INT 620 Module 7 Capital Budgeting Assignment Example

Reviewed by Portia Lambrick, MBA

This INT 620 Module 7 Capital Budgeting Assignment sample values a foreign investment the way a multinational's finance team should, from more than one point of view. SNHU INT 620 (INT-620) asks MS Finance students to apply discounted cash flow methods to cross-border projects, dealing with currencies, taxes, country risk and financing effects. For Kettle Moraine Process Systems, a composite Wisconsin equipment maker, the paper values a proposed plant in Gujarat, India, converting rupee cash flows at a forecast exchange rate path, estimating a discount rate with a country risk premium, calculating net present value from the project and parent perspectives, adding an adjusted present value analysis and testing key assumptions.

CourseINT 620 International Corporate Finance
ModuleModule 7
Paper typegraduate international capital budgeting assignment with project and parent perspectives and adjusted present value
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for INT 620 Module 7

1

Rupees, Withholding and Tax Shields: Valuing Kettle Moraine's Gujarat Plant Three Ways

[Student Name]

Southern New Hampshire University

INT 620: International Corporate Finance

International Capital Budgeting Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingKettle Moraine Process Systems and the Gujarat plant are fictional; cash flows, rates, the subsidy and tax figures are illustrative.
2

Rupees, Withholding and Tax Shields: Valuing Kettle Moraine's Gujarat Plant Three Ways

Introduction

Kettle Moraine Process Systems proposes to build a plant in Gujarat, India's largest dairy-producing state, to make pasteurizers, tanks and separators for Indian and Asian customers. The plant would cost about $160 million over three years and begin producing in year two. This assignment values the investment three ways: as a stand-alone project, from the parent's perspective after taxes on remittances and through adjusted present value, which separates the value of the project from the value of its financing and the state subsidy. It then tests the result against the assumptions that matter most.

What this page is doingA plant worth $160 million?
3

Cash Flows and Currency

Cash flows were forecast in rupees from expected sales, margins and capital spending, then converted to dollars using a forecast path in which the rupee depreciates against the dollar by about 2.5 percent a year, roughly the gap between expected Indian inflation of about 5 percent and U.S. inflation of about 2.5 percent, consistent with relative purchasing power parity over the long run. Converting at today's spot rate would overstate dollar value; converting at the forward rates implied by India's higher interest rates would assume a steeper depreciation than inflation suggests.

Investment and free cash flow in dollars, millions

ItemStartY1Y2Y3Y4Y5Y6Y7Y8Y9Y10
Investment-60-70-30
Free cash flow81824283133353637

Beyond the tenth year the forecast lets dollar cash flow rise 2 percent annually, which at 11 percent implies a continuing value near $419 million. Gujarat's industrial policy offers capital subsidies to large manufacturing investments; the plan assumes a subsidy of $8 million received in year two, which should be confirmed with state authorities.

What this page is doingRupees into dollars.
4

Discount Rate

The parent's dollar weighted average cost of capital is 9 percent. Godfrey and Espinosa (1996) proposed practical ways to estimate costs of equity for emerging-market investments, adjusting for country risk through sovereign spreads while warning against double counting. Following the country risk discussion, the analysis adds a premium near India's sovereign spread over U.S. Treasuries, about 2 percent, for a project discount rate of 11 percent. Specific risks, such as approval delays, are handled in scenarios rather than in the rate. As a check, the 11 percent rate sits between the parent's 9 percent and the 13 percent the old rule would impose, and it is close to the return an investor would demand from a diversified Indian industrial company after converting to dollars.

What this page is doingBuilding the rate.
5

Project Perspective

At 11 percent, the investment outlays, operating cash flows and terminal value give a net present value of about $127 million, or about $134 million with the state subsidy. Graham and Harvey (2001) found that most large U.S. finance chiefs leaned mainly on discounted cash flow rules, and many raised hurdle rates for overseas work, so the board will recognize the format.

What this page is doingNet present value.
6

Parent Perspective

The parent receives only what the subsidiary sends home. From year four, the plan assumes the Indian subsidiary remits 70 percent of free cash flow as dividends, subject to a 15 percent withholding tax under the U.S.-India tax treaty, with the rest reinvested. Deducting the withholding reduces the net present value from the parent's perspective, including the subsidy, to about $107 million. India does not restrict dividend remittances for companies in compliance, so no blocked funds adjustment is needed, though remittances require documentation through authorized banks.

What this page is doingWhat reaches Waukesha.
7

Adjusted Present Value

Myers (1974) proposed adjusted present value, valuing a project first as if financed entirely by equity and then adding the value of financing side effects such as interest tax shields and subsidized loans. Using an unlevered cost of capital of 10.5 percent, the base-case value with the subsidy is about $153 million. The plant would be financed partly with a rupee term loan equivalent to $60 million at 9 percent interest; at India's corporate tax rate of about 25 percent, the present value of seven years of interest tax shields, discounted at the loan rate, is about $7 million. The adjusted present value is therefore about $160 million. The method makes clear how much of the project's value comes from operations and how much from financing and the subsidy, which matters for the financing decision in the next milestone.

What this page is doingSeparating financing effects.
8

Sensitivity

Project net present value with subsidy under alternative assumptions, millions of dollars

Assumption changedValue
Base case, 11 percent, 2 percent terminal growth134
Discount rate 13 percent76
Terminal growth 0 percent104
Rupee weakens by 4.5 rather than 2.5 percent yearlyabout 93
Cash flows 20 percent below planabout 79

No single bad assumption pushes the value below zero, yet over half of it sits in the continuing value beyond year ten. The discount rate matters a great deal: the inherited 13 percent rule would cut the estimated value almost in half.

What this page is doingWhat drives the answer.
9

Real Options

The static valuation treats the three tranches of spending as fixed, but Kettle Moraine has choices along the way. It can delay the third tranche, about $30 million for an evaporator line, if Indian dairy investment slows, which limits the downside. It can expand the plant later to serve Southeast Asian customers if demand grows, an option that adds value the base case does not count. And it could, in a bad case, sell the land and building, which Gujarat's industrial demand would support. These options mean the true value of the project is somewhat higher, and its risk somewhat lower, than the single net present value suggests. They also argue for designing the plant so that the expansion option is cheap to exercise, for example by acquiring a larger site than the first phase needs.

What this page is doingFlexibility the NPV ignores.
10

Recommendation

The Gujarat plant creates value under the base case and each tested downside. Kettle Moraine should proceed, provided the state subsidy is confirmed in writing, construction is phased so that the third tranche of spending can be delayed if Indian demand disappoints and the board reviews the terminal value assumptions against actual year-five results.

What this page is doingProceed, with conditions.
11

Conclusion

The project, parent and adjusted present value views all point the same way, though they differ in size because of withholding taxes, financing effects and the subsidy. The analysis shows that the decision is sound and that the discount rate and long-run growth deserve the most attention.

What this page is doingThree views, one decision.
12

References

Godfrey, S., & Espinosa, R. (1996). A practical approach to calculating costs of equity for investments in emerging markets. Journal of Applied Corporate Finance, 9(3), 80-90. https://doi.org/10.1111/j.1745-6622.1996.tb00300.x

Graham, J. R., & Harvey, C. R. (2001). The theory and practice of corporate finance: Evidence from the field. Journal of Financial Economics, 60(2-3), 187-243. https://doi.org/10.1016/S0304-405X(01)00044-7

Myers, S. C. (1974). Interactions of corporate financing and investment decisions: Implications for capital budgeting. The Journal of Finance, 29(1), 1-25. https://doi.org/10.2307/2978211

What the INT 620 Module 7 instructions ask for

The international capital budgeting assignment in INT 620 usually asks you to evaluate a foreign investment using net present value and related methods, accounting for exchange rates, foreign taxes, withholding taxes on remittances, country risk, subsidies and financing. Expect to forecast cash flows, choose a discount rate, compare project and parent perspectives and test sensitivity. A strong paper converts foreign cash flows with a forecast consistent with parity relationships, avoids double counting risk, shows how remittance taxes and restrictions change the parent's view, separates financing effects through adjusted present value where relevant and presents sensitivities that reveal which assumptions drive the decision.

How this INT 620 Module 7 capital budgeting assignment example is built

The sample values a $160 million plant in Gujarat, spent over three years. Rupee cash flows are converted at a forecast path in which the rupee depreciates about 2.5 percent a year, consistent with the inflation gap, giving dollar free cash flows rising from $8 million in year two to $37 million in year ten, plus a terminal value. At 11 percent, the project net present value is about $127 million, or $134 million with an $8 million state capital subsidy. The parent's view, after 15 percent withholding on dividends, is about $107 million. An adjusted present value at a 10.5 percent unlevered rate plus the rupee loan's tax shields gives about $160 million. Sensitivities follow.

Where the INT 620 Module 7 rubric puts the points

The rubric for international capital budgeting commonly weighs cash flow forecasting, treatment of exchange rates, the discount rate and country risk, project versus parent analysis, treatment of taxes and subsidies, sensitivity analysis and clarity of the recommendation, along with APA style. Exemplary papers present cash flows and assumptions transparently, use consistent currency and discount rate pairs, explain why parent and project values differ, separate financing effects and show which assumptions matter. Papers lose marks for mixing currencies and rates, for ignoring withholding taxes, for adding country risk to both rates and cash flows, for omitting terminal value assumptions and for leaving out sensitivities. Noting the flexibility a project carries, such as the option to delay or expand, shows awareness of what a static NPV misses.

INT 620 Module 7 help: the mistakes that cost points

Forecast cash flows in the project's local currency first, then convert them with a forecast exchange rate path consistent with inflation or interest differentials, or discount in local currency with a local rate; do not mix. Choose a discount rate and explain any country risk premium. Value the project as a stand-alone business, then from the parent's view, deducting withholding taxes and any restrictions on remittance. Consider adjusted present value to separate the value of the project from the value of its financing and subsidies. Present a sensitivity table for the discount rate, terminal growth and exchange rates. Finish with a clear recommendation and the assumptions it depends on.

Get INT 620 Module 7 written to your instructions

Upload the INT 620 Module 7 instructions and your project's cash flows. We convert currencies on a defensible path, build the discount rate, value the project from the subsidiary's and parent's views, add adjusted present value and stress-test the result. Plan on about two days; first assignments cost nothing. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 620 papers and related MS Finance samples

INT 620 Module 7 questions, answered

Where can I find a free INT 620 Module 7 Capital Budgeting Assignment sample?

The full INT 620 Module 7 assignment is on this page, valuing a plant in India with project and parent NPVs, APV and sensitivities.

What is the difference between project and parent perspective in capital budgeting?

The project view values cash flows the foreign subsidiary generates; the parent view values only the cash that reaches the parent after withholding taxes, fees and remittance limits.

What is adjusted present value?

A method that values a project as if all-equity financed, then adds the separate values of financing effects such as interest tax shields and subsidized loans.

How should exchange rates be forecast in capital budgeting?

Commonly with a path consistent with inflation or interest rate differentials, so the dollar cash flows and dollar discount rate are internally consistent.

How is a cost of equity estimated for an emerging market project?

Approaches include adding a country risk premium based on sovereign spreads or adjusting beta for relative market volatility, with care not to double count risk.