| Course | SPT 501 Research Methods in Sport Management |
|---|---|
| Module | Module 3 |
| Paper type | graduate literature review synthesizing research by theme for a proposed study, evaluating its quality and fit, identifying the gap the study fills and showing how the literature shapes the design |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 501 Module 3
Constraints, Careers and Coming Back: A Literature Review for the Bluestem First-Timer Study
[Student Name]
Southern New Hampshire University
SPT 501: Research Methods in Sport Management
Literature Review
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Constraints, Careers and Coming Back: A Literature Review for the Bluestem First-Timer Study
Introduction
The proposed study asks what separates the Bluestem beginners who line up for another triathlon within a year from those who do not, and how they explain their decisions. This review synthesizes research on four themes that bear on those questions: leisure constraints, serious leisure and event travel careers, social support and group participation, and satisfaction and return at sport events. For each theme, it considers what is known, how strong the evidence is and how well it fits first-time triathletes, then identifies the gap the study fills and draws implications for its design.
Leisure Constraints
The hierarchical model proposed by Crawford et al. (1991) places constraints in a sequence: intrapersonal constraints, such as anxiety, low perceived skill or feeling out of place, come first; interpersonal constraints, such as lacking companions, come next; and structural constraints, such as time, money and distance, come last. People who overcome or negotiate each level go on to participate. Later research in leisure studies refined the idea of negotiation, showing that people use strategies to participate despite constraints rather than being stopped by them. The model is widely used and offers established survey items, but most applications concern general leisure rather than demanding endurance events, where training time and fear of failure may be sharper constraints. For first-timers, intrapersonal constraints, such as feeling slow or not belonging, may matter more than for experienced athletes, which supports hypothesis H1.
The negotiation idea matters for the proposed study because it changes what to look for. If constraints simply stopped people, the study would only need to count them. But if people negotiate constraints, by training before work, recruiting a partner or choosing a closer race, then two first-timers with the same constraints may make opposite decisions depending on whether they found a way around them. A survey can measure how strongly first-timers feel each constraint; only interviews can reveal how, or whether, they tried to work around it. This is one reason the review points toward pairing the survey with conversations.
Lamont and Kennelly (2011) applied constraint ideas to triathletes and found that competing priorities, especially work and family commitments, shaped how triathletes planned and limited their event travel. Their participants were committed amateur triathletes, not beginners, but their findings support including time constraints as a predictor in hypothesis H3.
Serious Leisure and Event Travel Careers
Getz and McConnell (2011) describe event travel careers, in which committed participants progress through events of increasing challenge and distance as their involvement deepens, and they link this progression to serious leisure, where people invest effort and identity in an activity. The concept explains why experienced triathletes return: the next race is a step in a career. It also suggests that the first race is a turning point; a beginner either starts a career or treats the race as a one-time challenge. Their work relied mainly on surveys of active, committed participants, so it says more about why careers continue than about why they never begin, which is precisely the question for first-timers.
Social Support and Group Participation
Research on sport participation repeatedly links continued involvement with social connections: training partners, clubs and friends who participate. In the constraints framework, social ties help people negotiate interpersonal constraints, and in event careers, groups often carry newcomers into their next events. This literature supports hypothesis H4, that first-timers who trained with a group are more likely to return. However, most studies measure social ties among people who are already participating, so it is unclear whether groups cause return or whether people likely to return are also more likely to join groups. The proposed study can address this only partly, by measuring group training before the first race. Interviews can add depth here, since a beginner can explain whether a training group was the reason they kept going or merely where they happened to train.
Satisfaction and Return at Sport Events
In their study of active sport tourists at a modest annual event, Kaplanidou and Gibson (2010) reported that participants' attitudes and their satisfaction predicted whether they planned to come again. Their study, like much event research, measured intentions rather than actual return. Intentions are an imperfect guide to behavior, especially for activities as demanding as triathlon, where good intentions in September may not survive a winter of training. The proposed study's use of registration records to measure actual return, alongside survey data, responds to this weakness.
Summary of key studies
| Study | Focus | Sample | Key finding | Fit with first-timers |
|---|---|---|---|---|
| Crawford et al. (1991) | Leisure constraints | Conceptual model | Constraints negotiated in a hierarchy | General; needs adaptation to endurance events |
| Getz and McConnell (2011) | Event travel careers | Committed participants | Involvement deepens through progressive events | Explains continuation better than starting |
| Lamont and Kennelly (2011) | Competing priorities | Amateur triathletes | Work and family shape event travel | Committed athletes, not beginners |
| Kaplanidou and Gibson (2010) | Return intentions | Recurring event participants | Satisfaction predicts intention to return | Intentions, not behavior |
The Gap
Three gaps stand out. First, most studies examine committed athletes, not first-timers. Second, most measure intentions rather than actual return. Third, few studies combine survey data on constraints and experiences with records of later participation, and fewer add participants' own explanations. The proposed study addresses all three by surveying first-time finishers, linking their answers to registration records of actual return and interviewing a subset about their decisions.
Implications for the Design
The review suggests five design choices. Constraints should be measured with established items adapted from the constraints literature, covering intrapersonal, interpersonal and structural levels. Social ties should be measured as group training before the first race. Satisfaction with the race experience should be included, since it predicts intentions in event research. Return should be measured as actual behavior from records, supplemented by survey reports of racing elsewhere. And interviews should explore how first-timers negotiated or failed to negotiate constraints, since numbers alone cannot show the process.
Conclusion
Research on leisure constraints, event careers, social support and event satisfaction offers concepts and measures for studying first-time triathletes, but it has focused on committed participants and stated intentions. The proposed study fills that gap by following first-timers to see whether they actually return and asking them why, using a design shaped directly by the literature reviewed here.
References
Crawford, D. W., Jackson, E. L., & Godbey, G. (1991). A hierarchical model of leisure constraints. Leisure Sciences, 13(4), 309-320. https://doi.org/10.1080/01490409109513147
Getz, D., & McConnell, A. (2011). Serious sport tourism and event travel careers. Journal of Sport Management, 25(4), 326-338. https://doi.org/10.1123/jsm.25.4.326
Kaplanidou, K., & Gibson, H. J. (2010). Predicting behavioral intentions of active event sport tourists: The case of a small-scale recurring sports event. Journal of Sport & Tourism, 15(2), 163-179. https://doi.org/10.1080/14775085.2010.498261
Lamont, M., & Kennelly, M. (2011). I can't do everything! Competing priorities as constraints in triathlon event travel careers. Tourism Review International, 14(2), 85-97. https://doi.org/10.3727/154427211X13044361606333
What the SPT 501 Module 3 instructions ask for
The SPT 501 Module 3 assignment usually asks students to write a literature review for their proposed research, synthesizing prior studies related to the research problem. Expect to search scholarly databases, select relevant and credible sources, organize them into themes and explain what is known, what is debated and what is missing. Strong reviews compare studies with one another instead of walking through them in turn, evaluate methods and samples, assess how closely prior research matches the proposed study's population and setting, identify a specific gap and show how the literature shapes the research questions, hypotheses and methods. A short summary table of key studies can help. The review should read as an argument for the study.
How this SPT 501 Module 3 literature review assignment example is built
The assignment reviews literature for a study of first-time finishers in the Bluestem Triathlon Series, run by Lakeline Endurance Events, a fictional Ames, Iowa company. It synthesizes four themes: leisure constraints and their negotiation, serious leisure and event travel careers, social support and group participation, and satisfaction and return intentions, comparing findings and how well samples match first-time triathletes. Most studies examine committed athletes or spectators, rely on intentions rather than behavior and rarely link surveys to later participation, the gap the study fills. Design implications follow: established constraint scales, social ties, records of actual return and interviews. Crawford and colleagues, Getz and McConnell, Lamont and Kennelly and Kaplanidou and Gibson are cited.
Where the SPT 501 Module 3 rubric puts the points
The SPT 501 literature review rubric generally credits sources that are relevant and credible, themes that carry the argument, synthesis that compares findings, critical evaluation of methods and samples, attention to fit with the proposed study, a clearly identified gap, explicit implications for the design and correct APA citation. Reviews stand out when the gap is so clearly stated that the study's design follows from it. They lose points for annotated bibliographies presented as reviews, for uncritical acceptance of findings, for ignoring differences between studied populations and the proposed one or for no link to the methods. Clear structure, APA references and academic tone complete the grade.
SPT 501 Module 3 help: the mistakes that cost points
Organize your sources around the questions your study asks, not around authors. For each theme, say what studies agree on, where they differ and how strong their evidence is: sample size, setting, whether they measured behavior or only intentions. Ask how similar their participants are to yours. Then name what is missing: the question no one has answered for people like yours. Finally, say what the literature means for your design: which concepts to measure, which instruments to borrow and which weaknesses to avoid. Reviews often prove the topic matters; the stronger ones prove that this particular study is needed, with a design that answers the weaknesses they found in earlier work.
Get SPT 501 Module 3 written to your instructions
Share the SPT 501 Module 3 instructions and your research questions. A writer finds and evaluates relevant studies, synthesizes them by theme, judges how well they fit your population, identifies the gap your study fills and turns the review into design implications, with complete APA references. Your first SPT 501 literature review is drafted free, generally inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 501 papers and related MS Sport Management samples
- SPT 501 Module 1 Discussion: What Makes a Question Researchable
- SPT 501 Module 2 Research Problem Assignment: The Problem and the Questions
- SPT 501 Module 4 Discussion: Consent from Paying Customers
- SPT 501 Module 5 Research Design Assignment: A Mixed-Methods Design
- SPT 501 Module 6 Measurement Assignment: The Survey and Its Reliability
- SPT 501 Module 7 Discussion: Who Answers a Post-Race Survey
- SPT 501 Module 8 Analysis Plan Assignment: Regression and Themes
- SPT 501 Module 9 Final Project: The Research Proposal
- SPT 501 Module 10 Discussion: Reading a Published Study Critically
- ACC 610 Module 4 Discussion: Level 3 and the Limits of Fair Value
- ACC 692 Module 8 Interview Documentation Assignment: The Memorandum of Interview and a Signed Statement
- MKT 668 Module 4 Discussion: The Servicescape and Physical Evidence
- OL 635 Module 6 Discussion: Delivering Feedback and Handling Resistance
SPT 501 Module 3 questions, answered
Where can I find a free SPT 501 Module 3 literature review sample?
This page carries the complete SPT 501 Module 3 literature review for an invented triathlon first-timer study.
How should a literature review for a research proposal be organized?
By theme or research question, synthesizing studies and ending with the gap the proposed study fills and implications for its design.
What is a research gap?
A question or population that existing studies have not adequately addressed, which the proposed study is designed to fill.
Why evaluate the samples of prior studies?
Because findings from one population, such as committed athletes, may not apply to another, such as beginners.
How does a literature review shape research methods?
It suggests concepts and instruments to use, weaknesses to avoid and comparisons to make in the analysis.