| Course | OL 690 Responsible Corporate Leadership |
|---|---|
| Module | Module 4 |
| Paper type | graduate discussion post on environmental claims and greenwashing, testing one company's marketing slogan against what it actually sends to landfill |
| Length | About 410 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 690 Module 4
Module Four Discussion
What Zero Waste Leaves Out
Every Corvane Materials truck carries the same line: "zero-waste battery recycling." The company does keep batteries out of landfills, and its refinery returns nearly all of the nickel and cobalt they contain to the market. But refining black mass into metal salts uses sulfuric acid and caustic soda, and the chemistry leaves sodium sulfate behind. The Sparks refinery produces about 18,000 tons of it a year, sells a small amount to a detergent maker and sends the rest to a regional landfill under a contract that the company's own permit filings disclose. Nothing about the slogan mentions it.
Delmas and Burbano (2011) treat greenwashing as what happens when a firm with a weak environmental record talks about that record as though it were strong, and they trace the habit to three levels. Externally, customers and investors reward green claims while regulation is limited and uncertain. Organizationally, marketing and operations often do not talk, so a slogan outruns the facts. Individually, managers are prone to optimism. All three fit Corvane: its battery-maker customers advertise clean supply chains, its marketing team wrote the slogan in 2019 before the refinery opened, and its founders sincerely see the company as a climate solution. Lyon and Maxwell (2011) model a firm deciding what to disclose when an activist might audit it and punish it for hiding negatives. Their model predicts that the threat of an audit deters spin but can also lead firms to disclose less. Corvane's sustainability page, which lists recovery rates and water recycling but no waste figures, looks like the second response.
I think it is, by overstatement rather than invention. Corvane is a genuinely green business, and that makes the slogan more dangerous, because customers trust it. Bansal and Roth (2000) found that firms adopt environmental practices partly to gain legitimacy. An exposed overstatement destroys exactly that legitimacy.
"Our refinery sends 95 percent of the nickel and cobalt from incoming batteries back to market, and we are working to find a use for the 18,000 tons of sodium sulfate our refinery produces each year." It is longer, but every word can be checked, and the second half commits the company to a problem it can report progress on. A customer reading that line learns something true, which the slogan never offered.
If a company's core business really helps the environment, should a regulator or customer treat an exaggerated slogan as harshly as a polluter's false claim?
References
Bansal, P., & Roth, K. (2000). Why companies go green: A model of ecological responsiveness. Academy of Management Journal, 43(4), 717-736. https://doi.org/10.2307/1556363
Delmas, M. A., & Burbano, V. C. (2011). The drivers of greenwashing. California Management Review, 54(1), 64-87. https://doi.org/10.1525/cmr.2011.54.1.64
Lyon, T. P., & Maxwell, J. W. (2011). Greenwash: Corporate environmental disclosure under threat of audit. Journal of Economics & Management Strategy, 20(1), 3-41. https://doi.org/10.1111/j.1530-9134.2010.00282.x
What the OL 690 Module 4 instructions ask for
The Module 4 discussion in OL 690 usually focuses on the environmental side of corporate responsibility: how a company affects the natural world, what it claims about that effect and whether its leaders act responsibly. Many prompts ask students to examine an environmental claim, a sustainability initiative or an environmental failure at their chosen company. Strong posts compare what a company says with what can be verified, define greenwashing carefully, use research on why firms disclose selectively and suggest what honest communication would look like. They also give fair credit for real environmental benefits. Replies often ask whether a classmate has separated an exaggerated claim from a false one, or whether a disclosure gap is deliberate.
How this OL 690 Module 4 discussion example is built
Corvane Materials, an invented recycler, recovers most of the nickel and cobalt in used batteries, a real environmental good. It also prints "zero-waste battery recycling" on its trucks while landfilling about 18,000 tons a year of sodium sulfate left by refining. The post uses the external, organizational and individual drivers of greenwashing described by Delmas and Burbano, the Lyon and Maxwell model in which the threat of an activist audit both deters spin and pushes some firms to say less, and the legitimacy motive found by Bansal and Roth. It concludes that the slogan is greenwashing by overstatement, proposes a measurable claim instead and asks classmates whether a genuinely green firm can still greenwash.
Where the OL 690 Module 4 rubric puts the points
Graders of the OL 690 environmental thread tend to reward a precise account of greenwashing or of the environmental issue in question, a specific claim or practice tested against evidence, use of research on corporate environmental behavior, a fair judgment that credits real benefits and replies that strengthen a classmate's analysis. The strongest posts quote the claim, show the evidence that contradicts or supports it and propose a better alternative. Posts lose credit when they call everything greenwashing, repeat a sustainability report uncritically, rely on activist or company sources alone or skip the replies. Readable writing and correct APA citations are counted as well.
OL 690 Module 4 help: the mistakes that cost points
Find one specific environmental claim your company makes, word for word, and look for independent evidence about it: permits, emissions data, product testing, regulator findings or credible reporting. Decide whether the claim is accurate, exaggerated, vague or false, and explain which. Use research on why companies overstate, such as pressure from customers and investors combined with weak regulation and loose internal checks. A common mistake is assuming that any company in a green industry is honest about its impact; another is condemning a company for a claim that is merely imprecise. Suggest wording the company could prove, with a number and a scope. Then ask classmates whether the original claim would mislead a typical customer.
Get OL 690 Module 4 written to your instructions
Share the OL 690 Module 4 prompt and the company you are studying. A writer tests one of its environmental claims against evidence, explains with research why companies overstate their records, judges whether the claim crosses into greenwashing and drafts a version the company could defend, ending with a question for OL 690 peers. The first green-claims post is free in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 690 papers and related MS Organizational Leadership samples
- OL 690 Module 1 Discussion: What a Recycler Owes Beyond Profit
- OL 690 Module 2 Discussion: Who Counts After the Fire?
- OL 690 Module 3 Milestone One: Introduction and Issues Outline
- OL 690 Module 5 Discussion: Does Responsibility Pay When Prices Fall?
- OL 690 Module 6 Milestone Two: Analysis of Issues and Recommendations Outline
- OL 690 Module 7 Discussion: Watching the Scrap Suppliers
- OL 690 Module 8 Discussion: Why the Yard Was Overfilled
- OL 690 Module 9 Final Project: The Consulting Report
- OL 690 Module 10 Discussion: Measuring Responsibility When Ratings Disagree
- MKT 678 Module 8 Brand Equity Measurement Assignment: Measuring Brand Equity
- OL 751 Module 9 Final Project: The HR Strategy Proposal
- MBA 580 Module 1 Innovation and Performance Discussion: An automaker improving the wrong thing
- QSO 560 Module 1 Discussion: The Measures That Matter
OL 690 Module 4 questions, answered
Where can I find a free OL 690 Module 4 Discussion sample?
The whole OL 690 Module 4 post is on this page: an invented battery recycler's zero-waste slogan tested against the byproduct it sends to landfill.
What is greenwashing?
Misleading customers, investors or the public about a company's environmental performance or the environmental benefits of a product, often by stressing positives while leaving out negatives.
Why do companies greenwash?
Research points to market and investor pressure for green credentials, weak or uncertain regulation, organizational habits such as loose communication between departments and individual biases such as optimism.
Can a green company greenwash?
Yes. A firm with a real environmental benefit can still overstate it, as when a recycler claims zero waste while producing a byproduct that goes to landfill.
How should a company make an environmental claim?
Make it specific, measurable and scoped, for example the share of a material recovered or the tons diverted from landfill, and back it with data that someone outside the company can check.