SPT 501 Module 5 Research Design Assignment Example

Reviewed by Portia Lambrick, MBA

This SPT 501 Module 5 Research Design Assignment sample chooses and justifies a research design, matches methods to research questions, sets out the sequence of quantitative and qualitative strands and weighs the threats to validity the design must manage. SNHU SPT 501 (SPT-501) asks MS Sport Management students to defend why their design fits their questions. The study concerns first-time finishers in a triathlon series run by Lakeline Endurance Events, an invented Iowa company. A survey linked to records of who actually returned comes first, and interviews chosen from its results follow to explain what the numbers show about beginners.

CourseSPT 501 Research Methods in Sport Management
ModuleModule 5
Paper typegraduate assignment choosing and justifying a research design, matching methods to research questions, setting out the sequence of quantitative and qualitative strands, sampling and the threats to validity the design must manage
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 501 Module 5

1

Numbers First, Then Voices: Designing the Bluestem First-Timer Study

[Student Name]

Southern New Hampshire University

SPT 501: Research Methods in Sport Management

Research Design Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingLakeline Endurance Events, its athletes and all figures in this SPT 501 design are invented.
2

Numbers First, Then Voices: Designing the Bluestem First-Timer Study

Introduction

The Bluestem first-timer study asks two questions: what predicts a beginner's return to triathlon within a year of a first Bluestem finish, and how first-time finishers describe their decisions. This assignment chooses a design that can answer both, explains how its parts fit together and addresses the threats to validity that could make its findings misleading.

What this page is doingStates the design task.
3

Three Options Considered

Three simpler designs were considered first. A records-only analysis would use Lakeline's registration data on about 6,300 first-time finishers over three seasons. It could show whether age, gender, travel distance, race distance and finish position predict return, and it would cover every first-timer, not only those who answer a survey. But records contain nothing about constraints, social support or satisfaction, so the analysis could test only two of the four hypotheses and could not answer the second question at all.

A survey alone could measure constraints, group training and satisfaction and could be linked to records of actual return. It would test all four hypotheses. But a survey can show that time constraints predict not returning without showing how athletes experienced those constraints or what might have changed their decision.

An interview study alone would answer the second question richly but could not say how common any explanation is or which factors matter most across thousands of first-timers.

What this page is doingCompares alternatives.
4

The Chosen Design

Because no single option answers both questions, the Bluestem study runs them in order, numbers first and conversations second, with the second phase shaped by what the first one finds. Methodologists call this an explanatory sequential design. Johnson and Onwuegbuzie (2004) describe mixed methods research as combining quantitative and qualitative approaches in one study when the combination answers the research questions better than either alone, and they caution that the choice should follow from the questions rather than preference. Here the questions call for both.

How the design answers each research question

Research questionDataAnalysis
RQ1: Which factors predict return?Survey linked to registration recordsLogistic regression
RQ2: How do first-timers explain their decisions?Semi-structured interviewsThematic analysis
IntegrationInterview selection based on survey resultsJoint display comparing patterns and explanations

The quantitative strand comes first. All first-time finishers from the last three seasons with a valid email address will be invited to an online survey measuring constraints, group training, race satisfaction and racing elsewhere. Answers will be linked to registration records, which supply age, gender, travel distance, race distance, finish position and whether the athlete started another Bluestem race.

The qualitative strand comes second, and the survey results shape it. About twenty survey respondents who agreed to be contacted will be interviewed. They will be chosen purposively to include returners and non-returners and, within each group, athletes with high and low constraint scores and with and without group training. If the survey shows an unexpected pattern, such as slow finishers returning at high rates, interviewees will be chosen to explore it.

What this page is doingExplains the mixed-methods approach.
5

Why the Survey Comes First

Putting the survey first means the interviews can be aimed at the patterns that matter. If time constraints turn out to predict not returning strongly, interviews can explore how athletes experienced those constraints and whether anything helped them negotiate them. If a hypothesis fails, interviews can ask why. Running interviews first would be useful for building a survey in a new area, but constraint and satisfaction measures already exist, so the main need is explanation, not exploration.

What this page is doingJustifies the sequence.
6

Integration

The strands are integrated at two points. At selection, survey results determine who is interviewed. When the results are interpreted, every regression finding will be set next to the interview themes about the same factor, showing where interviews confirm, explain or contradict the numbers. Disagreements will be reported rather than smoothed over, since they may show that the survey measured something other than what was intended.

What this page is doingExplains how the strands combine.
7

Threats to Validity

Threats to validity and remedies

ThreatWhy it matters hereRemedy
RecallFirst races may be up to three years pastUse records for facts; ask about recent experience where possible
NonresponseNon-returners may be less willing to answer a race companyUniversity-hosted survey, unconditional incentive, compare respondents with records
Self-selection into interviewsVolunteers may be the most engagedPurposive selection across groups; note who declined
Common method biasConstraints and satisfaction measured on one surveyOutcome taken from records, not the survey
GeneralizationOne regional seriesDescribe the setting; avoid claims beyond similar events

Two threats deserve emphasis. Nonresponse could be serious because athletes who never returned may have the least interest in a survey from the race company, which would hide the very people the study is about. Groves (2006) showed that nonresponse rates alone are weak indicators of bias; what matters is whether response is related to the variables of interest. Because the study has registration records for everyone invited, it can compare respondents and non-respondents on age, gender, distance, finish position and return, directly checking for this bias.

Common method bias is the second. Podsakoff et al. (2003) showed that measuring predictors and outcomes with the same instrument at the same time can inflate the relationships between them. The design reduces this by taking the main outcome, return, from registration records rather than the survey. Relationships among survey-measured predictors, such as constraints and satisfaction, remain vulnerable and will be interpreted with that in mind.

What this page is doingIdentifies and manages risks.
8

Limitations

The design shows associations, not causes; a link between group training and return could reflect the type of person who joins groups. It covers one series in the upper Midwest. Athletes who raced in other events but not Bluestem races will be counted correctly only if they report it. And athletes who registered but never started or finished are outside the study, though they may be the ones the company most needs to understand.

What this page is doingStates what the design cannot do.
9

Conclusion

An explanatory sequential mixed-methods design fits the Bluestem study because its two questions need different evidence. A survey linked to records of actual return answers which factors predict coming back, and interviews chosen from its results explain why. The design manages its main threats, especially nonresponse and common method bias, through the records it already holds.

What this page is doingSummarizes the design.
10

References

Groves, R. M. (2006). Nonresponse rates and nonresponse bias in household surveys. Public Opinion Quarterly, 70(5), 646-675. https://doi.org/10.1093/poq/nfl033

Johnson, R. B., & Onwuegbuzie, A. J. (2004). Mixed methods research: A research paradigm whose time has come. Educational Researcher, 33(7), 14-26. https://doi.org/10.3102/0013189X033007014

Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003). Common method biases in behavioral research: A critical review of the literature and recommended remedies. Journal of Applied Psychology, 88(5), 879-903. https://doi.org/10.1037/0021-9010.88.5.879

What the SPT 501 Module 5 instructions ask for

The SPT 501 Module 5 assignment typically asks students to describe and justify the research design for their proposed study, including the approach, the methods of data collection and the rationale for choosing them. Expect to explain how the design answers each research question and to address validity. Strong papers consider alternative designs and explain why they were rejected, match each research question to a method, explain the sequence and integration if the design is mixed, describe the population and sampling, and name the risks to drawing correct conclusions and to generalizing beyond the sample, pairing each with a concrete safeguard. They acknowledge what the design cannot do. A design diagram or table connecting questions, data and analysis often helps readers follow the logic.

How this SPT 501 Module 5 research design assignment example is built

The assignment designs a study of first-time finishers in the Bluestem Triathlon Series, run by Lakeline Endurance Events, a fictional Ames, Iowa company. A records-only analysis, a survey and an interview study are compared; none answers both questions alone. An explanatory sequential mixed-methods design is chosen: an online survey of about 6,300 first-time finishers from three seasons, linked to registration records of actual return, then interviews with about twenty first-timers chosen from survey results. Interviewee selection covers returners and non-returners with different constraints, and integration is explained. Threats include recall, nonresponse, self-selection and common method bias. Johnson and Onwuegbuzie, Podsakoff and colleagues and Groves are cited.

Where the SPT 501 Module 5 rubric puts the points

Grading for the SPT 501 design assignment typically credits a design matched to the research questions, consideration of alternatives, a clear sequence and integration plan for mixed designs, defined population and sampling, specific threats to validity with remedies, honest limitations and use of methods literature. Papers score highest when a reader could trace each question to its data and analysis. They lose points for picking a combined design because it looks ambitious, for describing methods without justifying them, for ignoring validity threats or for designs that cannot answer the questions asked. A design table, APA references and precise methods language finish the grade, along with a frank statement of what the design leaves out.

SPT 501 Module 5 help: the mistakes that cost points

Write each research question at the top of a page and ask what evidence would answer it. If the answer is numbers about many people, you need a quantitative strand; if it is how people understand their experience, you need a qualitative one. If you need both, decide which comes first and why, and how one strand will inform the other. Then ask what could make your results wrong: memory, who chose to answer, the way you asked. For each, name a step that reduces it. Papers often describe a design in general terms; the strongest show exactly how each research question gets answered and where the design is weakest.

Get SPT 501 Module 5 written to your instructions

Share the SPT 501 Module 5 instructions and your research questions. A writer compares design options, chooses and justifies a quantitative, qualitative or mixed approach, sets out the sequence, sampling and integration, and addresses threats to validity with specific remedies, grounded in methods literature. We write your first SPT 501 assignment free, and it typically reaches you in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 501 papers and related MS Sport Management samples

SPT 501 Module 5 questions, answered

Where can I find a free SPT 501 Module 5 research design sample?

This page holds the complete SPT 501 Module 5 assignment designing a mixed-methods triathlon retention study.

When is an explanatory sequential design the right choice?

When the main need is to explain patterns found in numbers; the survey runs first and interviews are chosen to account for what it found.

Why consider alternative designs?

Explaining why other designs were rejected shows that the chosen design was selected for the questions rather than by habit.

What is common method bias?

Inflated relationships that appear because predictor and outcome were both collected through one instrument on one occasion.

How can a design reduce recall problems?

By using records for facts where possible and asking about recent events, so participants rely less on memory.