OL 690 Module 9 Final Project Example

Reviewed by Portia Lambrick, MBA

This OL 690 Module 9 Final Project sample is a complete consulting report on a chosen company's corporate responsibility across people, the planet and profit, with an introduction, an analysis of issues, recommendations and an implementation plan. SNHU OL 690 (OL-690) collects this report in Module 9 as the end point of the MS Organizational Leadership course on responsible leadership. The client is Corvane Materials, an invented recycler of electric vehicle batteries. The report explains how dependence on two customers, a plant rushed into service, unsafe storage, an unsupported green claim and weak supplier oversight form one chain of cause, and it recommends seven changes with owners, costs, measures and a two-year schedule that a board could adopt.

CourseOL 690 Responsible Corporate Leadership
ModuleModule 9
Paper typegraduate consulting report on a chosen company's corporate responsibility across people, the planet and profit, with an introduction, analysis of issues, recommendations and an implementation plan
LengthAbout 1,630 words, 8 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 690 Module 9

1

Building Responsibility Into Growth: A Consulting Report for the Board of Corvane Materials

[Student Name]

Southern New Hampshire University

OL 690: Responsible Corporate Leadership

Final Project: Consulting Report

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingCorvane Materials, its board and every figure in this OL 690 consulting report are invented for teaching.
2

Building Responsibility Into Growth: A Consulting Report for the Board of Corvane Materials

Summary for the Board

Corvane Materials does important environmental work, and its record on people, risk and honesty has not kept pace with its growth. The company's injuries, the March 2024 fire at Gaffney, its unsupported zero-waste claim, unsafe conditions at a scrap supplier and its exposure to two customers are not separate problems. They come from one pattern: the company grew faster than the systems that should manage the risks of handling damaged batteries. This report recommends seven changes costing about $17 million in capital and $1.9 million a year in operating expense, most of it in the first year. They would protect the company's permit to expand, its customer relationships and its ability to hire, and they would meet duties to workers and neighbors that do not depend on the payoff.

What this page is doingStates the finding and the plan.
3

Introduction

Two engineers from a Nevada cell factory started Corvane in 2017 so that the metals in rejected cells could be reused rather than buried. Today the company turns used packs and factory scrap into black mass at its Sparks and Gaffney sites and refines nickel, cobalt and lithium salts at Sparks. It employs about 1,150 people. Revenue fell from $412 million in 2023 to $268 million in 2024 as metal prices dropped, and the company lost $71 million.

For the planet, Corvane's contribution is genuine: company data show nearly all incoming nickel and cobalt leaving Sparks as battery-grade salts, and most process water is cleaned and used again. For people, it pays starting wages above local averages and runs a respected apprenticeship at Sparks. For profit, it has built a business on which two large battery makers depend. Against this record stand an injury rate twice the company's target, a fire that kept 900 neighbors indoors for nine hours, a slogan that hides 18,000 tons a year of landfilled byproduct, a layoff workers learned about from television and a supplier whose workers open battery modules barehanded. In the short term these lapses brought regulatory penalties and a three-week halt to receiving at Gaffney. Over the long term they threaten the expansion permit, the customers' trust and the credibility of everything Corvane says about itself.

What this page is doingPresents the company through people, planet and profit.
4

Analysis of Issues: People

Corvane's stakeholders include line workers, Gaffney's neighbors, its two main customers, investors and lenders, regulators and the workers of its collection partners. Donaldson and Preston (1995) argue that the core of stakeholder theory is normative: stakeholders' interests matter for their own sake, not only when attending to them pays. Measured that way, Corvane has served its customers and investors well and its least powerful stakeholders poorly.

Its injury rate in 2023, 6.2 recordable cases per 100 workers, came mostly from burns, cuts and heat illness. Gaffney started shredding in 2023 with its ventilation half built and a lone safety specialist for 410 people. Turnover there reached 41 percent in 2024. The October 2024 layoffs were legal but announced in a way that damaged trust. Neighbors had a legitimate claim to know what was stored behind the fence long before the fire made their claim urgent.

The supply chain extends the problem. A reporter's pictures from one Monterrey broker, a modest but steady source of packs for Sparks, showed modules opened without protective equipment. Corvane's only oversight had been a self-reported questionnaire. Locke et al. (2007), studying more than 800 Nike suppliers, found that monitoring alone did little and that conditions improved when buyers helped address the causes of poor practices. Corvane has done neither.

What this page is doingExamines workers, neighbors and suppliers.
5

Analysis of Issues: The Planet

Corvane's environmental strengths deserve protection in any plan. Its failures are concentrated in two places. First, damaged batteries were stored outdoors at almost twice the permitted volume at Gaffney for six weeks, ending in the fire, firefighting runoff in a drainage ditch and a state notice of violation. Second, the zero-waste slogan overstates the record. Delmas and Burbano (2011) link greenwashing to market rewards for green claims, weak regulation and poor coordination between marketing and operations, and all three conditions apply here. Because Corvane's customers sell their own vehicles as clean, a discredited claim at Corvane becomes their problem as well.

What this page is doingWeighs the environmental record.
6

Analysis of Issues: Profit and Sound Practice

Two customers buy 71 percent of Corvane's output, and its revenue moves with metal prices. That structure left management little room when prices fell, and its first proposals were to delay the Gaffney storage building and cut safety staff. Inside the plant, a scorecard that counted tons received but not yard volume, and an order that no truck be turned away, made overfilling the yard look like good performance. The meta-analysis by Kish-Gephart et al. (2010) traces wrongdoing at work to people, to the features of the dilemma and to the surrounding organization at once; at Gaffney, the surrounding organization carried most of the weight. Corvane's governance offers no counterweight: no board committee oversees safety or environment, and executive bonuses rest on volume and earnings alone.

What this page is doingExplains the business roots.
7

The Pattern Behind the Issues

The issues form a chain. Price exposure and customer concentration pushed fast growth and quick cuts. Fast growth put a half-finished Gaffney into service, and the heat, burns, departures and finally the yard fire followed from that. Metrics that rewarded volume and a culture in which warnings stalled turned that risk into an event. A slogan written before the refinery ran, and a supplier program built on paperwork, left gaps that outsiders found first. Each recommendation below breaks one link.

What this page is doingShows one chain of cause.
8

Recommendations: People

Recommendation 1: Build the fire-rated indoor storage building at Gaffney, about $14 million, and cap receiving at indoor capacity until it opens. Owner: chief operating officer. Measure: no damaged batteries stored outdoors; zero storage violations.

Recommendation 2: Put a single executive in charge of environment, health and safety with a direct line to the chief executive, bring the safety staff back up to full strength and station a second specialist at Gaffney, about $800,000 a year. Give every operator authority to stop receiving when storage reaches the permit limit, and set up a reporting channel to the vice president with a required reply within 48 hours. Owner: chief executive. Measure: injury rate at or below 3.0 by the end of 2026.

Recommendation 3: Finish Gaffney's cooling, extend the apprenticeship program there and adopt a rule that employees hear about layoffs or major changes from their own managers first, about $2.3 million in capital and $400,000 a year. Owner: vice president of human resources. Measure: Gaffney turnover below 25 percent within two years.

What this page is doingProposes three changes.
9

Recommendations: The Planet

Recommendation 4: Retire the zero-waste slogan and replace it with claims that can be verified, such as metal recovery rates and tons diverted from landfill, reviewed by the environmental team before release. Fund a study with the detergent maker and two fertilizer producers on uses for sodium sulfate, about $400,000. Owner: chief marketing officer with the refinery manager. Measure: every public environmental claim traceable to audited data.

Recommendation 5: Replace self-reported supplier questionnaires with a supplier development program: Corvane-funded protective equipment and training at its 40 collection partners, visits by its own safety staff and unannounced audits paid for by Corvane, about $700,000 a year. Begin with a ninety-day improvement plan at the Monterrey broker. Owner: vice president of supply. Measure: every partner visited within a year; documented corrections at every site with findings.

What this page is doingProposes two changes.
10

Recommendations: Profit and Governance

Recommendation 6: Reduce dependence on two buyers by selling to recyclers of grid storage batteries and to cathode makers, aiming for a book of business in which the biggest single buyer accounts for about a third of sales by 2028. Owner: chief commercial officer. Measure: customer shares reported quarterly.

Recommendation 7: Create a board committee on safety and sustainability and add safety, environmental and supplier measures to executive bonuses, weighted at 25 percent. In the 180-firm comparison by Eccles et al. (2014), the early adopters of sustainability policy were the ones whose directors carried formal duties for it and whose executives were paid partly on it, and by 2009 they had beaten their matched rivals on both stock and accounting returns. Owner: board chair. Measure: committee chartered within six months; first bonus cycle under the new weights in 2026.

What this page is doingProposes two changes.
11

Implementation Plan

Implementation schedule for the seven recommendations

PeriodActionsApproximate cost
First 90 daysCap receiving at indoor capacity; appoint safety vice president; retire slogan; start Monterrey plan; charter board committee$0.6 million
Months 4 to 12Build storage; restore safety staff; finish Gaffney cooling; launch supplier program and visits; adopt layoff communication rule$16.9 million
Year 2Extend apprenticeships; complete byproduct study; begin customer diversification; first bonus cycle with new measures$3.4 million

The first-year cost is heavy in a year of losses. Part can be funded by deferring discretionary spending, such as the new headquarters lease, sponsorships and a marketing campaign, worth about $9 million over two years, and part by a state incentive for the Gaffney expansion that depends on resolving the notice of violation. The business case is supported by research: Flammer (2015), studying shareholder proposals on responsibility that passed or failed by a few votes, found that passage brought better operating performance, partly through labor productivity. The ethical case, as Carroll (1991) frames it, does not depend on that payoff: once a company has seen its own stacks burn, keeping people safe from a repeat sits at the ethical tier of its obligations, whatever it costs.

What this page is doingSequences the work over two years.
12

Conclusion

Corvane Materials was founded to make battery production cleaner, and its refinery does that. The company's leaders now need to make the rest of the business as responsible as its mission. The seven recommendations build safety, honesty and supplier care into the systems that run the company, so that the next surge of scrap or slump in prices does not produce the next fire.

What this page is doingCloses the report.
13

References

Carroll, A. B. (1991). The pyramid of corporate social responsibility: Toward the moral management of organizational stakeholders. Business Horizons, 34(4), 39-48. https://doi.org/10.1016/0007-6813(91)90005-G

Delmas, M. A., & Burbano, V. C. (2011). The drivers of greenwashing. California Management Review, 54(1), 64-87. https://doi.org/10.1525/cmr.2011.54.1.64

Donaldson, T., & Preston, L. E. (1995). The stakeholder theory of the corporation: Concepts, evidence, and implications. Academy of Management Review, 20(1), 65-91. https://doi.org/10.5465/amr.1995.9503271992

Eccles, R. G., Ioannou, I., & Serafeim, G. (2014). The impact of corporate sustainability on organizational processes and performance. Management Science, 60(11), 2835-2857. https://doi.org/10.1287/mnsc.2014.1984

Flammer, C. (2015). Does corporate social responsibility lead to superior financial performance? A regression discontinuity approach. Management Science, 61(11), 2549-2568. https://doi.org/10.1287/mnsc.2014.2038

Kish-Gephart, J. J., Harrison, D. A., & TreviƱo, L. K. (2010). Bad apples, bad cases, and bad barrels: Meta-analytic evidence about sources of unethical decisions at work. Journal of Applied Psychology, 95(1), 1-31. https://doi.org/10.1037/a0017103

Locke, R. M., Qin, F., & Brause, A. (2007). Does monitoring improve labor standards? Lessons from Nike. ILR Review, 61(1), 3-31. https://doi.org/10.1177/001979390706100101

What the OL 690 Module 9 instructions ask for

The OL 690 final project is a consulting report that applies the course to a company case using a solution-based approach. It typically includes an introduction to the company through people, the planet and profit; an analysis of issues covering personnel and stakeholders, environmental impacts and responsible and irresponsible conduct, and sound business practices; recommendations for each of those areas; and an implementation plan. The report should incorporate the revised Milestone One introduction and outline and the Milestone Two analysis, addressing instructor feedback, and it should read as advice to the company's leaders rather than as a student essay. Strong reports make each recommendation specific, with the steps, the owner and the number that will show whether it worked.

How this OL 690 Module 9 final project example is built

The report advises the board of Corvane Materials, a made-up recycler that recovers most of the metal in used batteries but has a record of injuries, a March 2024 yard fire at its Gaffney plant, an unsupported zero-waste slogan, unsafe conditions at a Monterrey scrap broker and two customers buying 71 percent of its output. It argues that these share one cause, growth that outran the systems meant to manage risk, and it recommends seven changes, among them a fire-rated storage building, a safety vice president reporting to the chief executive, verifiable environmental claims, a supplier development program and safety measures in executive pay. Carroll, Donaldson and Preston, Delmas and Burbano, Flammer, Locke's team and Eccles's team ground the report.

Where the OL 690 Module 9 rubric puts the points

In the OL 690 final project, instructors generally weigh a clear introduction through people, planet and profit, a thorough analysis of issues that integrates the milestones and feedback, recommendations for each area that follow from the analysis, a realistic implementation plan, support from course research and professional presentation as a consulting report. The highest scores go to reports that show how issues connect, give each recommendation an owner, cost, timeline and measure and acknowledge trade-offs the client will face. Reports lose credit when milestones are pasted together, when recommendations are generic or unfunded, when implementation is missing or when the company's strengths are ignored. The last rubric rows cover APA style and a consultant's polish.

OL 690 Module 9 help: the mistakes that cost points

Write the report for its audience: a board or leadership team that wants to know what is wrong, why and what to do. Start with a short summary of the main finding and the recommendations, then let the analysis explain them. Rework the milestone material instead of pasting it, and make sure the numbers agree everywhere. For each recommendation, state the action, the person responsible, the cost and the measure of success, and put them in an order that the company could fund. A common mistake is a report that criticizes without recognizing the company's real accomplishments; another is an implementation plan with no dates. Address the trade-offs honestly, especially costs during a weak year, and say why the plan is worth it.

Get OL 690 Module 9 written to your instructions

Upload both OL 690 milestones, your instructor's comments and the Module 9 guidelines. A writer turns them into one consulting report: a tight introduction, an analysis of people, planet and profit that shows causes, recommendations with owners, costs and measures and an implementation schedule a board could approve. The first OL 690 consulting report is drafted at no cost, often in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 690 papers and related MS Organizational Leadership samples

OL 690 Module 9 questions, answered

Where can I find a free OL 690 Module 9 Final Project sample?

This page holds the complete OL 690 final project: a consulting report on an invented battery recycler's record for people, planet and profit, with seven recommendations and a schedule.

What is the OL 690 final project?

A consulting report on a chosen company that introduces it through people, the planet and profit, analyzes its issues, recommends improvements and lays out how to implement them.

How should I structure the OL 690 consulting report?

A common structure is summary, introduction, analysis of issues by people, planet and profit, recommendations by area, implementation plan, conclusion and references.

How specific should OL 690 recommendations be?

Specific enough to act on: what will be done, by whom, at what cost, by when and how success will be measured, with a reason drawn from the analysis.

Can I use a well-known company for the OL 690 consulting report?

Yes, many students do; choose one with a documented record of both strengths and problems so the analysis and recommendations have substance.