| Course | OL 690 Responsible Corporate Leadership |
|---|---|
| Module | Module 10 |
| Paper type | graduate discussion post on how corporate responsibility is measured, reported and rated, and how a leader should report when outside ratings disagree |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 690 Module 10
Module Ten Discussion
Top Tenth and Bottom Fifth at Once
After its board adopted the consulting report's recommendations, Corvane Materials had to decide how to show progress. Its two outside ratings point in opposite directions. One ESG rating agency places Corvane in the top tenth of industrial companies, crediting the metal it recovers and the mining it displaces. Another places it in the bottom fifth, weighing its injury rate, the Gaffney fire, its state violation and a board with no committee on safety or environment. Investors and customers read both.
Berg et al. (2022) compared ratings from six well-known agencies and broke their disagreement into three parts. Measurement, rating the same issue in different ways, explained 56 percent of the divergence; scope, rating different issues, explained 38 percent; and weighting explained only 6 percent. They also found a rater effect, in which an agency's overall view of a firm colors how it scores particular categories. Chatterji et al. (2016) had already shown that ratings from six established raters agreed surprisingly little, even after adjusting for different definitions of responsibility, which led them to question whether the ratings were valid. For Corvane the explanation is plain: one rater measures products and the other measures operations, and both are partly right.
Chasing either rating would distort the plan. Christensen et al. (2021), reviewing research on mandatory sustainability reporting, note that reporting standards can improve comparability and discipline firms' behavior, while raising questions about cost, materiality and enforcement. That points toward a short list of material measures with outside assurance rather than a long report. I would publish five each quarter: the recordable injury rate at each plant; the volume of damaged batteries stored outdoors, which should be zero; tons of byproduct landfilled and tons put to use; the share of collection partners visited and corrected; and the largest customer's share of revenue. Each ties to a recommendation in the consulting report, and each can be checked by an auditor.
These measures should go to the new board committee every quarter and should drive a quarter of executive bonuses. A rating agency's opinion can then follow the evidence rather than lead it.
If your company could publish only three audited measures of its responsibility, which three would you choose, and which stakeholder would trust each one?
References
Berg, F., Kölbel, J. F., & Rigobon, R. (2022). Aggregate confusion: The divergence of ESG ratings. Review of Finance, 26(6), 1315-1344. https://doi.org/10.1093/rof/rfac033
Chatterji, A. K., Durand, R., Levine, D. I., & Touboul, S. (2016). Do ratings of firms converge? Implications for managers, investors and strategy researchers. Strategic Management Journal, 37(8), 1597-1614. https://doi.org/10.1002/smj.2407
Christensen, H. B., Hail, L., & Leuz, C. (2021). Mandatory CSR and sustainability reporting: Economic analysis and literature review. Review of Accounting Studies, 26(3), 1176-1248. https://doi.org/10.1007/s11142-021-09609-5
What the OL 690 Module 10 instructions ask for
The final OL 690 discussion often asks students to reflect on accountability: how companies measure, report and are judged on responsibility, and how leaders should use those measures. Prompts may ask about sustainability reports, ESG ratings, reporting standards or the measures a leader would track to show progress on the student's consulting recommendations. Strong posts understand that ratings disagree for identifiable reasons, such as what they include and how they measure it, and they argue for measures tied to the company's material issues rather than to a rater's preferences. Replies often ask a classmate how a proposed measure could be manipulated or which stakeholder would trust it. Keep the post focused on one company so the measures stay concrete.
How this OL 690 Module 10 discussion example is built
Corvane Materials, a made-up recycler, receives opposite verdicts from two ESG raters: one places it in the top tenth of industrial firms for its recycling mission, the other near the bottom fifth for injuries, the yard fire and a board with no safety oversight. The post explains the gap with the analysis of six rating agencies by Berg, Kölbel and Rigobon, which attributes most divergence to measurement and scope, and the finding by Chatterji and colleagues that six established raters barely agree. The review of mandatory reporting by Christensen, Hail and Leuz supports reporting a few material measures with outside assurance. It proposes five measures for Corvane and asks classmates which three they would publish.
Where the OL 690 Module 10 rubric puts the points
The closing OL 690 discussion is usually graded on understanding how responsibility is measured and reported, accurate use of research on ratings and disclosure, a sensible proposal for measures tied to the company's material issues, reflection on accountability and replies that test a classmate's proposal. Top posts explain why measures diverge and what that means for a leader, and they propose specific, auditable numbers. Posts lose points when they treat a single rating as truth, list dozens of metrics without priorities, ignore how measures could be gamed or offer brief replies. APA citations and clear writing complete the grade in this final module. Instructors also notice when a post connects its measures to the consulting report the student has just finished, since that link shows the course's ideas carried through to a decision.
OL 690 Module 10 help: the mistakes that cost points
Look up how your company is rated or how it reports, if public, and note where sources disagree. Then ask what matters most for its stakeholders, the issues where it does the most good or harm, and choose a handful of measures for those issues. Prefer measures that are specific, comparable over time and checkable by an outside auditor. Use research on ratings and reporting to explain why a leader should not chase a rating directly. A common mistake is proposing vague measures such as commitment to sustainability; another is choosing only measures the company already does well on. Link the measures to the recommendations from your consulting report. Ask classmates which measure they would trust least.
Get OL 690 Module 10 written to your instructions
Share the OL 690 Module 10 prompt and your company's ratings or reports. A writer explains how its responsibility is measured and why ratings differ, proposes a short set of measures the company should publish with outside assurance and asks OL 690 classmates which numbers they would put in front of a board. Your first OL 690 reporting post is free in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 690 papers and related MS Organizational Leadership samples
- OL 690 Module 1 Discussion: What a Recycler Owes Beyond Profit
- OL 690 Module 2 Discussion: Who Counts After the Fire?
- OL 690 Module 3 Milestone One: Introduction and Issues Outline
- OL 690 Module 4 Discussion: Zero Waste or a Green Claim Too Far?
- OL 690 Module 5 Discussion: Does Responsibility Pay When Prices Fall?
- OL 690 Module 6 Milestone Two: Analysis of Issues and Recommendations Outline
- OL 690 Module 7 Discussion: Watching the Scrap Suppliers
- OL 690 Module 8 Discussion: Why the Yard Was Overfilled
- OL 690 Module 9 Final Project: The Consulting Report
- SPT 501 Module 7 Discussion: Who Answers a Post-Race Survey
- MBA 580 Module 4 Innovation Strategy Benchmark Study: Benchmarking connected-car strategies
- QSO 560 Module 7 Discussion: Telling the Owners What Happened
- SPT 608 Module 4 Discussion: Fireworks, Bobbleheads and the Gate
OL 690 Module 10 questions, answered
Where can I find a free OL 690 Module 10 Discussion sample?
The full OL 690 Module 10 post is on this page: two ESG ratings that disagree about an invented battery recycler and the measures it should report instead.
Why do ESG ratings disagree?
Raters include different issues (scope), measure the same issue differently (measurement) and weight issues differently; research on six major raters found measurement and scope explain most of the gap.
What should a company report on responsibility?
A focused set of measures for its most material issues, such as safety rates, emissions or waste for its industry, reported consistently over time and checked by an outside assurer.
Is sustainability reporting mandatory in the United States?
Rules are still developing and vary by jurisdiction and company type; researchers expect mandatory reporting to improve comparability but note costs and enforcement questions.
How can a leader be held accountable for responsibility goals?
Publish specific targets, report progress with outside assurance, give the board oversight and link part of executive pay to the measures.