| Course | SPT 501 Research Methods in Sport Management |
|---|---|
| Module | Module 10 |
| Paper type | graduate discussion post critically evaluating a published sport management study's design, measures, sample and conclusions and explaining how the critique shaped the student's own research |
| Length | About 340 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 501 Module 10
Module Ten Discussion
What One Study Taught My Design
Kaplanidou and Gibson (2010) studied people who took part in a small, recurring sport event and asked what predicted their intention to come back. They surveyed participants about their attitudes toward the event and their experience of it and found that how participants felt about the event helped predict whether they intended to return. I relied on this study in the Lakeline Endurance Events project because it is one of the few that examine participants at a small event like our Bluestem races rather than spectators at a major one.
The study asks a question event organizers care about, builds on earlier research about why people travel to take part in sport and surveys people who actually took part. For small events with limited budgets, knowing that the participant's experience shapes the decision to return is useful.
First, the outcome is an intention. Sheeran (2002) reviewed research on intentions and behavior and found that intentions predict behavior only moderately, with many people who intend to act failing to do so. For a demanding sport like triathlon, a September intention to race again must survive a winter of training. The study tells us who plans to return, which is not the same as who does.
Second, predictors and outcome came from the same questionnaire at the same time. Podsakoff et al. (2003) showed that this can inflate the relationships between measures, for example when a respondent in a good mood rates both satisfaction and intention highly. The relationships may be real but smaller than they appear.
Third, one event limits how far findings travel. That is a limitation of most event studies rather than a flaw the authors could easily have avoided, so I weigh it less.
These concerns shaped our design. We take return from registration records, so our outcome is behavior, measured separately from the survey. And we interview athletes, because a survey cannot show why an intention did or did not become a return.
Which weakness in a study you relied on changed your own design?
References
Kaplanidou, K., & Gibson, H. J. (2010). Predicting behavioral intentions of active event sport tourists: The case of a small-scale recurring sports event. Journal of Sport & Tourism, 15(2), 163-179. https://doi.org/10.1080/14775085.2010.498261
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003). Common method biases in behavioral research: A critical review of the literature and recommended remedies. Journal of Applied Psychology, 88(5), 879-903. https://doi.org/10.1037/0021-9010.88.5.879
Sheeran, P. (2002). Intention-behavior relations: A conceptual and empirical review. European Review of Social Psychology, 12(1), 1-36. https://doi.org/10.1080/14792772143000003
What the SPT 501 Module 10 instructions ask for
The final SPT 501 discussion often asks students to critically evaluate a published research study in sport management, considering its research question, design, sampling, measures, analysis and conclusions, and to reflect on what the course has taught them about research. Expect to summarize the study briefly and focus most of the post on evaluation. Strong posts are fair as well as critical, crediting what the study does well, distinguishing serious flaws from limitations any study of its kind would have and asking whether the conclusions follow from the evidence. They connect the critique to their own work, showing how reading research critically changed their design. Replies should engage with the evidence in classmates' chosen studies.
How this SPT 501 Module 10 discussion example is built
The post critiques the Kaplanidou and Gibson article on what predicts whether participants in a small recurring sport event intend to return, from the view of the Lakeline Endurance Events operations manager, whose fictional company's study used it. The study is credited for a practical question, grounding in prior research and surveying real participants. Three concerns follow: the outcome is an intention, not behavior; predictors and outcome came from one questionnaire at one time; and one event limits generalization. The writer explains how these shaped the Bluestem design, which takes return from records and adds interviews, and asks classmates which weakness changed their design. Kaplanidou and Gibson, Sheeran and Podsakoff and colleagues are cited.
Where the SPT 501 Module 10 rubric puts the points
For the closing SPT 501 discussion, instructors usually credit a brief accurate summary, evaluation of design, sample, measures and conclusions, fairness in recognizing strengths, a distinction between flaws and ordinary limitations, a judgment about whether conclusions follow from evidence and a connection to the student's own research. Posts earn the most when the critique would help someone using the study. They lose points for summaries without evaluation, for dismissing studies over limitations every study shares or for critiques with no link to the student's work. Two or more APA sources and replies engaging the evidence in classmates' studies finish the grade, with a closing note on what the course changed.
SPT 501 Module 10 help: the mistakes that cost points
Summarize the study in three sentences: question, method, main finding. Then ask what it does well before what it does poorly. Look at the outcome: was it behavior or a stated intention? Look at measurement: were predictors and outcome collected the same way at the same time? Look at the sample: who was studied, and whom would you apply the findings to? Decide whether each weakness is a flaw the authors could have avoided or a limitation of the design type. Then say what the study taught you about your own design. Posts often list weaknesses; the useful critique explains how much each one matters for the conclusions and what a better design would do.
Get SPT 501 Module 10 written to your instructions
Paste the SPT 501 Module 10 prompt and the study you want to critique. A writer evaluates its question, theory, design, sample, measures and conclusions fairly, separates real weaknesses from unavoidable trade-offs and connects the critique to your own research, with sources and a question for classmates. Your first SPT 501 post costs nothing, with delivery in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 501 papers and related MS Sport Management samples
- SPT 501 Module 1 Discussion: What Makes a Question Researchable
- SPT 501 Module 2 Research Problem Assignment: The Problem and the Questions
- SPT 501 Module 3 Literature Review Assignment: Constraints, Careers and Coming Back
- SPT 501 Module 4 Discussion: Consent from Paying Customers
- SPT 501 Module 5 Research Design Assignment: A Mixed-Methods Design
- SPT 501 Module 6 Measurement Assignment: The Survey and Its Reliability
- SPT 501 Module 7 Discussion: Who Answers a Post-Race Survey
- SPT 501 Module 8 Analysis Plan Assignment: Regression and Themes
- SPT 501 Module 9 Final Project: The Research Proposal
- MKT 660 Module 6 Milestone Two: Nonprofit Marketing Mix
- INT 620 Module 7 Capital Budgeting Assignment: Valuing the Gujarat Plant
- FIN 685 Module 8 Operational Risk Assignment: Cyberattack, a Roaster Fire and What Insurance Covers
- QSO 690 Module 8 Maintenance Analytics Assignment: Predicting Laser Cutter Failures
SPT 501 Module 10 questions, answered
Where can I find a free SPT 501 Module 10 Discussion sample?
This page holds the complete SPT 501 Module 10 post critiquing a published sport event study for an invented triathlon project.
What should a critique of a research study evaluate?
The research question, theory, design, sample, measures, analysis and whether the conclusions follow from the evidence.
Why are behavioral intentions an imperfect outcome?
People often fail to act on their intentions, so intentions can overstate how many will actually return or buy.
Is every limitation a flaw?
No; some limitations come with any study of that type, while flaws are weaknesses the researchers could reasonably have avoided.
How can critiquing published research improve one's own study?
It reveals weaknesses to avoid, measures to borrow and questions that remain unanswered.