| Course | OL 690 Responsible Corporate Leadership |
|---|---|
| Module | Module 6 |
| Paper type | graduate milestone drafting a company's analysis of issues across people, the planet and profit, followed by an outline of recommendations and implementation |
| Length | About 1,170 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 690 Module 6
People, Planet and Profit at Corvane Materials: The Analysis and a First Plan
[Student Name]
Southern New Hampshire University
OL 690: Responsible Corporate Leadership
Milestone Two: Analysis of Issues and Recommendations Outline
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
People, Planet and Profit at Corvane Materials: The Analysis and a First Plan
Introduction
Milestone One introduced Corvane Materials, a recycler of lithium-ion batteries with plants in Sparks, Nevada, and Gaffney, South Carolina, and outlined its issues under people, the planet and profit. This milestone develops that outline into a full analysis. In response to feedback, it gives more weight to how the three areas affect one another and adds the evidence behind each issue. The analysis argues that Corvane's problems share a root: a company built around an environmental mission treated safety, honesty and its workforce as costs that could be adjusted when growth or prices required. A first outline of recommendations and implementation follows.
People: Safety
Corvane recorded an injury rate of 6.2 per 100 full-time workers in 2023, twice its own target of 3.0. Burns from electrolyte and from thermal events during shredding made up a third of cases, cuts from opening battery modules another third and heat illness most of the rest, concentrated at Gaffney in the summer of 2023, when the shredding hall reached 98 degrees on several afternoons. A federal inspection after two heat cases found gaps in the plant's respirator program and proposed a penalty of $38,000. The causes are organizational rather than individual. Gaffney was brought into production in eleven months to meet a customer's schedule, before its ventilation was finished, and it had one safety specialist for 410 workers. Workers told the county hearing after the fire that they had raised concerns about the outdoor stacks in February. In Carroll's terms, safety sits at the legal and ethical layers of responsibility, and Corvane has fallen short at both (Carroll, 1991).
People: Turnover, Layoffs and Voice
Turnover at Gaffney reached 41 percent in 2024, compared with 19 percent at Sparks. The difference tracks the apprenticeship program, which Sparks has and Gaffney does not, and the heat, which Gaffney workers mention in exit interviews more than pay. The October 2024 layoff of 180 people was legal, with two months of pay in lieu of notice, yet workers at both plants learned of it from a local television report the evening before managers told them. In the terms of Mitchell et al. (1997), line workers press a legitimate and frequently urgent claim with almost no power behind it, and the way the layoff was announced reflected exactly that. The layoff damaged trust among the employees who stayed more than the job cuts alone would have, which matters for a company that needs experienced operators to run a hazardous process.
The Planet: What Corvane Does Well
Corvane's environmental contribution is real. By the company's own measurement, nineteen of every twenty pounds of nickel and cobalt entering the Sparks refinery come out as saleable salts, along with about four-fifths of the lithium, which displaces metal that would otherwise be mined and refined abroad. Roughly seven gallons in ten of the refinery's process water are treated and run through again, which matters in the dry Truckee Meadows. It publishes its recovery rates, which few competitors do. Any recommendation should protect these strengths rather than treating the company as a polluter.
The Planet: Storage, Fire and Claims
Two failures undermine that record. The first is storage. In early 2024 a surge of factory scrap filled the Gaffney warehouse, and damaged batteries were stacked in an outdoor yard at almost twice the volume its state permit allowed. On March 9 they ignited. About 900 residents sheltered indoors for nine hours, runoff from firefighting water reached a drainage ditch and the state issued a notice of violation and suspended receiving for three weeks. The second failure is the "zero-waste" slogan, which ignores about 18,000 tons of sodium sulfate byproduct landfilled each year. Delmas and Burbano (2011) trace greenwashing to market pressure, weak regulation and loose internal coordination. Corvane fits all three: customers reward green suppliers, few rules govern recycling claims and the marketing team wrote the slogan before the refinery ran. The storage failure and the slogan have the same root as the safety problems: growth outpaced the systems meant to check it.
Profit: Dependence and the Price Slump
Two battery makers buy 71 percent of Corvane's output under contracts that tie prices to metal markets. When nickel and lithium prices fell in 2024, revenue dropped from $412 million to $268 million, and the company lost $71 million. Because nearly all its revenue moved with metal prices and two buyers, management had little room, and the first cuts proposed were to the storage building and safety staff. That choice illustrates how a weak business structure produces irresponsible decisions. Eccles et al. (2014) compared 90 early adopters of sustainability policy with 90 matched firms; the adopters were far likelier to pay executives partly on sustainability results and to consult stakeholders through formal processes, and by 2009 their share prices and their accounting profits had both pulled ahead. Corvane has neither practice, so nothing in its governance resisted the cuts.
How the Issues Connect
The analysis shows one chain rather than three lists. Customer concentration and price exposure created pressure to grow fast and cut quickly. Fast growth brought Gaffney online before its ventilation and storage were ready, which drove injuries, turnover and the fire. The fire and the slogan now threaten the customer relationships the business depends on, since both battery makers market their supply chains as clean. Breaking the chain requires changes in all three areas at once.
Recommendations Outline
People: build the fire-rated storage building at Gaffney now, at about $14 million, owned by the chief operating officer, with receiving capped at indoor capacity until it is finished.
People: restore the safety team to five and add a sixth specialist at Gaffney, about $650,000 a year, owned by a new vice president of environment, health and safety reporting to the chief executive.
People: extend the Sparks apprenticeship to Gaffney and finish its cooling, about $2.3 million, owned by human resources and operations.
People: adopt a layoff and change communication policy requiring employees to hear first from their managers, owned by human resources.
The planet: replace the zero-waste slogan with verifiable claims and fund a byproduct study with the detergent buyer, about $400,000, owned by marketing and the refinery manager.
Profit: diversify customers toward recyclers of energy storage systems and set a target of no customer above 35 percent of revenue within three years, owned by the chief commercial officer.
Implementation Outline
First quarter: cap receiving, approve the storage building, restore safety staffing and correct the slogan. Second and third quarters: build the storage, extend apprenticeships and cooling and adopt the communication policy. Year two onward: diversify customers and add safety and environmental measures to executive bonuses, with quarterly reporting to the board.
Conclusion
Corvane's environmental mission is genuine, but its record on people and its management of risk have not kept pace with its growth. The final consulting report will turn this analysis and outline into a complete plan with costs, measures and a case the board can approve.
References
Carroll, A. B. (1991). The pyramid of corporate social responsibility: Toward the moral management of organizational stakeholders. Business Horizons, 34(4), 39-48. https://doi.org/10.1016/0007-6813(91)90005-G
Delmas, M. A., & Burbano, V. C. (2011). The drivers of greenwashing. California Management Review, 54(1), 64-87. https://doi.org/10.1525/cmr.2011.54.1.64
Eccles, R. G., Ioannou, I., & Serafeim, G. (2014). The impact of corporate sustainability on organizational processes and performance. Management Science, 60(11), 2835-2857. https://doi.org/10.1287/mnsc.2014.1984
Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Academy of Management Review, 22(4), 853-886. https://doi.org/10.5465/amr.1997.9711022105
What the OL 690 Module 6 instructions ask for
OL 690 Milestone Two asks students to develop the outline from Milestone One into a draft of the analysis of issues section of the consulting report, several pages long, covering the company's corporate responsibility across people, the planet and profit. It also asks for a short outline of recommendations and implementation. Expect to analyze personnel relations and stakeholders, environmental impacts and conduct and sound business practice in depth, with evidence and research, and then to outline what the company should change, often including how it could improve relationships with employees and customers, reduce environmental harm and keep the business sound. Instructor feedback on Milestone One should be visible in the revision.
How this OL 690 Module 6 milestone two example is built
The milestone analyzes Corvane Materials, a fictional battery recycler. Under people, it traces an injury rate twice the company's target, 41 percent turnover at Gaffney and a layoff that workers learned about from the local news. Under the planet, it credits 95 percent recovery of nickel and cobalt and 70 percent water reuse, then examines the overfilled yard that burned in March 2024 and a zero-waste slogan contradicted by 18,000 tons of landfilled byproduct. Under profit, it shows how two customers buying 71 percent of output turned a price slump into safety cuts. Carroll, Mitchell and coauthors, Delmas and Burbano and the Eccles team ground the analysis, and an outline of six recommendations follows.
Where the OL 690 Module 6 rubric puts the points
Milestone Two of OL 690 is generally scored on a thorough, evidence-based analysis of people, planet and profit, accurate application of course concepts and research, clear links between issues and their causes, revisions that respond to feedback and a recommendations and implementation outline that follows from the analysis. The highest scores go to drafts that show how issues in one area cause problems in another and that outline recommendations with owners, costs and timing. Credit is lost when the draft simply lengthens the bullet points, when evidence is thin or one-sided, when recommendations appear that the analysis never set up or when the outline lacks any sense of how change would happen. APA citations and organization complete the rubric.
OL 690 Module 6 help: the mistakes that cost points
Treat each Milestone One bullet as a claim that now needs evidence and explanation: what happened, why, who was affected and what it cost. Look for connections across the three lenses, since the most persuasive analyses show, for example, that a financial squeeze caused a safety lapse. Bring in research where it explains a pattern, not as decoration. Address your instructor's comments directly, even if only by tightening a section. For the recommendations outline, write each item as an action with an owner, a rough cost and a first step, and order them by urgency. A common mistake is a recommendations list that could fit any company; another is skipping implementation, which the final report will need. Keep the analysis honest about what the company does well.
Get OL 690 Module 6 written to your instructions
Upload the OL 690 Milestone Two guidelines with your Milestone One and its feedback. A writer expands each outline point into analysis of people, the planet and profit backed by research and evidence, then drafts the recommendations and implementation outline your final consulting report will build on. Your first OL 690 Milestone Two is free and lands in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 690 papers and related MS Organizational Leadership samples
- OL 690 Module 1 Discussion: What a Recycler Owes Beyond Profit
- OL 690 Module 2 Discussion: Who Counts After the Fire?
- OL 690 Module 3 Milestone One: Introduction and Issues Outline
- OL 690 Module 4 Discussion: Zero Waste or a Green Claim Too Far?
- OL 690 Module 5 Discussion: Does Responsibility Pay When Prices Fall?
- OL 690 Module 7 Discussion: Watching the Scrap Suppliers
- OL 690 Module 8 Discussion: Why the Yard Was Overfilled
- OL 690 Module 9 Final Project: The Consulting Report
- OL 690 Module 10 Discussion: Measuring Responsibility When Ratings Disagree
- MBA 580 Module 4 Innovation Strategy Benchmark Study: Benchmarking connected-car strategies
- BMB 630 Module 3 Milestone One: The Venue's Marketing Situation
- ACC 645 Module 7 Discussion: Assurance on Emissions Data
- ACC 610 Module 9 Milestone Three: The Statement of Cash Flows and Key Disclosures
OL 690 Module 6 questions, answered
Where can I find a free OL 690 Module 6 Milestone Two sample?
The full OL 690 Milestone Two is on this page: an invented battery recycler's issues analyzed across people, planet and profit, followed by an outline of six recommendations.
How long is the OL 690 Milestone Two?
It is usually a multi-page draft of the analysis of issues, often around eight pages, plus a short outline of recommendations and implementation; check your section's guidelines.
What should the OL 690 recommendations outline include?
Specific actions for people, the planet and profit, each with who would lead it, an estimate of cost, a timeline and how success would be measured.
How do I connect people, planet and profit in the analysis?
Show causes that cross the lenses, such as financial pressure leading to safety cuts or an environmental lapse damaging customer relationships, rather than three separate lists.
Should DEI appear in the OL 690 recommendations?
Many versions ask how the company could improve relationships with employees and customers, and diversity, equity and inclusion initiatives are one option where the analysis shows a related issue.