OL 690 Responsible Corporate Leadership sample papers, module by module

Reviewed by Portia Lambrick, MBA

OL 690 asks how far a business should answer to society and the environment as well as to its owners, and how a leader turns that answer into decisions. The samples build a consulting report on one battery recycler's record for people, the planet and profit.

OL 690 is SNHU’s Responsible Corporate Leadership course. It centers on corporate social responsibility and responsible leadership: the responsibilities of business, stakeholder theory and salience, the triple bottom line of people, planet and profit, environmental claims and greenwashing, the business case for responsibility, supply chain labor standards, ethical culture and voice, and how responsibility is reported and rated. Every module below opens a full sample paper or takes a free request for one; searches like "ol 690 module 3", "OL690 sample paper" and "OL 690 milestone example" land on this page.

What OL 690 is really about

A required course in SNHU's MS Organizational Leadership, OL 690 examines the environments companies operate in to judge how attentive and responsive their leaders are, and ought to be, to the relationship between the enterprise and society. Work is credited when it weighs a company's record for employees, communities, the environment and investors with evidence, separates what a company claims from what it does and recommends changes a leadership team could fund and carry out.

All ten papers follow Corvane Materials, a made-up recycler founded in 2017 that shreds used lithium-ion batteries and factory scrap into black mass and refines nickel, cobalt and lithium salts from it, employing about 1,150 people in Sparks, Nevada, Gaffney, South Carolina, and a Reno head office. Corvane, its people and every event and number are illustrative.

What OL 690’s modules ask for

OL 690 commonly asks for discussions on corporate duties, stakeholders, green claims, the business case, supply chains, ethical culture and measurement, and a consulting report built in stages: Milestone One introduces the chosen company through people, the planet and profit and outlines its issues, Milestone Two drafts the analysis of issues with an outline of recommendations and implementation, and the final report in Module 9 joins them.

Where students lose points in OL 690

OL 690 papers lose credit when they repeat a company's sustainability report as fact, praise donations while skipping the core business, treat people, planet and profit as three unrelated lists, name stakeholders without saying what each is owed, offer recommendations with no cost, owner or timeline and leave out the short- and long-term effects of irresponsible behavior.

The OL 690 drawers

Module 1

OL 690 Module 1 Discussion example

The opening OL 690 post asks what Corvane Materials, an invented battery recycler in Nevada and South Carolina, owes besides returns to its investors, when its whole business is sold as good for the planet yet its Gaffney yard caught fire and it cut 180 jobs after a price slump; it places the company on Carroll's four levels of economic, legal, ethical and philanthropic duty, uses the Margolis and Walsh critique of the hunt for a payoff from social initiatives and the Aguinis and Glavas review of 588 articles, and asks whether a company with a green product earns any credit for it. Full sample paper, read it free.

Read the sample →
Module 2

OL 690 Module 2 Discussion example

Module 2 of OL 690 asks who mattered to Corvane Materials, the invented battery recycler, before and after the March 2024 fire at its Gaffney storage yard: neighbors who had no voice until smoke reached their street, line workers who stacked damaged packs outdoors because the warehouse was full, two battery makers buying 71 percent of its output and the state agency that found the permit exceeded; it applies the salience model of power, legitimacy and urgency from Mitchell, Agle and Wood, the descriptive, instrumental and normative strands in Donaldson and Preston and Maak and Pless's relational account of responsible leadership, and asks peers whether a stakeholder should have to gain power before it is heard. Full sample paper, read it free.

Read the sample →
Module 3

OL 690 Module 3 Milestone One example

Milestone One introduces Corvane Materials, a fictional recycler of electric vehicle batteries, through people, the planet and profit, notes what it does well, from recovering most of the nickel and cobalt in black mass to paying above local wages, and what it does badly, from an overfilled Gaffney yard to an unsupported zero-waste claim, then outlines its issues under personnel, environment and sound business practice as the consulting report's skeleton; it draws on Carroll's pyramid, the stakeholder attributes proposed by Mitchell and coauthors in 1997 and the ecological responsiveness study by Bansal and Roth. Full sample paper, read it free.

Read the sample →
Module 4

OL 690 Module 4 Discussion example

For the fourth OL 690 discussion the post weighs the slogan Corvane Materials prints on every truck, "zero-waste battery recycling," against the roughly 18,000 tons of sodium sulfate its invented Sparks refinery sends to a landfill each year; it uses the drivers of greenwashing set out by Delmas and Burbano, Lyon and Maxwell's model of disclosure under the threat of an activist audit and the legitimacy motive in Bansal and Roth's study of ecological responsiveness, proposes a claim the company can prove and asks peers whether an exaggerated claim about a genuinely green business is still greenwashing. Full sample paper, read it free.

Read the sample →
Module 5

OL 690 Module 5 Discussion example

The fifth OL 690 post sits in the room where Corvane Materials' finance chief, facing a $71 million loss after nickel and lithium prices fell, proposes deferring a $14 million indoor storage building at Gaffney and trimming the safety staff; it weighs the 52-study meta-analysis of Orlitzky, Schmidt and Rynes, the matched-pair comparison of high- and low-sustainability firms by Eccles, Ioannou and Serafeim, Flammer's study of shareholder proposals that passed or failed by a few votes and Kölbel, Busch and Jancso's evidence that bad press raises financial risk, and asks peers what responsibility spending they would protect in a downturn. Full sample paper, read it free.

Read the sample →
Module 6

OL 690 Module 6 Milestone Two example

Milestone Two turns the Corvane Materials outline into a full analysis: the people section traces the invented recycler's injuries, Gaffney turnover and a layoff announced through the local news, the planet section weighs 95 percent metal recovery against an overfilled yard that burned and a byproduct landfilled under a zero-waste slogan, and the profit section shows how dependence on two buyers turned a price slump into cuts to safety; it rests on Carroll's pyramid, the salience model of Mitchell and coauthors, the greenwashing drivers of Delmas and Burbano and the Eccles, Ioannou and Serafeim study, and closes with an outline of six recommendations and an implementation sequence. Full sample paper, read it free.

Read the sample →
Module 7

OL 690 Module 7 Discussion example

In the seventh OL 690 thread a reporter's photographs show workers at a Monterrey scrap broker, one of the 40 collection partners that sell used packs to Corvane Materials, the invented recycler, prying open battery modules barehanded beside a smoking bin; the post asks how far Corvane's duty reaches, weighs the audits of more than 800 Nike suppliers examined by Locke, Qin and Brause and the analysis of nearly 17,000 supplier audits by Short, Toffel and Hugill, proposes pairing audits with training and paid-for protective gear, and asks peers whether a buyer should drop a bad supplier or stay and fix it. Full sample paper, read it free.

Read the sample →
Module 8

OL 690 Module 8 Discussion example

The eighth OL 690 post goes behind the Gaffney storage yard fire at Corvane Materials, the invented battery recycler: shift leads who stacked damaged packs outdoors under orders to keep receiving trucks, operators whose February warnings stopped at a supervisor, and a plant scorecard that counted tons received but not yard volume; it explains the failure through the bad apples, bad cases and bad barrels meta-analysis of Kish-Gephart, Harrison and Treviño, the trickle-down model of ethical leadership tested by Mayer and colleagues and Detert and Burris's study of manager openness and voice, and asks classmates whether firing the plant manager would fix anything. Full sample paper, read it free.

Read the sample →
Module 9

OL 690 Module 9 Final Project example

The OL 690 final project is a consulting report to the board of Corvane Materials, the invented battery recycler: an introduction to the company's mission and its record, an analysis that links two-customer dependence, a plant opened before its ventilation and storage were ready, an injury rate twice target, a yard fire, an unproved zero-waste claim and a scrap broker's unsafe yard into one chain of cause, then seven recommendations with owners, costs, measures and a two-year schedule; it draws on Carroll, Donaldson and Preston, Delmas and Burbano, Flammer, Locke and colleagues, Kish-Gephart and colleagues and Eccles and colleagues. Full sample paper, read it free.

Read the sample →
Module 10

OL 690 Module 10 Discussion example

The last OL 690 discussion asks how Corvane Materials, the invented battery recycler, should prove its progress after the consulting report, given that one ESG rater ranks it among the top tenth of industrial firms for its recycling mission and another puts it near the bottom for safety and governance; it uses Berg, Kölbel and Rigobon's decomposition of rating divergence across six agencies, the finding by Chatterji and colleagues that ratings from six raters barely agree and the Christensen, Hail and Leuz review of mandatory sustainability reporting, proposes a short set of audited measures and asks classmates which three numbers they would publish. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a OL 690 sample the right way

Corvane's OL 690 milestones work like a consultant's engagement: first an introduction and an outline of issues for people, the planet and profit, then the full analysis with a first outline of recommendations and how to implement them, so the Module 9 consulting report can deliver a plan the board could adopt. Share the OL 690 guidelines and the company you chose; your first custom sample is free and generally ready in two days.

OL 690 questions, answered

What does OL 690 cover?

Responsible corporate leadership: the social and environmental duties of business, stakeholder theory, the triple bottom line, green claims, the business case for responsibility, supply chain labor standards, ethical culture and reporting.

What is the OL 690 final project?

A consulting report on a chosen company that analyzes its record for people, the planet and profit and recommends how to improve it, built from milestones that introduce the company and outline, then draft, the analysis.

Is Corvane Materials a real company?

No. Corvane Materials, its plants, its fire and its finances were invented for these OL 690 samples, so no real recycler's record is described.