OL 690 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This OL 690 Module 3 Milestone One sample introduces a chosen company through people, the planet and profit and outlines its issues for the consulting report to come. SNHU OL 690 (OL-690) asks for this first milestone of its MS Organizational Leadership final project in Module 3. The company is Corvane Materials, an invented recycler of lithium-ion batteries in Nevada and South Carolina. The introduction covers its history, its commendable record on metal recovery and wages, its problems with a storage-yard fire, injuries and a green claim it cannot support, and the short- and long-term effects of those lapses. The outline then covers stakeholders, personnel relations, environmental impacts and sound business practices.

CourseOL 690 Responsible Corporate Leadership
ModuleModule 3
Paper typegraduate milestone introducing a chosen company through people, the planet and profit and outlining its issues: stakeholders, personnel relations, environmental impacts, responsible and irresponsible conduct and sound business practices
LengthAbout 1,170 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 690 Module 3

1

Corvane Materials Through People, Planet and Profit: Introduction and Issues Outline

[Student Name]

Southern New Hampshire University

OL 690: Responsible Corporate Leadership

Milestone One: Introduction and Analysis of Issues Outline

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingCorvane Materials, its plants, injuries, fire and financial results in this OL 690 milestone are all invented.
2

Corvane Materials Through People, Planet and Profit: Introduction and Issues Outline

Introduction

Corvane Materials was founded in 2017 by two battery engineers who had worked at an electric vehicle cell factory near Reno and watched truckloads of rejected cells leave for disposal. Their idea was to build a "mine above ground," recovering the nickel, cobalt and lithium in scrap and worn-out batteries so that new cells could be made without new mining. The company opened its first plant in Sparks, Nevada, in 2019, shredding batteries into black mass and refining it into battery-grade metal salts, and opened a second shredding plant in Gaffney, South Carolina, in 2023 to serve the factories rising in the Southeast. It now employs about 1,150 people. Revenue reached $412 million in 2023 before falling to $268 million in 2024 when metal prices dropped.

Through the lens of the planet, Corvane's accomplishments are substantial. Its Sparks refinery recovers about 95 percent of the nickel and cobalt in the material it processes, according to the company's figures, and each ton recovered is a ton that does not have to be mined. Through the lens of people, it pays starting wages of about $22 an hour, above the local averages in both towns, and it offers paid apprenticeships for maintenance technicians. Through the lens of profit, it built a business that two large battery makers rely on.

The record also shows serious issues. Its recordable injury rate in 2023 was twice its own target, driven by burns, cuts and heat illness. In March 2024, damaged batteries stacked outdoors at Gaffney, well beyond the permitted volume, caught fire, and 900 neighbors sheltered indoors for nine hours. Its marketing calls the process "zero waste" although about 18,000 tons a year of sodium sulfate byproduct go to a landfill. Two customers buy 71 percent of its output, and when prices fell it cut 180 jobs.

In the short term, these lapses brought a state notice of violation, a federal workplace safety citation, angry neighbors and a damaged reputation with customers who market their own cars as clean. In the long term, they threaten the company's permit to expand at Gaffney, its ability to hire in a tight labor market and the credibility of every environmental claim it makes. Bansal and Roth (2000), studying 53 firms in the United Kingdom and Japan, found that companies go green for competitiveness, legitimacy and a sense of ecological responsibility. Corvane's founders had the third motive; its recent record is now costing it the second.

What this page is doingCovers history and the three lenses.
3

Analysis of Issues Outline: Personnel

Five major stakeholders, using the power, legitimacy and urgency attributes in Mitchell et al. (1997):

Line workers at Sparks and Gaffney, about 900 people. Stake: safety, pay, steady work. Claim legitimate and urgent after the injuries; little power without a union.

Neighbors of the Gaffney plant, about 900 residents within half a mile. Stake: health, property values, information. Claim legitimate throughout; urgent and powerful only after the fire.

Two battery makers buying 71 percent of output. Stake: reliable supply, clean supply chain claims. Hold power, legitimacy and urgency.

Investors and lenders. Stake: return and repayment after a $71 million loss in 2024. Hold power and legitimacy.

State and federal regulators. Stake: compliance with storage permits and workplace safety rules. Hold power and legitimacy; urgency rose after March 2024.

Personnel relations elements:

Safety culture. Injury rate twice target; heat illness at Gaffney during the summer of 2023; a federal citation for gaps in the respirator program.

Layoffs and communication. 180 jobs cut in October 2024; the company paid sixty days of wages, but workers learned of the cuts from a local news report a day before managers told them.

Training and advancement. Apprenticeships at Sparks are a strength, but Gaffney has none and turnover there reached 41 percent in 2024.

What this page is doingLists stakeholders and personnel relations.
4

Analysis of Issues Outline: Environment

Positive environmental impacts:

Metal recovery. About 95 percent of nickel and cobalt recovered, reducing demand for new mining.

Keeping batteries out of landfills and informal dismantling. Packs collected from dealers and fleets are processed under controlled conditions instead of being dumped or broken open by hand.

Examples of responsible and irresponsible conduct:

Responsible: Sparks refinery recycles about 70 percent of its process water, an important practice in a desert basin.

Responsible: Corvane publishes the share of nickel and cobalt it recovers, which few competitors disclose.

Irresponsible: storing damaged batteries outdoors beyond permitted limits at Gaffney.

Irresponsible: advertising "zero waste" while landfilling sodium sulfate byproduct.

Short- and long-term effects of policies:

Short term, the overfilled yard saved warehouse costs during a surge of scrap but led to the fire, a notice of violation and a shutdown of receiving for three weeks.

Long term, the zero-waste claim risks a challenge under federal guidance on environmental marketing and undermines trust in claims that are true.

Long term, failure to invest in indoor storage could block the county's approval of a planned expansion.

What this page is doingLists impacts and conduct.
5

Analysis of Issues Outline: Sound Business Practices

Stakeholders whose treatment affects profit: the two battery makers, whose contracts are worth about $190 million a year and whose own climate claims depend on clean suppliers; line workers, whose turnover at Gaffney costs an estimated $6,500 per hire in recruiting and training; and the county, whose expansion approval is worth future capacity.

Practices that would benefit both stakeholders and profit: indoor, fire-rated storage sized for peak scrap; a safety program tied to managers' bonuses; honest environmental claims that can be verified; and broader customers to reduce dependence on two buyers.

Carroll (1991) places economic responsibility at the base of a company's duties. For Corvane, sound practice means treating safety and honesty as conditions for staying in business, not costs to be cut when prices fall.

What this page is doingTies stakeholders to profit.
6

Issues to Carry Forward

Not every issue in the outline deserves equal space in the consulting report. I rank them by the harm they can do and by how much Corvane's leaders control them. First is storage safety at Gaffney, because a second fire could injure people, close the plant and end the expansion plan, and the remedy is entirely in management's hands. Second is the injury rate, which harms workers every month and feeds the turnover that keeps Gaffney short of experienced hands. Third is the honesty of environmental claims, which is cheap to fix and costly to leave alone, since one exposed claim makes every true one suspect. Fourth is customer concentration, a profit issue that also shapes the others: a company that depends on two buyers will cut safety and staff first when either buyer slows orders. The layoff communication failure belongs with the people issues, because the way the cuts were announced did more damage to trust than the cuts themselves. Each of these four will become a section of Milestone Two, with evidence, causes and the first outline of what Corvane should do.

What this page is doingRanks the issues for Milestone Two.
7

Next Steps

Milestone Two will expand each outline point into a full analysis of Corvane's responsibilities to people, the planet and profit and will sketch recommendations and an implementation outline.

What this page is doingPoints toward Milestone Two.
8

References

Bansal, P., & Roth, K. (2000). Why companies go green: A model of ecological responsiveness. Academy of Management Journal, 43(4), 717-736. https://doi.org/10.2307/1556363

Carroll, A. B. (1991). The pyramid of corporate social responsibility: Toward the moral management of organizational stakeholders. Business Horizons, 34(4), 39-48. https://doi.org/10.1016/0007-6813(91)90005-G

Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Academy of Management Review, 22(4), 853-886. https://doi.org/10.5465/amr.1997.9711022105

What the OL 690 Module 3 instructions ask for

OL 690 Milestone One has two parts submitted in one file. The first is an introduction of three to four paragraphs that presents the chosen company through the lenses of people, the planet and profit: its history, its commendable accomplishments and possible issues and the short- and long-term impacts of any lack of responsible behavior. The second is a one- to two-page outline analyzing the company's issues, which may use short phrases and bullet-style points that later milestones expand. The outline typically covers personnel, naming three to five major stakeholders and two or three elements of personnel relations; environment, naming positive impacts, examples of responsible and irresponsible conduct and the effects of policies over time; and sound business practices that serve stakeholders and profit.

How this OL 690 Module 3 milestone one example is built

The milestone introduces Corvane Materials, an invented recycler founded in 2017 that turns used batteries and factory scrap into nickel, cobalt and lithium salts at Sparks, Nevada, and Gaffney, South Carolina. Its accomplishments include high metal recovery and starting pay above local averages; its problems include an overfilled outdoor yard that burned in March 2024, an injury rate twice its own target, a zero-waste claim contradicted by landfilled byproduct and heavy dependence on two customers. The outline sorts these under personnel, environment and sound business practice. The analysis rests on three readings: Carroll's tiers of duty, the power, legitimacy and urgency test from Mitchell and coauthors and the Bansal and Roth study of why firms go green.

Where the OL 690 Module 3 rubric puts the points

For OL 690 Milestone One, instructors generally score a complete introduction that covers history, accomplishments, issues and the impacts of irresponsible behavior through people, planet and profit, followed by an outline that names the required stakeholders, personnel elements, environmental impacts, responsible and irresponsible examples and sound business practices. The best submissions are specific and balanced, giving credit where the company earns it and naming problems with evidence, and their outlines already point toward recommendations. Marks fall when the introduction reads like company marketing, when the outline skips required items, when people, planet and profit blur together or when issues are asserted without sources. APA formatting and clarity complete the rubric.

OL 690 Module 3 help: the mistakes that cost points

Gather sources before writing: the company's own reports, but also news coverage, regulatory records, court filings and employee reviews. Draft the introduction last, after the outline shows you what matters, and give each of people, planet and profit at least two sentences with evidence. In the outline, count the required items carefully, since guidelines ask for specific numbers of stakeholders, personnel elements and environmental examples. Write short phrases, but make each one specific enough to grow into a paragraph later. A common mistake is choosing a company with no visible problems, which leaves the final report with nothing to fix; another is listing environmental positives taken from a sustainability report without checking them. Mark which issues the recommendations will address.

Get OL 690 Module 3 written to your instructions

Upload the OL 690 Milestone One guidelines and the company you picked. A writer drafts the three-to-four-paragraph introduction through people, the planet and profit, then outlines stakeholders, personnel relations, environmental impacts, responsible and irresponsible conduct and sound business practice so Milestone Two has a frame. A first OL 690 Milestone One is free and returns in around two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 690 papers and related MS Organizational Leadership samples

OL 690 Module 3 questions, answered

Where can I find a free OL 690 Module 3 Milestone One sample?

The whole OL 690 Milestone One is on this page: an invented battery recycler introduced through people, planet and profit, with a full issues outline.

What goes in the OL 690 Milestone One introduction?

Three to four paragraphs on the company's history through people, the planet and profit, its commendable accomplishments and possible issues and the short- and long-term impacts of irresponsible behavior.

Can the OL 690 issues outline use bullet points?

Yes. The guidelines allow short phrases and listed points that indicate what Milestone Two and the final report will expand, though each point should still be specific.

What does people, planet and profit mean?

It is the triple bottom line: judging a company by its effects on people such as workers and communities, on the natural environment and on its financial health, rather than by profit alone.

Which companies work well for the OL 690 consulting report?

Companies with a public record of both strengths and problems in labor, environmental and business conduct, so the analysis and recommendations have real material to work with.