INT 620 Module 8 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This INT 620 Module 8 Milestone Two sample decides how a multinational should finance a major foreign investment, weighing cost, currency risk, taxes and local rules. In SNHU INT 620 (INT-620), the second milestone asks MS Finance students to choose financing for a foreign subsidiary and defend the mix. For Kettle Moraine Process Systems, a composite Wisconsin equipment maker building a plant in India, the paper compares rupee bank debt, a dollar loan from the parent, euro borrowing through its Dutch subsidiary and parent equity, adjusts nominal interest costs for expected currency movements, considers the hedge that local debt provides, accounts for Indian borrowing and interest deduction rules and recommends a financing mix.

CourseINT 620 International Corporate Finance
ModuleModule 8
Paper typegraduate milestone analyzing how to finance a foreign subsidiary investment
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for INT 620 Module 8

1

Matching the Debt to the Rupees: Financing Kettle Moraine's Gujarat Plant

[Student Name]

Southern New Hampshire University

INT 620: International Corporate Finance

Milestone Two: International Financing Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingKettle Moraine Process Systems is fictional; interest rates, tax figures and regulatory descriptions are illustrative and should be confirmed with advisers.
2

Matching the Debt to the Rupees: Financing Kettle Moraine's Gujarat Plant

Introduction

The capital budgeting assignment found that Kettle Moraine Process Systems' proposed Gujarat plant creates value, with an adjusted present value of about $160 million that includes the tax shields of a rupee loan. This milestone decides how to finance the $160 million investment. It compares four sources, rupee bank debt, a dollar loan from the parent, euro borrowing through the Dutch subsidiary and parent equity, on an effective cost basis, then weighs currency matching, Indian borrowing and tax rules and the group's capital structure before recommending a mix.

What this page is doingPaying for the plant.
3

Options

Indian banks have offered a seven-year rupee term loan at about 9 percent. The parent could lend dollars from its revolving credit facility at about 5.5 percent. The Dutch subsidiary could borrow euros at about 3.5 percent and relend them to India. And the parent could fund the plant with equity, drawing on cash from operations and its credit facility.

What this page is doingFour sources.
4

Effective Costs

Nominal rates cannot be compared directly across currencies. If the rupee depreciates about 2.5 percent a year against the dollar, as the capital budgeting forecast assumes, a dollar loan's cost to the Indian subsidiary, measured in rupees, rises by roughly that amount, to about 8 percent. Euro borrowing, if the euro holds steady against the dollar, costs the subsidiary about 6 percent in rupee terms, but carries two currency risks rather than one. The rupee loan's 9 percent is higher on paper, but its cost is fixed in the currency the plant earns.

Approximate effective cost to the Indian subsidiary, in rupee terms

SourceNominal rateExpected currency effectApproximate effective costCurrency risk for the subsidiary
Rupee bank loan9.0 percentNone9.0 percentNone
Dollar loan from parent5.5 percentRupee falls about 2.5 percent a yearabout 8.0 percentDollar debt, rupee revenue
Euro loan via Dutch subsidiary3.5 percentRupee falls about 2.5 percent a year against euroabout 6.0 percentEuro debt, rupee revenue
Parent equityCost of equityNot applicableHighestNone at subsidiary level
What this page is doingComparing like with like.
5

Currency Matching

The plant will earn rupees from Indian customers. Debt in rupees makes interest and principal payments rise and fall with the revenue that pays them, reducing the risk that a sharp rupee fall would leave the subsidiary unable to service foreign currency debt. Allayannis et al. (2003), studying East Asian firms before and after the 1997 crisis, found that firms with foreign currency debt but without matching foreign revenue or hedges fared worse when local currencies collapsed, while those whose debt matched their revenue did not suffer the same losses. Kedia and Mozumdar (2003) found that U.S. firms' use of foreign currency debt was explained largely by the need to hedge foreign currency exposure, along with access to deeper markets. For Kettle Moraine, that logic favors rupee debt for the Indian plant.

What this page is doingDebt as a hedge.
6

Rules and Taxes

Loans from the parent or the Dutch subsidiary to the Indian company would count as external commercial borrowing under Indian rules, which set conditions on eligible lenders, maturities, uses and all-in costs. Interest paid to foreign lenders is subject to Indian withholding tax, reduced under tax treaties. India also limits deductions for interest on debt from related foreign companies above a set fraction of operating earnings, which would cap the tax benefit of a large parent loan. Rupee bank debt avoids these constraints, and its interest is fully deductible within normal limits.

What this page is doingIndian constraints.
7

Internal Capital Markets

Desai et al. (2004) showed that U.S. parents lent to their own affiliates in place of outside borrowing where lender protections were weak and local credit dear. India's banking market is deep enough to lend at reasonable rates to a subsidiary backed by Kettle Moraine's guarantee, so the case for substituting internal loans is weaker here than it would be in a less developed market. Internal funding still has a role as equity, which provides the plant's long-term base.

What this page is doingWhat research says.
8

Group Capital Structure

Kettle Moraine's consolidated debt is about two times operating earnings, comfortably within its covenants. Adding $64 million of rupee debt and funding the rest with equity from operating cash flow and modest use of the credit facility keeps consolidated debt below two and a half times earnings during construction, protecting the company's credit rating.

What this page is doingThe parent's view.
9

Recommendation

Kettle Moraine should finance the plant with about $64 million equivalent of rupee term loans from Indian banks, guaranteed by the parent, and about $96 million of parent equity contributed as construction proceeds. The rupee loan matches the plant's revenue, provides deductible interest within Indian limits and avoids the external commercial borrowing process. The equity avoids related-party interest limits and keeps the subsidiary's balance sheet strong for local customers and suppliers. As the plant matures and generates stable cash, the subsidiary can refinance or add rupee debt and return capital to the parent through dividends.

What this page is doingAbout 40 percent rupee debt.
10

Timing and Drawdown

Financing should follow the spending schedule. Parent equity would fund the first year's outlays, when the subsidiary has no revenue and bank lenders want to see the owner's commitment. The rupee term loan would be signed in year one and drawn in years one and two as equipment is installed, with repayments beginning in year three, once the plant produces. That sequence keeps interest costs low during construction and gives Indian banks the comfort of an operating plant before principal falls due. A standby line of credit from the same banks, about $10 million equivalent, would cover working capital as the first orders ramp up.

What this page is doingMatching money to construction.
11

Trade-Offs

The mix forgoes the lower nominal coupons of dollar and euro debt, but those coupons largely reflect expected currency movements and carry mismatch risk. It also ties up more parent capital than a debt-heavy structure would. If the rupee depreciates less than expected, the dollar loan would have proved cheaper in hindsight, a risk the company accepts for the certainty of matching.

What this page is doingWhat the recommendation gives up.
12

Conclusion

For a subsidiary that earns rupees, the cheapest-looking loan is not the cheapest once currency risk is counted. Rupee bank debt and parent equity give Kettle Moraine's Gujarat plant a financing structure that fits its revenue, Indian rules and the group's balance sheet.

What this page is doingMatch first, then minimize.
13

References

Allayannis, G., Brown, G. W., & Klapper, L. F. (2003). Capital structure and financial risk: Evidence from foreign debt use in East Asia. The Journal of Finance, 58(6), 2667-2710. https://doi.org/10.1046/j.1540-6261.2003.00619.x

Desai, M. A., Foley, C. F., & Hines, J. R., Jr. (2004). A multinational perspective on capital structure choice and internal capital markets. The Journal of Finance, 59(6), 2451-2487. https://doi.org/10.1111/j.1540-6261.2004.00706.x

Kedia, S., & Mozumdar, A. (2003). Foreign currency-denominated debt: An empirical examination. The Journal of Business, 76(4), 521-546. https://doi.org/10.1086/377029

What the INT 620 Module 8 instructions ask for

Milestone Two in INT 620 usually asks you to recommend how a multinational should finance a foreign operation or project, considering sources such as local bank loans, parent loans, international bonds, equity and internal funds. Expect to compare costs, currency risk, tax effects, regulatory constraints and effects on the group's capital structure. A strong milestone compares options on an effective cost basis that includes expected exchange rate changes, explains how debt in the project's currency hedges its cash flows, accounts for withholding taxes and limits on interest deductions, considers host-country borrowing rules and the internal capital market and recommends a mix with its trade-offs.

How this INT 620 Module 8 milestone two example is built

The sample compares four sources for Kettle Moraine Process Systems' $160 million Gujarat plant: a rupee term loan from Indian banks at about 9 percent, a dollar intercompany loan from the parent at about 5.5 percent, euro borrowing by the Dutch subsidiary at about 3.5 percent relent to India and parent equity. Once expected rupee depreciation of about 2.5 percent a year is included, the dollar and euro loans' cost advantage shrinks, and they add currency risk to a rupee-earning subsidiary. Indian rules on foreign borrowing and limits on related-party interest deductions also bind. Drawing on Desai, Foley and Hines, Allayannis, Brown and Klapper and Kedia and Mozumdar, it recommends about 40 percent rupee debt and 60 percent parent equity.

Where the INT 620 Module 8 rubric puts the points

Milestone Two rubrics typically weigh the identification of financing options, comparison of effective costs, analysis of currency risk and matching, treatment of taxes and regulations, effects on the group's capital structure and the strength of the recommendation, along with APA style. Exemplary work compares options consistently after expected currency changes, explains the hedging value of local debt, recognizes regulatory and tax limits and recommends a defensible mix. Work loses points for comparing nominal interest rates across currencies, for ignoring currency mismatch, for overlooking withholding taxes or deduction limits, for assuming parent loans are free of rules and for recommendations without trade-offs. Linking drawdown and repayment to the construction schedule shows the financing has been thought through in practice, not only in theory.

INT 620 Module 8 help: the mistakes that cost points

List every realistic financing source for the investment, then estimate each one's effective cost in a common currency, adding expected depreciation or appreciation to nominal rates; a low coupon in a strong currency can be expensive. Ask what currency the project earns in, since debt in that currency offsets revenue and hedges economic exposure. Check host-country rules on foreign borrowing and limits on interest deductions, especially for loans from related companies, and the withholding tax on interest. Consider the group's total debt load and its internal capital market. Recommend a mix and explain what it gives up, then say how the mix should change as the project matures.

Get INT 620 Module 8 written to your instructions

Share the INT 620 Milestone Two guidelines and the investment you need to finance. We compare local, home and third-currency debt and equity on an apples-to-apples cost basis, weigh currency matching, taxes and local rules and recommend a mix. Delivered in two days or so, with the opening milestone free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 620 papers and related MS Finance samples

INT 620 Module 8 questions, answered

Where can I find a free INT 620 Module 8 Milestone Two sample?

This page has the full INT 620 Module 8 Milestone Two paper, choosing rupee, dollar or euro financing for a plant in India.

Why would a subsidiary borrow in local currency at a higher rate?

Because local debt matches local revenue, hedging currency risk, and because higher local rates often reflect expected depreciation, so the effective cost may be similar.

What is the international Fisher effect?

The idea that differences in nominal interest rates between countries reflect expected inflation and currency changes, so high-rate currencies are expected to depreciate.

Why do firms borrow in foreign currencies?

Research finds firms use foreign currency debt to hedge foreign revenue, to access deeper markets and sometimes for lower costs or tax and regulatory reasons.

What limits apply to intercompany loans to foreign subsidiaries?

Host countries may restrict foreign borrowing, cap interest rates and limit interest deductions on related-party debt, and they often impose withholding tax on interest paid abroad.