OL 690 Module 8 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 690 Module 8 Discussion sample explains an organizational ethics failure through culture, leadership and employee voice instead of individual blame. SNHU OL 690 (OL-690) looks inside the company in this module of its MS Organizational Leadership course on responsible leadership. At Corvane Materials, an invented battery recycler, shift leads at the Gaffney plant stacked damaged packs outdoors beyond the permit for weeks before they burned, operators who warned a supervisor in February heard nothing back and the plant's scorecard rewarded tons received while ignoring yard volume. The post uses research on individual, issue and organizational sources of unethical choices, on how ethical leadership flows down a hierarchy and on when employees speak up.

CourseOL 690 Responsible Corporate Leadership
ModuleModule 8
Paper typegraduate discussion post explaining an organizational ethics failure through culture, leadership and employee voice rather than individual blame
LengthAbout 450 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 690 Module 8

1

Module Eight Discussion

Bad Apple or Bad Barrel at Gaffney?

The fire at Corvane Materials' Gaffney yard on March 9, 2024, looks at first like one manager's mistake. The plant manager had told shift leads in January that no scrap truck was to be turned away, because the plant's largest customer was shipping more rejected cells than expected. The warehouse filled in late January, and from then on shift leads stacked damaged packs in the outdoor yard. In February two operators told their supervisor that the stacks were too high and too close together. The supervisor said he would pass it on. Nothing changed. The plant scorecard reviewed every Monday by the regional vice president showed tons received and tons shredded, both at record levels, and had no line for yard volume.

What this page is doingWhat happened before the fire.
2

Kish-Gephart et al. (2010) combined three decades of studies into one meta-analysis and concluded that bad choices at work grow from the person, from the dilemma itself and from the surrounding organization, each adding its own share. At Gaffney the individual factor was modest: no one wanted a fire. The issue factor mattered more, because the harm seemed distant and uncertain while the pressure to receive trucks was immediate. The organizational factor mattered most. The scorecard and the manager's order told everyone what counted, and an environment that rewards volume while ignoring the risk it creates makes the risky choice feel normal.

What this page is doingThree sources of a bad choice.
3

Mayer et al. (2009) found that ethical leadership at the top reaches employees mostly through their own supervisors: in departments whose supervisors were seen as ethical, staff misbehaved less and helped one another more. At Corvane, the signal flowing down from the top was that growth came first, and supervisors passed that signal on. In a restaurant chain whose 223 managers and their crews were surveyed twice, Detert and Burris (2007) found that managers' openness predicted whether employees raised improvement ideas, mostly through employees' sense that speaking up was safe. The Gaffney operators did speak up once. When nothing happened, they stopped.

What this page is doingLeadership and voice.
4

I doubt it. The plant manager made the order, but the scorecard, the regional reviews and the absence of any way to stop receiving would be waiting for the next manager. I would add yard volume and a red line at the permit limit to the Monday scorecard, give any operator the authority to stop receiving when storage reaches that line and set up a safety reporting channel that goes straight to the corporate safety vice president, with a reply required within 48 hours.

What this page is doingWould firing the manager fix it?
5

If you were Corvane's chief executive, would you fire the plant manager, and what message would that decision send to the supervisors and operators who saw the stacks too?

What this page is doingFor the thread.
6

References

Detert, J. R., & Burris, E. R. (2007). Leadership behavior and employee voice: Is the door really open? Academy of Management Journal, 50(4), 869-884. https://doi.org/10.5465/amj.2007.26279183

Kish-Gephart, J. J., Harrison, D. A., & TreviƱo, L. K. (2010). Bad apples, bad cases, and bad barrels: Meta-analytic evidence about sources of unethical decisions at work. Journal of Applied Psychology, 95(1), 1-31. https://doi.org/10.1037/a0017103

Mayer, D. M., Kuenzi, M., Greenbaum, R., Bardes, M., & Salvador, R. (2009). How low does ethical leadership flow? Test of a trickle-down model. Organizational Behavior and Human Decision Processes, 108(1), 1-13. https://doi.org/10.1016/j.obhdp.2008.04.002

What the OL 690 Module 8 instructions ask for

The Module 8 discussion in OL 690 usually asks how leaders shape the ethical culture of an organization and why responsible or irresponsible behavior spreads. Students often analyze a lapse at their chosen company, asking whether it came from individual wrongdoing, the nature of the decision or the organization's climate, incentives and leadership. Strong posts resist the easy story of a single bad actor and look at what the organization rewarded, what leaders modeled and whether employees could safely raise concerns. They use research on unethical decision-making, ethical leadership and voice, and they suggest changes a leader could make. Replies often test whether a classmate's proposed fix, such as a new code of conduct, would change behavior.

How this OL 690 Module 8 discussion example is built

The post examines the Gaffney yard fire at Corvane Materials, a fictional recycler. For six weeks, shift leads stacked damaged packs outdoors because the plant manager had ordered that no scrap truck be turned away; operators raised the stacks with a supervisor in February and heard nothing; and the plant scorecard counted tons received and shredded but not yard volume. The meta-analysis by Kish-Gephart and colleagues shows unethical choices drawing on individuals, the moral issue and the organizational environment. The trickle-down model tested by Mayer and colleagues and the Detert and Burris study of manager openness and voice explain why warnings stalled. The post asks whether firing the manager would fix anything.

Where the OL 690 Module 8 rubric puts the points

Marks for the OL 690 ethical culture discussion typically depend on a clear account of the lapse, analysis at more than one level, accurate use of research on ethical decisions, leadership and voice, practical changes to culture or incentives and replies that test a classmate's reasoning. The strongest posts show how goals, metrics and leaders' signals made the wrong choice look normal and suggest specific changes, such as new measures or a protected reporting channel. Points fall when a post blames one person and stops, proposes only training or a code, misuses research or offers replies without new ideas. APA citations and clear, careful writing finish the grade.

OL 690 Module 8 help: the mistakes that cost points

Reconstruct the lapse as a timeline: who decided what, what they were told to prioritize, what they knew and whom they could tell. Then sort the causes into the individual, the issue and the organization. Look hard at metrics and incentives, because people usually do what they are measured on. Ask what senior leaders said and did about the risk before it became a crisis, and whether employees who spoke up were heard or punished. A common mistake is treating a new ethics code as the answer; another is assuming that removing one manager changes a culture. Propose two or three concrete changes, such as a new scorecard measure, a stop-work rule or a reporting line that bypasses the chain of command.

Get OL 690 Module 8 written to your instructions

Paste the OL 690 Module 8 prompt and describe the lapse at your company. A writer traces it to individuals, the issue and the organization, explains with research how leadership and voice shaped it, proposes changes to culture and incentives and closes with a question that OL 690 peers can debate. The first ethics culture post is free and is drafted within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 690 papers and related MS Organizational Leadership samples

OL 690 Module 8 questions, answered

Where can I find a free OL 690 Module 8 Discussion sample?

The complete OL 690 Module 8 post is on this page; it explains why workers at an invented battery recycler kept stacking packs outdoors until they burned.

What are bad apples, bad cases and bad barrels?

A way of sorting the sources of unethical choices: the individual (bad apples), the characteristics of the moral issue (bad cases) and the organization's environment (bad barrels). Research finds all three matter.

How does ethical leadership affect employees?

Research on trickle-down effects finds that senior leaders' ethical leadership shapes supervisors' ethical leadership, which in turn relates to less misconduct and more helping behavior among employees.

Why don't employees speak up about problems?

Many judge speaking up to be risky. A study in a restaurant chain found that managers' openness predicted voice, working through employees' sense of psychological safety.

How can leaders build an ethical culture?

Measure and reward what matters for safety and integrity, model the standard personally, give employees protected ways to raise concerns and respond visibly when they do.