffs is doubted. Under the service agreement, the robot maker must have a technician at the plant by the next day in any month from August to December, and a spare positioner motor will be kept on site.

What this page is doingStates what could go wrong.
10

Conclusion

Two robotic welding cells address a measured problem, chronic unfilled positions and fatigue-driven rework in the busy season, and pay back in about 3.4 years on the plant's own numbers. They are a sensible first step on an Industry 4.0 path, adding sensors and data without pretending to transform the plant. The investment is recommended together with a workforce plan that retrains eight welders, keeps the rest on the work that most needs their skill and treats the cells as tools for the welders rather than replacements for them.

What this page is doingSummarizes the recommendation.
11

References

Autor, D. H. (2015). Why are there still so many jobs? The history and future of workplace automation. Journal of Economic Perspectives, 29(3), 3-30. https://doi.org/10.1257/jep.29.3.3

Dalenogare, L. S., Benitez, G. B., Ayala, N. F., & Frank, A. G. (2018). The expected contribution of Industry 4.0 technologies for industrial performance. International Journal of Production Economics, 204, 383-394. https://doi.org/10.1016/j.ijpe.2018.08.019

Frank, A. G., Dalenogare, L. S., & Ayala, N. F. (2019). Industry 4.0 technologies: Implementation patterns in manufacturing companies. International Journal of Production Economics, 210, 15-26. https://doi.org/10.1016/j.ijpe.2019.01.004

What the QSO 690 Module 3 instructions ask for

The Module 3 assignment in QSO 690 typically asks students to analyze a technology or automation decision in the context of Industry 4.0 or advanced manufacturing. Expect to describe the technology, evaluate its effects on capacity, cost, quality and flexibility, estimate a financial return and discuss implementation, including the effects on employees and skills. Strong papers tie the technology to a specific operational problem rather than to the trend, quantify benefits with realistic assumptions, consider which tasks the technology replaces and which it makes more valuable, and plan for training and redeployment. They also explain how the investment fits a step-by-step path of adoption rather than an all-at-once transformation, and they state the risks, such as low utilization in the off-season.

How this QSO 690 Module 3 automation assignment example is built

The assignment evaluates two robotic welding cells for moldboards and A-frames at Rimefield Plow & Spreader, a fictional Minnesota snowplow maker whose 34 welders leave 12 seasonal positions unfilled and work about 21,000 overtime hours. The $1.9 million cells would weld about 60 percent of those seams, cut overtime by about 14,000 hours, reduce rework from 4.1 to about 1.5 percent and pay back in about 3.4 years, while sensors record every weld. The paper places the cells within Industry 4.0 adoption patterns, explains why they complement most welders and sets a workforce plan: no layoffs, eight welders trained as operators and programmers and fewer seasonal hires. Frank and colleagues, Dalenogare and colleagues and Autor are cited.

Where the QSO 690 Module 3 rubric puts the points

Grading in the QSO 690 automation assignment generally rewards a technology tied to a clear operational problem, realistic estimates of capacity, cost and quality effects, a sound payback or return calculation, attention to utilization across the year, an analysis of which tasks change for workers, a credible training and redeployment plan, a place for the investment within a broader adoption path and research on technology adoption and work. Papers stand out when the workforce plan is as specific as the financial case. They lose credit for treating automation as self-justifying, for ignoring off-season utilization, for headcount savings with no plan for people or for vendor claims repeated as facts. A clean payback table and properly formatted APA references round out the score.

QSO 690 Module 3 help: the mistakes that cost points

Start with the problem: what can your operation not do today, and what does that cost? Describe the technology and what it would take over. Estimate its capacity, cost, quality effects and payback with assumptions you can defend, including how much it will be used in slow months. Then look at the work task by task: which tasks the machine takes, which remain and which become more important, such as programming, setup and inspection. Plan for the people: training, new roles, hiring changes. Place the investment in a sequence of steps rather than a leap. Papers often present the vendor's payback as the case; a good paper rebuilds it from the plant's own numbers and answers what happens on the floor.

Get QSO 690 Module 3 written to your instructions

Share the QSO 690 Module 3 instructions and your automation proposal. A writer builds the capacity, cost, quality and payback case, places the technology within research on Industry 4.0 adoption, analyzes which tasks it replaces and which it complements, sets a workforce and skills plan and supports the recommendation with research on automation and work. Your first QSO 690 assignment is written free, generally in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 690 papers and related MS Operations Management samples

QSO 690 Module 3 questions, answered

Where can I find a free QSO 690 Module 3 automation sample?

This page holds the full QSO 690 Module 3 assignment: robotic welding cells and a workforce plan for an invented snowplow maker.

What is Industry 4.0?

The integration of connected, data-driven technologies such as sensors, automation, analytics and networked systems into manufacturing and supply chains.

Does automation always eliminate jobs?

No. Automation replaces some tasks but often increases demand for complementary tasks such as programming, maintenance, setup and problem solving.

How is payback calculated for an automation project?

By dividing the investment by the annual net savings, such as reduced overtime, rework and hiring costs, to estimate how many years recover the cost.

How should a company prepare workers for automation?

By identifying which tasks change, training workers for new roles, involving them early and planning redeployment rather than layoffs where possible.