SPT 501 Research Methods in Sport Management sample papers, module by module

Reviewed by Portia Lambrick, MBA

SPT 501 examines the methods used to research sport management and the sport industry, from reading and evaluating published research to designing a study: framing questions, reviewing literature, choosing qualitative, quantitative or mixed designs, measurement, sampling, ethics, analysis and writing a research proposal. The samples follow one applied study from a practical puzzle to a proposal a review board could approve.

SPT 501 is SNHU’s Research Methods in Sport Management course. It centers on Sport management research methods: researchable questions, problem statements and hypotheses, literature reviews, leisure constraints and serious leisure, research ethics and informed consent, quantitative, qualitative and mixed-methods designs, survey construction, validity and reliability, sampling and nonresponse bias, common method bias, logistic regression for yes-or-no outcomes, thematic analysis and research proposals and critique of published studies. Every module below opens a full sample paper or takes a free request for one; searches like "spt 501 module 3", "SPT501 sample paper" and "SPT 501 milestone example" land on this page.

What SPT 501 is really about

SPT 501 opens SNHU's MS Sport Management research sequence and grades students on whether their studies could actually answer the questions they ask. Credit goes to questions narrow enough to study, literature that shapes the design, methods matched to the question, measures that are defined and tested, samples whose biases are acknowledged, ethical protections for participants, analysis plans written before data are collected and honest limits.

All ten samples study Lakeline Endurance Events, a made-up company in Ames, Iowa that stages six sprint and Olympic-distance triathlons a year in Iowa and southern Minnesota for about 4,800 finishers, 44 percent of them doing their first triathlon. Lakeline, its races, its athletes and every figure in these SPT 501 samples are fictional.

What SPT 501’s modules ask for

SPT 501 commonly asks for discussions on research questions, ethics, sampling and critique of published work, assignments that build a research problem, literature review, design, instrument and analysis plan, and a final research proposal that brings them together.

Where students lose points in SPT 501

SPT 501 papers lose points when research questions are too broad to answer, literature is summarized instead of synthesized, the design does not fit the question, variables are never defined, surveys use double-barreled or leading items, reliability and validity are asserted rather than planned, nonresponse is ignored, consent and privacy are treated as formalities and analysis plans are written after the fact.

The SPT 501 drawers

Module 1

SPT 501 Module 1 Discussion example

The first SPT 501 post comes from the operations manager of Lakeline Endurance Events, an invented Ames, Iowa company that runs the six-race Bluestem Triathlon Series for about 4,800 finishers a year, 44 percent of them first-timers: only about 29 percent of first-time finishers race with the series again the next season, against about 61 percent of experienced triathletes, and the owners' question, "why don't beginners come back?", is a worry rather than a researchable question; the writer narrows it by population, outcome and time frame, separates what the company's registration records can answer from what only athletes can explain, considers whether the question is descriptive, explanatory or both, and lands on two questions: which characteristics and experiences predict whether first-time finishers return within a year, and how do first-timers describe their decisions; the post asks classmates how they narrowed their own questions and draws on Chalip on a distinctive sport management discipline, Doherty on interdisciplinary research in sport management and Getz and McConnell on event travel careers. Full sample paper, read it free.

Read the sample →
Module 2

SPT 501 Module 2 Research Problem Assignment example

The Module 2 assignment writes the research problem for a study at Lakeline Endurance Events, the invented Ames, Iowa company running the six-race Bluestem Triathlon Series: it states the problem, about 29 percent of first-time finishers return the next season against about 61 percent of experienced triathletes, a pattern that threatens the series' revenue and the growth of the sport in the region, gives the purpose, to explain which characteristics, experiences and constraints predict first-timers' return and how they describe their decisions, and sets two research questions and four hypotheses, for example that first-timers who finish in the slowest quarter, travel more than 90 minutes or report time constraints are less likely to return and that those who trained with a group are more likely to; it defines first-time finisher, return, constraints and social support as variables with measures, explains significance for the company and for participant event research, sets scope and delimitations and notes assumptions; it draws on Crawford, Jackson and Godbey on leisure constraints, Getz and McConnell on event travel careers and Lamont and Kennelly on competing priorities in triathlon. Full sample paper, read it free.

Read the sample →
Module 3

SPT 501 Module 3 Literature Review Assignment example

The Module 3 assignment reviews literature for the study of first-time finishers in the Bluestem Triathlon Series, run by Lakeline Endurance Events, the invented Ames, Iowa company: it synthesizes four themes, leisure constraints and how people negotiate them, serious leisure and event travel careers, social support and group participation, and satisfaction and return intentions at sport events, comparing what the studies found and how well their samples match first-time triathletes; it notes that most research examines committed athletes or spectators, relies on stated intentions rather than actual behavior and rarely links survey data to later participation, which is the gap the study addresses; it ends with design implications: measure constraints with established scales, include social ties, track actual return through records and pair numbers with interviews; it draws on Crawford, Jackson and Godbey, Getz and McConnell, Lamont and Kennelly and Kaplanidou and Gibson. Full sample paper, read it free.

Read the sample →
Module 4

SPT 501 Module 4 Discussion example

The Module 4 post takes up the ethics of the Lakeline Endurance Events study, in which the invented Ames, Iowa company's operations manager wants to survey and interview first-time finishers of the Bluestem Triathlon Series and link their answers to registration records: the writer names four problems, athletes may feel that saying no to the race company affects future entries, linking answers to records means the data are not anonymous, a proposed $20 entry discount could feel like pressure, and the researcher works for the company that benefits; the post responds with consent that names the record linkage plainly, a university review board, a survey hosted by the university with a coded key held separately, a smaller incentive offered to everyone who opens the survey and reporting only in groups of ten or more; it asks whether classmates would let a company employee run interviews at all and draws on Emanuel, Wendler and Grady on what makes research ethical, Singer and Ye on survey incentives and Groves on nonresponse bias. Full sample paper, read it free.

Read the sample →
Module 5

SPT 501 Module 5 Research Design Assignment example

The Module 5 assignment chooses the design for the study of first-time finishers in the Bluestem Triathlon Series, run by Lakeline Endurance Events, the invented Ames, Iowa company: it compares three options, a records-only analysis, a survey and an interview study, shows that none answers both research questions alone and chooses an explanatory sequential mixed-methods design in which an online survey of the roughly 6,300 first-time finishers from three seasons, linked to registration records of actual return, comes first and interviews with about twenty first-timers chosen from the survey results come second; it explains why the survey comes first, how interviewees will be chosen to cover returners and non-returners with different constraints and how the two strands will be integrated; it weighs threats to validity, including recall over up to three years, nonresponse, self-selection and common method bias, and the steps that limit each; its sources are Johnson and Onwuegbuzie on combining approaches, Podsakoff and colleagues on common method bias and Groves on nonresponse. Full sample paper, read it free.

Read the sample →
Module 6

SPT 501 Module 6 Measurement Assignment example

The Module 6 assignment builds the survey for the study of first-time finishers in the Bluestem Triathlon Series, run by Lakeline Endurance Events, the invented Ames, Iowa company: it maps each hypothesis to a section of the instrument, adapts constraint items into intrapersonal, interpersonal and structural scales with five-point agreement responses, writes group training, satisfaction and racing-elsewhere questions, and shows how draft items were fixed, splitting a double-barreled item about time and money and removing a leading item about the race being well organized; it plans cognitive interviews with five first-timers and a pilot with sixty, reports a pilot result in which the structural constraints scale reached a Cronbach's alpha of 0.81 but the interpersonal scale only 0.58 and was revised, and explains content, construct and criterion evidence of validity; it draws on Crawford, Jackson and Godbey on constraints, Cronbach on coefficient alpha and Boateng and colleagues on scale development. Full sample paper, read it free.

Read the sample →
Module 7

SPT 501 Module 7 Discussion example

The Module 7 post looks at who answered the pilot invitation for the Lakeline Endurance Events study, the invented Ames, Iowa company's survey of Bluestem Triathlon Series first-time finishers: of 400 first-timers invited, 92 answered, 23 percent, but 41 percent of respondents had raced again against 29 percent of everyone invited, and slow finishers and athletes who lived more than 90 minutes away were underrepresented; the writer explains why a low response rate is less worrying than response being related to the outcome, compares respondents with the records the company holds on every invitee, proposes a second contact by text message with a message aimed at people who have not raced since and weighting by return status and finish position, and admits what weighting cannot fix; the post asks whether classmates would report a weighted or unweighted result first and draws on Groves on nonresponse bias and Groves and Peytcheva's meta-analysis. Full sample paper, read it free.

Read the sample →
Module 8

SPT 501 Module 8 Analysis Plan Assignment example

The Module 8 assignment writes the analysis plan for the study of first-time finishers in the Bluestem Triathlon Series, run by Lakeline Endurance Events, the invented Ames, Iowa company, before any data are collected: it explains why the yes-or-no outcome of returning within twelve months calls for logistic regression rather than ordinary regression, lists predictors and controls, checks sample size against the guideline of about ten outcome events per predictor, which the expected 1,300 respondents with about 400 returners comfortably meet, and explains how odds ratios will be reported and interpreted; it sets rules for missing data, weighting for nonresponse and checks of assumptions; for interviews it plans six phases of thematic analysis with a second coder on a sample of transcripts and a joint display linking themes to regression results; it draws on Peng, Lee and Ingersoll on logistic regression, Peduzzi and colleagues on events per variable and Braun and Clarke on thematic analysis. Full sample paper, read it free.

Read the sample →
Module 9

SPT 501 Module 9 Final Project example

The Module 9 final project presents the complete proposal for the study of first-time finishers in the Bluestem Triathlon Series, run by Lakeline Endurance Events, the invented Ames, Iowa company: an abstract and problem, about 29 percent of first-timers returning against about 61 percent of experienced triathletes, lead into two research questions and four hypotheses; a condensed literature review on constraints, event careers and return behavior sets out the gap; the explanatory sequential design pairs an invitation to all 6,300 first-time finishers from three seasons, linked to registration records, with twenty interviews, the survey's pilot-tested scales and revised interpersonal items, nonresponse checks and weighting, consent, record linkage protections and university review, logistic regression and thematic analysis with a joint display; a six-month timeline, a $7,900 budget for incentives, transcription, a second coder and software, expected contributions to the company and to research and limitations close it; it draws on Crawford, Jackson and Godbey, Getz and McConnell, Kaplanidou and Gibson, Johnson and Onwuegbuzie, Cronbach, Groves, Emanuel and colleagues, Peng and colleagues and Braun and Clarke. Full sample paper, read it free.

Read the sample →
Module 10

SPT 501 Module 10 Discussion example

The closing SPT 501 post reads one published study critically, the Kaplanidou and Gibson article on what predicts whether participants in a small recurring sport event intend to return, from the point of view of the Lakeline Endurance Events operations manager who used it in the invented Bluestem Triathlon Series study: the writer credits the study for asking a practical question, building on prior event research and surveying actual participants, then raises three concerns, that the outcome is an intention rather than behavior, that predictors and outcome came from one questionnaire at one time and that one event limits how far the findings travel; the post explains that these concerns shaped the Bluestem design, which takes return from records and pairs numbers with interviews, and asks classmates which weakness in a study they relied on changed their own design; it draws on Kaplanidou and Gibson, Sheeran on the gap between intentions and behavior and Podsakoff and colleagues on bias from single-survey measurement. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a SPT 501 sample the right way

The SPT 501 samples build one study in order: the opening discussion turns a vague worry into a question, the problem statement sets two research questions about first-time finishers, the literature review draws on leisure constraints and event careers, an ethics discussion settles consent and data linkage, a mixed-methods design pairs a survey with interviews, an instrument with tested scales follows, a sampling discussion confronts nonresponse, an analysis plan fixes the regression and thematic steps in advance and the proposal brings it together. Send your SPT 501 assignment and research idea; your first custom sample is free and usually ready in two days.

SPT 501 questions, answered

What does SPT 501 cover?

Research methods for sport management: questions, literature reviews, qualitative, quantitative and mixed designs, measurement, sampling, ethics, analysis and research proposals.

What is the SPT 501 final project?

A research proposal for a sport management study, with the problem, questions, literature review, design, measures, sampling, ethics and analysis plan.

Is Lakeline Endurance Events real?

No. Lakeline Endurance Events, the Bluestem Triathlon Series and all athletes and figures in these SPT 501 samples are invented.