| Course | INT 620 International Corporate Finance |
|---|---|
| Module | Module 4 |
| Paper type | graduate assignment analyzing and hedging transaction exposure |
| Length | About 1,030 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for INT 620 Module 4
Locking In, Capping and Netting: Hedging a New Zealand Dollar Receivable and a Euro Payable at Kettle Moraine
[Student Name]
Southern New Hampshire University
INT 620: International Corporate Finance
Transaction Exposure Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Locking In, Capping and Netting: Hedging a New Zealand Dollar Receivable and a Euro Payable at Kettle Moraine
Introduction
Kettle Moraine Process Systems' treasury has two significant transaction exposures this quarter. Its New Zealand subsidiary has invoiced a dairy cooperative NZ$12 million for an evaporator line, payable in six months, and the parent owes €8 million to a German maker of centrifuge components, payable in nine months. Because both amounts are fixed in foreign currency, their dollar values will change with exchange rates until settlement. Together they represent about $16 million, enough that an adverse move of 10 percent would cost roughly as much as a quarter's profit from the New Zealand subsidiary. Four responses are tested for each position, doing nothing, selling or buying forward, a borrow-and-convert hedge and options, calculates outcomes under several scenarios, considers an internal offset and recommends a hedge for each.
Market Data
Illustrative market data on the analysis date
| Item | New Zealand dollar | Euro |
|---|---|---|
| Spot rate, dollars per unit | 0.6000 | 1.0850 |
| Forward rate for the settlement date | 0.6014 for six months | 1.1010 for nine months |
| Annual interest rate, foreign | 4.00 percent | 2.50 percent |
| U.S. dollar rate, annual | 4.5 percent in both cases | |
| Option | Six-month put, strike 0.6000, premium $0.0090 | Nine-month call, strike 1.1000, premium $0.0220 |
The Receivable
A forward sale of NZ$12 million at 0.6014 locks in $7,216,800 at settlement. A money market hedge produces nearly the same result: Kettle Moraine takes out a New Zealand dollar loan sized to the receivable's present value, NZ$12 million divided by 1.02, or NZ$11,764,706, converts it at the spot rate to $7,058,824 and invests the dollars at 2.25 percent for six months, giving about $7,217,600 at settlement, while the receivable repays the New Zealand loan. The two results differ by under $1,000 because covered interest parity holds. A six-month put option on NZ$12 million at a strike of 0.6000 costs $108,000 today and guarantees at least $7,200,000 before the premium, or about $7,092,000 after it, ignoring the small interest cost of paying the premium early, while allowing Kettle Moraine to benefit if the New Zealand dollar rises.
Receivable outcomes at settlement, dollars
| Spot in six months | Unhedged | Forward | Money market | Put option, after premium |
|---|---|---|---|---|
| 0.5600 | 6,720,000 | 7,216,800 | 7,217,600 | 7,092,000 |
| 0.6000 | 7,200,000 | 7,216,800 | 7,217,600 | 7,092,000 |
| 0.6400 | 7,680,000 | 7,216,800 | 7,217,600 | 7,572,000 |
The Payable
A forward purchase of €8 million at 1.1010 fixes the cost at $8,808,000. A nine-month call option with a strike of 1.1000 costs $176,000 and caps the cost at $8,800,000 before the premium, or about $8,976,000 after it, while allowing a lower cost if the euro weakens. Before hedging externally, however, the treasury should look inside the group. The Dutch subsidiary expects a euro cash surplus of about €5 million over the same period from dividends and collections. Netting that surplus against the payable, through an intercompany loan or dividend in euros, would leave only €3 million to hedge externally.
Payable outcomes for the full €8 million, dollars
| Spot in nine months | Unhedged | Forward | Call option, after premium |
|---|---|---|---|
| 1.0400 | 8,320,000 | 8,808,000 | 8,496,000 |
| 1.1000 | 8,800,000 | 8,808,000 | 8,976,000 |
| 1.1600 | 9,280,000 | 8,808,000 | 8,976,000 |
What Firms Actually Do
The 1998 Wharton survey found that among U.S. nonfinancial firms using derivatives, forwards were the most common instrument for managing currency risk, and that firms most often hedged anticipated transactions within a year (Bodnar et al., 1998). Firms with greater growth opportunities and tighter financial constraints were more likely to use currency derivatives, consistent with hedging to protect investment plans (Géczy et al., 1997). Allayannis and Ofek (2001) found that firms' use of currency derivatives was associated with lower exchange rate exposure, suggesting the instruments reduce risk rather than add speculation.
Other Tools
Financial hedges are not the only tools. Kettle Moraine could ask the New Zealand cooperative to pay earlier in exchange for a small discount, shortening the exposure, or invoice future New Zealand orders in dollars, shifting the risk to the customer, though cooperatives that earn in New Zealand dollars resist that. For the payable, the company could negotiate future German orders in dollars, but the supplier would likely build a risk premium into its price. Within the group, a regular netting cycle among the parent and its three subsidiaries would cut the number and size of external currency trades, saving bank spreads. These operational tools work best as standing policies rather than one-off decisions, and they reduce the volume of exposure that financial hedges must cover.
Accounting and Credit
Two practical points shape the choice. Forward contracts use the company's credit lines with its banks, which are also needed for the Gujarat financing, so the treasury must watch how much forward cover it carries. And Kettle Moraine applies hedge accounting under U.S. rules to its forward contracts, which requires documentation at inception that the hedge matches a specific exposure; the treasury's documentation template should be completed for both trades on the day they are placed.
Recommendation
For the receivable, Kettle Moraine should sell the New Zealand dollars forward. The amount is large relative to the subsidiary's annual cash flow, the cooperative is a reliable payer and locking in about $7.2 million protects the Gujarat funding plan, as the hedging policy discussion recommended. The put option's $108,000 premium buys upside the firm does not need. For the payable, it should net €5 million against the Dutch surplus and buy the remaining €3 million forward at 1.1010, about $3.3 million, rather than paying $66,000 in premium for a call on that amount.
Risks
If the cooperative pays late, the forward contract would need to be extended at a new rate, so the treasury should keep a small buffer or use a forward with a settlement window. If the Dutch subsidiary's surplus falls short, the unhedged part of the payable grows; the treasury will review the forecast monthly and add forward cover if needed.
Conclusion
Because covered parity ties them together, the forward and the borrow-convert-invest route land within a rounding error of each other, and the choice comes down to credit lines and paperwork. Options are insurance with a real cost, worth buying when exposures are uncertain or upside matters. For these two committed positions, forwards and an internal offset protect Kettle Moraine's cash at the lowest cost, leaving option premiums for the uncertain exposures where their flexibility is worth paying for.
References
Allayannis, G., & Ofek, E. (2001). Exchange rate exposure, hedging, and the use of foreign currency derivatives. Journal of International Money and Finance, 20(2), 273-296. https://doi.org/10.1016/S0261-5606(00)00050-4
Bodnar, G. M., Hayt, G. S., & Marston, R. C. (1998). 1998 Wharton survey of financial risk management by US non-financial firms. Financial Management, 27(4), 70-91. https://doi.org/10.2307/3666414
Géczy, C., Minton, B. A., & Schrand, C. (1997). Why firms use currency derivatives. The Journal of Finance, 52(4), 1323-1354. https://doi.org/10.1111/j.1540-6261.1997.tb01112.x
What the INT 620 Module 4 instructions ask for
The transaction exposure assignment in INT 620 usually asks you to analyze a company's foreign currency receivables or payables and compare ways to manage the risk, such as forward contracts, futures, money market hedges, options and operational techniques like netting or leading and lagging. Expect to calculate the dollar value of each alternative, compare outcomes under different exchange rate scenarios and recommend a strategy. A strong paper sets out the data and assumptions clearly, shows each calculation, explains why forward and money market hedges give similar results when covered parity holds, evaluates options as insurance with a cost and considers internal offsets before buying external hedges.
How this INT 620 Module 4 transaction exposure assignment example is built
The sample analyzes a NZ$12 million receivable due in six months from a New Zealand dairy cooperative and a €8 million payable due in nine months to a German component maker. With illustrative rates, the forward hedge locks the receivable at $7,216,800 and the money market hedge at about $7,217,600, nearly identical because covered parity holds. A put option with a $0.60 strike sets a floor of about $7,092,000 after its premium while keeping the upside. For the payable, the forward costs $8,808,000 and a call option caps the cost near $8,976,000. Netting €5 million against the Dutch subsidiary's euro surplus reduces the external hedge to €3 million.
Where the INT 620 Module 4 rubric puts the points
The rubric typically considers the identification of exposure, the accuracy of hedging calculations, the comparison of alternatives under scenarios, the use of operational techniques, the quality of the recommendation and the use of sources and APA style. High-scoring papers show every step, explain the equivalence of forward and money market hedges, treat options as paid insurance, consider internal offsets and recommend hedges suited to the firm's risk tolerance and cash needs. Papers lose points for calculation errors, for comparing hedges at a single assumed future rate, for ignoring option premiums or their timing and for overlooking netting opportunities inside the group. Checking internal offsets before buying external hedges is a step graders often look for and many papers skip.
INT 620 Module 4 help: the mistakes that cost points
Lay out each position: amount, currency, due date and whether it is a receivable or payable. Gather the spot rate, forward rate for the right maturity, interest rates and option quotes, and state the date. Calculate the dollar outcome for each alternative, then build a table of outcomes at three possible future spot rates, low, middle and high. You will see that the forward and money market hedge almost match, which is the point of covered parity. Show options as insurance: the premium buys protection plus upside. Before choosing, ask whether another unit of the company has an offsetting position. Finish with a recommendation tied to how much risk the firm can bear.
Get INT 620 Module 4 written to your instructions
Upload the INT 620 Module 4 instructions and the receivables or payables you need to hedge. We compute forward, money market and option outcomes under several scenarios, look for internal offsets and recommend a hedge for each position with the reasoning shown. Turnaround runs about two days; the first assignment is complimentary. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 620 papers and related MS Finance samples
- INT 620 Module 1 Discussion: When Cash Arrives in Four Currencies
- INT 620 Module 2 Parity Conditions Assignment: Do Interest and Price Parity Hold for the Euro, Kiwi and Real?
- INT 620 Module 3 Discussion: Should Kettle Moraine Hedge at All?
- INT 620 Module 5 Milestone One: Economic and Translation Exposure Across the Group
- INT 620 Module 6 Discussion: Pricing India's Risk Into the Discount Rate
- INT 620 Module 7 Capital Budgeting Assignment: Valuing the Gujarat Plant
- INT 620 Module 8 Milestone Two: Financing the Plant: Rupees, Dollars or Euros
- INT 620 Module 9 Discussion: Cash Pools, Dividends and Transfer Prices
- INT 620 Module 10 Final Project: The International Financial Strategy
- BMB 670 Module 6 Milestone Two: Safety, Fees and Sponsors
- FIN 550 Module 3 Milestone One: A Three-Year Forecast Built From Drivers
- ACC 550 Module 4 Discussion: Which Activities Add Value in a Sheller?
- HRM 630 Module 7 Statistical Process Control Assignment: A Control Chart on Missed Visits
INT 620 Module 4 questions, answered
Where can I find a free INT 620 Module 4 Transaction Exposure Assignment sample?
The full INT 620 Module 4 assignment is on this page, hedging a NZ dollar receivable and a euro payable with forwards, money market hedges and options.
What is transaction exposure?
The risk that the home-currency value of a contracted foreign currency receivable or payable will change between the transaction date and settlement.
How does a money market hedge work?
The company borrows foreign currency now, converts it at spot and invests the proceeds at home, then uses the incoming receivable to pay off the foreign loan, fixing the rate today.
When should a company use options instead of forwards?
When it wants protection against adverse moves but values the chance to benefit from favorable ones, or when the exposure is uncertain, accepting the premium as the price.
What is netting in currency risk management?
Offsetting receivables and payables in the same currency within a corporate group so that only the net amount needs to be hedged or converted.