SPT 501 Module 7 Discussion Example

Reviewed by Portia Lambrick, MBA

This SPT 501 Module 7 Discussion sample examines sampling and nonresponse bias, explaining who is likely to answer a survey, how that could distort findings and how known records can test and adjust for it. SNHU SPT 501 (SPT-501) asks MS Sport Management students to consider who their data actually represent. The writer runs a pilot survey of first-time triathletes for Lakeline Endurance Events, an invented Iowa race company, and finds that the athletes who answered are not the athletes the study most needs to hear from. The post works through what that means and what can be done about it.

CourseSPT 501 Research Methods in Sport Management
ModuleModule 7
Paper typegraduate discussion post on sampling and nonresponse bias, explaining who is likely to answer a survey, how that could distort findings and how known records can test and adjust for it
LengthAbout 410 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 501 Module 7

1

Module Seven Discussion

The Athletes Who Did Not Answer

Before launching the full survey for our Lakeline Endurance Events study, I invited 400 first-time finishers from last season's Bluestem races. Ninety-two answered, a response rate of 23 percent. I was ready to apologize for the rate until I compared the respondents with our registration records, which we hold for all 400. Among everyone invited, 29 percent had started another triathlon with us. Among respondents, 41 percent had. Slow finishers, those in the bottom quarter of their race, were 25 percent of invitees but 14 percent of respondents, and athletes living more than 90 minutes from their race were 31 percent of invitees but 20 percent of respondents.

What this page is doingWhat the pilot showed.
2

Groves (2006) argued that a response rate on its own says little about bias; the danger comes when whatever moves people to reply is connected to the answers the survey is after. Groves and Peytcheva (2008) reached a similar conclusion across many studies: surveys with low response rates were not always more biased, and bias varied more within surveys, by question, than between them. Our problem is exactly the dangerous kind. Athletes who came back to our races were more likely to answer our survey, and coming back is the outcome we are studying. If I ran the analysis on these respondents, the people who never returned, the ones the study is about, would have the smallest voice.

What this page is doingWhy the rate is not the main problem.
3

The advantage we have is records on everyone invited. In the full survey, I will repeat the comparison of respondents and non-respondents on return, finish position, distance, age and gender. I will add a second contact by text message, a week after the email, worded for people who have not raced since: "Whether or not you've raced again, we want to hear from you." The small gift card for anyone who opens the survey stays; the review by Singer and Ye (2013) suggests prepaid rewards can draw in people with weaker ties to a sponsor, which describes our non-returners. Then I will weight the respondents so that returners, slow finishers and distant athletes count in proportion to their share of all invitees.

Weighting cannot fix everything. It corrects for differences on what we know, but if non-returners who answered differ from non-returners who did not, perhaps because the ones who answered still feel some connection to the sport, weighting will not reveal it.

What this page is doingWhat I will do.
4

Would you report the weighted or unweighted results first, and why?

What this page is doingFor classmates.
5

References

Groves, R. M. (2006). Nonresponse rates and nonresponse bias in household surveys. Public Opinion Quarterly, 70(5), 646-675. https://doi.org/10.1093/poq/nfl033

Groves, R. M., & Peytcheva, E. (2008). The impact of nonresponse rates on nonresponse bias: A meta-analysis. Public Opinion Quarterly, 72(2), 167-189. https://doi.org/10.1093/poq/nfn011

Singer, E., & Ye, C. (2013). The use and effects of incentives in surveys. The Annals of the American Academy of Political and Social Science, 645(1), 112-141. https://doi.org/10.1177/0002716212458082

What the SPT 501 Module 7 instructions ask for

The SPT 501 Module 7 discussion often asks students to describe the sampling strategy for their proposed study and consider threats to the representativeness of their sample, such as low response or self-selection. Expect to define the population, the sampling frame and how participants will be recruited. Strong posts distinguish between the response rate and the bias it may or may not cause, identify which kinds of people are likely to be missing and why, propose ways to check for bias using information available about non-respondents and suggest specific remedies such as follow-up contacts, targeted messages and weighting, while recognizing their limits. Replies should identify likely nonresponse patterns in classmates' samples.

How this SPT 501 Module 7 discussion example is built

The post examines a pilot invitation for the Lakeline Endurance Events study, a fictional Ames, Iowa company's survey of first-time triathletes. Of 400 first-timers invited, 92 answered, or 23 percent, but 41 percent of respondents had raced again against 29 percent of all invitees, and slow finishers and distant athletes were underrepresented. The writer explains why response related to the outcome matters more than a low rate, compares respondents with company records on every invitee, proposes a text-message follow-up aimed at people who have not raced since and weighting by return status and finish position, and admits what weighting cannot fix. Groves and Groves and Peytcheva are cited.

Where the SPT 501 Module 7 rubric puts the points

Instructors grading the SPT 501 sampling thread typically look for a defined population and frame, a clear grasp of the difference between response rate and nonresponse bias, specific predictions about who is missing, a method for checking bias against known information, realistic remedies and honest limits. Posts that use real comparisons between respondents and the population earn more credit. They lose points for treating a low response rate as automatically fatal or a high one as automatically safe, for ignoring who is missing or for proposing weighting as a cure-all. Two APA sources and replies that diagnose a classmate's likely nonresponse finish the grade, especially replies that name a record the classmate could use for the comparison.

SPT 501 Module 7 help: the mistakes that cost points

Name your population and how you will reach it, then ask who among them is least likely to answer and why. Ask whether those people differ on the outcome you care about; if so, low response could bias your results even at a decent rate. Look for information you already hold about everyone you invite, such as records or registration data, and plan to compare respondents with non-respondents on it. Then consider follow-up contacts, different messages for hard-to-reach groups and weighting. Posts often celebrate or apologize for a response rate; the useful analysis asks whether the people who answered differ from those who did not, and on which measures.

Get SPT 501 Module 7 written to your instructions

Paste the SPT 501 Module 7 prompt and describe your population and sampling plan. A writer explains who is likely to respond and why, how that could bias your findings, how to check for bias with information you already have and what follow-up and weighting can and cannot fix, with sources and a question for classmates. We draft your first SPT 501 post free, normally within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 501 papers and related MS Sport Management samples

SPT 501 Module 7 questions, answered

Where can I find a free SPT 501 Module 7 Discussion sample?

The SPT 501 Module 7 post on nonresponse in an invented triathlon company's pilot survey is on this page in full.

What is nonresponse bias?

Error in a survey's results that arises because the people who stayed silent differ, on the things being measured, from the people who answered.

Is a low response rate always a problem?

Not always; a low rate causes bias mainly when the decision to respond is related to the study's key variables.

How can researchers check for nonresponse bias?

By comparing respondents and non-respondents on information known about both, such as records, demographics or behavior.

What does weighting do?

Weighting gives underrepresented groups more influence in the analysis, though it can only correct for characteristics that are known.