| Course | QSO 690 Topics in Operations Management |
|---|---|
| Module | Module 9 |
| Paper type | graduate final project analyzing an organization against current operations topics and recommending a prioritized, sequenced agenda with costs, benefits, dependencies, risks and measures tied to the organization's competitive priorities |
| Length | About 1,140 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 690 Module 9
A Three-Year Operations Agenda for Rimefield Plow & Spreader
[Student Name]
Southern New Hampshire University
QSO 690: Topics in Operations Management
Final Project
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
A Three-Year Operations Agenda for Rimefield Plow & Spreader
Introduction
Rimefield Plow & Spreader earns most of its revenue in five months and spends the rest of the year preparing for them. During this course, its operations team examined seven initiatives drawn from current topics in operations management: nearshoring hydraulic units, robotic welding, postponed final assembly, remanufacturing trade-in plows, predictive maintenance, salt-saving spreader controls and a data reporting service for towns. Each has merit, and together they would overwhelm a plant of 610 people. This report sets Rimefield's competitive priorities, evaluates the initiatives against them and recommends a three-year agenda that sequences them by value, dependency and the company's capacity to change.
Current Operations
Rimefield's baseline, last busy season
| Measure | Value |
|---|---|
| Plows forecast and sold | 11,800 forecast; about 12,600 sold |
| Plows in wrong configuration | about 1,900 |
| Hydraulic unit shortages | about 1,100 units, air freight about $96,000 |
| Welding overtime | about 21,000 hours; 12 positions unfilled |
| Weld rework | 4.1% of moldboards and frames |
| Unplanned laser downtime | about 140 hours |
| On-time dealer shipments, August to December | about 84% |
Competitive Priorities
Ward et al. (1998) developed measures of the four competitive priorities usually discussed in operations, cost, quality, delivery and flexibility, and showed that plants emphasize them differently. Rimefield's dealers and their customers are clear about what matters: when snow is forecast, a town needs its plow mounted and working, so delivery reliability in August through December comes first, followed by quality, because a plow that fails in a storm is worse than a late one, then flexibility in configuration and finally cost. Lasting gains in manufacturing, one well-known argument runs, pile up in layers, quality first, then dependability, then speed, with cost falling last, instead of being bought by sacrificing one priority for another (Ferdows & De Meyer, 1990). The agenda follows that logic: quality and dependability come first, cost improvements follow from them.
Evaluating the Initiatives
Initiative evaluation
| Initiative | Main priority served | Investment | Annual benefit at full run rate | Depends on |
|---|---|---|---|---|
| Nearshore hydraulic units to Monterrey | Delivery, cost | about $150,000 transition | about $620,000 at 80% of volume | none |
| Postponed final assembly | Delivery, flexibility | about $380,000 | about $1.7 million | Shorter hydraulic lead time helps |
| Robotic welding cells | Delivery, quality | $1.9 million | about $560,000 | Weld data feeds later analytics |
| Remanufacturing trade-in plows | Cost, sustainability | about $450,000 | about $800,000 | Spare welding capacity from cells |
| Predictive maintenance on lasers | Delivery | about $35,000 | about $90,000 | Data export and cause coding |
| Standard salt-saving controls | Quality, sustainability | about $200,000 engineering | margin-neutral; customer savings | Dealer calibration program |
| Data reporting service for towns | Flexibility, new revenue | about $300,000 | uncertain until pilot | Standard controls widen the installed base |
The benefits above are each initiative's own, estimated in its milestone analysis, and were checked to avoid counting the same saving twice; for example, overtime reduced by postponed assembly is not also counted under the welding cells.
Recommended Sequence
Year one addresses the busy season's biggest failures. Moving 80 percent of hydraulic units to Monterrey cuts lead time from 16 weeks to three, which makes postponed final assembly practical, since hydraulic packages can be ordered closer to dealer orders. The robotic welding cells go in during the spring, when the plant is quiet. Ellram et al. (2013) found that firms weigh different location drivers by region and that perceived risks shift with policy, which is why the Monterrey decision carries triggers for review each March.
Year two builds on year one. The welding cells free manual welders and booth space that the remanufacturing program needs. The data export and cause coding started for the welding cells extend to the laser cutters, making predictive maintenance possible. Salt-saving controls become standard on new spreaders once the dealer calibration program is ready.
Year three takes on the most uncertain initiative. The data reporting service is piloted with 40 trucks in year two but scaled only in year three, after the standard controls have widened the installed base and the pilot has shown whether towns renew. The in-house hydraulic assembly question is revisited with two seasons of Monterrey data.
Financial Summary
Investment and benefits by year
| Year | Investment | Annual benefit reached by end of year |
|---|---|---|
| One | about $2.4 million | about $2.9 million |
| Two | about $0.7 million | about $3.8 million |
| Three | about $0.8 million | about $3.8 million plus data service revenue |
| Total | about $3.9 million |
The year-three investment includes the data service and a possible engineering study for in-house hydraulics. Benefits exclude the data service until its pilot proves willingness to pay.
What the Agenda Leaves Out
Some topics studied in the course are deliberately left out of the three-year agenda. A plantwide digital twin was considered and set aside, because the plant does not yet collect the data such a model would need and the weld and laser data projects are a more realistic start. A second plant in a southern state, closer to growing markets, was raised by the sales team but would split a workforce that is already hard to staff; it will be revisited if sales outside the upper Midwest reach a third of revenue. Recording these omissions matters because the executive team will hear about both ideas again, and the agenda should show that they were weighed rather than forgotten.
Owners and Measures
Owners and measures
| Initiative | Owner | Measures |
|---|---|---|
| Monterrey sourcing | Purchasing director | Landed cost per unit; on-time delivery August to November |
| Postponed final assembly | Plant manager | Orders shipped within three days; plows in wrong configuration |
| Welding cells | Welding manager | Overtime hours; weld rework rate; cell utilization |
| Remanufacturing | Aftermarket manager | Rebuilt units sold; margin after cannibalization |
| Predictive maintenance | Maintenance manager | Unplanned laser hours; alerts confirmed |
| Salt-saving controls | Engineering director | Share of spreaders calibrated; customer salt per lane mile |
| Data service | Sales director | Pilot renewals; revenue per truck |
The operations director reviews these measures monthly with the owners and reports to the executive team quarterly.
Risks of the Agenda
The largest risk is doing too much during the busy season. No new initiative will start between August and December; installation, training and pilots are scheduled for January through July. A second risk is that year one's changes all touch final assembly at once, so the plant manager has a contingency of building 15 percent of common configurations complete in advance. A third is people: welders, assemblers and technicians are asked to learn new methods in successive years, and the workforce plan from the welding cells, no layoffs and paid training, extends to the whole agenda.
Conclusion
Rimefield's agenda puts delivery reliability in the busy season first and builds on quality, consistent with the view that capabilities accumulate. Year one fixes the supply and build problems that caused last season's failures, year two adds programs that depend on those changes, and year three scales the most uncertain idea only after a pilot. About $3.9 million of investment over three years should yield about $3.8 million a year in benefits, with owners and measures that let the company see whether it is working.
References
Ellram, L. M., Tate, W. L., & Petersen, K. J. (2013). Offshoring and reshoring: An update on the manufacturing location decision. Journal of Supply Chain Management, 49(2), 14-22. https://doi.org/10.1111/jscm.12019
Ferdows, K., & De Meyer, A. (1990). Lasting improvements in manufacturing performance: In search of a new theory. Journal of Operations Management, 9(2), 168-184. https://doi.org/10.1016/0272-6963(90)90094-T
Ward, P. T., McCreery, J. K., Ritzman, L. P., & Sharma, D. (1998). Competitive priorities in operations management. Decision Sciences, 29(4), 1035-1046. https://doi.org/10.1111/j.1540-5915.1998.tb00886.x
What the QSO 690 Module 9 instructions ask for
The QSO 690 final project usually asks students to apply the course's topics to an organization and recommend actions, often as a report that integrates several topics into an operations strategy or improvement agenda. Expect to assess the organization's current operations, identify which topics apply, evaluate initiatives with evidence and recommend a plan with costs, benefits, a timeline and measures. Strong projects anchor the agenda in the organization's competitive priorities, rank initiatives by value and feasibility rather than presenting them as equals, sequence them so that early steps build capabilities later steps need, avoid overloading the organization in any one period and set measures that show progress. Research on operations strategy gives the agenda its logic.
How this QSO 690 Module 9 final project example is built
The project recommends a three-year operations agenda for Rimefield Plow & Spreader, a fictional Minnesota snowplow maker. Delivery reliability in the busy months is the first priority, with quality its foundation. Year one moves hydraulic units to Monterrey, postpones final assembly and installs robotic welding cells; year two adds remanufacturing, predictive maintenance on the lasers and standard salt-saving controls; year three scales a data reporting service and revisits in-house hydraulics. About $3.9 million of investment yields about $3.8 million a year at full run rate. Dependencies, owners, measures and the risk of doing too much in a seasonal plant are set out. Ward and colleagues, Ferdows and De Meyer and Ellram and colleagues are cited.
Where the QSO 690 Module 9 rubric puts the points
Marks on the QSO 690 final project typically go to an accurate assessment of current operations, competitive priorities stated and used, initiatives drawn from the course topics and evaluated with evidence, a sequence justified by value, dependencies and capacity, a financial summary, owners and measures for each initiative, risks with responses and research that supports the logic of the agenda. Projects stand out when the order of initiatives is as well argued as their selection. They lose points for agendas that start everything at once, for benefits double counted across initiatives, for ignoring the organization's capacity to change or for measures that cannot be tracked. A financial table that adds up and correct APA entries close out the mark.
QSO 690 Module 9 help: the mistakes that cost points
Start with what your organization competes on and where it falls short today, with numbers. List the initiatives you studied and evaluate each on benefit, cost, risk and fit with that priority. Then ask which must come first: some create the data, skills or capacity others need. Spread the work so that no period is overloaded, especially the busiest one. Build a table of investment and annual benefit, checking that no saving is counted twice. Give each initiative an owner and two or three measures. Name the risks of the agenda as a whole, not just of each piece. Final projects often stack every milestone recommendation in year one; the stronger ones show why the order matters.
Get QSO 690 Module 9 written to your instructions
Send the QSO 690 capstone instructions, notes from your instructor and the operation you chose. A writer analyzes the operation against the topics studied, sets competitive priorities, sequences initiatives by value and dependency, tabulates investment and benefits, assigns owners and measures and states risks, supported by operations strategy research. Your first QSO 690 project is drafted free, typically inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 690 papers and related MS Operations Management samples
- QSO 690 Module 1 Discussion: Which Topics Matter for a Seasonal Plant
- QSO 690 Module 2 Location Decision Assignment: Hydraulic Units From China, Mexico or Minnesota
- QSO 690 Module 3 Automation Assignment: A Robotic Welding Cell and the Welders
- QSO 690 Module 4 Discussion: Selling Spreader Data to Towns
- QSO 690 Module 5 Forecasting and Postponement Assignment: Last Winter's Snow and the Final Build
- QSO 690 Module 6 Closed-Loop Assignment: Remanufacturing Trade-In Plows
- QSO 690 Module 7 Discussion: Smart Spreaders and Salty Lakes
- QSO 690 Module 8 Maintenance Analytics Assignment: Predicting Laser Cutter Failures
- QSO 690 Module 10 Discussion: Seasonal Workers in an Automated Plant
- OL 630 Module 4 Discussion: Hiring and HR in a Small Business
- OL 690 Module 9 Final Project: The Consulting Report
- OL 500 Module 9 Final Project: Case Study Analysis and Recommendations
- FIN 610 Module 1 Discussion: Why a Profitable Distributor Runs Short of Cash
QSO 690 Module 9 questions, answered
Where can I find a free QSO 690 Module 9 Final Project sample?
Right here: the complete QSO 690 Module 9 capstone, sequencing seven initiatives over three years for an invented snowplow maker.
What is an operations agenda?
A prioritized, sequenced plan of operations initiatives with costs, benefits, owners and measures, aligned with the organization's strategy.
How should operations initiatives be prioritized?
By their contribution to competitive priorities, their cost and risk, the capabilities they create for later steps and the organization's capacity to change.
What are competitive priorities?
The dimensions on which operations help a firm compete, usually cost, quality, delivery and flexibility, often with one or two emphasized.
Why sequence improvements rather than doing them all at once?
Because initiatives compete for the same people and attention, and some build the skills or data that make later ones succeed.